Annual Report to shareholders
Released
Released
Announcement PDF
ASX:ARO
ASX Announcement
30 October 2026
ABN 16 003 254 395 info@altorometals.com PO Box 7059
Cloisters Square PO
Perth Western Australia 6850
2026 ANNUAL REPORT
For the year ended 30 June 2026
Altoro Metals Limited (ASX: ARO) ("Altoro" or the "Company") attaches its Annual Report for the
year ended 30 June 2026.
The Annual Report is available on the Company's website at www.altorometals.com and is being
sent to those shareholders who have elected to receive a copy. The Company's 2026 Annual
General Meeting will be held on Monday 23 November 2026.
This announcement has been authorised for release by the Board of Altoro Metals Limited.
ENDS
For further information, please contact:
Altoro Metals Limited
Tony Wehby
Chairman
info@altorometals.com
Media & Investor enquiries
Jane Morgan
Director
jm@janemorganmanagement.com.au
CORPORATE DIRECTORY
Directors
Mr Anthony Wehby Non-Executive Chairman
Mr Vaughan (‘Tom’) Kent Executive Director
Dr Frank Bierlein Non-Executive Director
Mr Myles Campion Non-Executive Director
Company secretary
Mr Mark Pitts
Registered office
Level 5/191 St Georges Terrace
Perth, Western Australia
Australia
P: +61 8 9316 9100
E: info@altorometals.com
W: www.altorometals.com
Share register
Automic
Level 5/191 St Georges Terrace
Perth, Western Australia
Australia
P: 1300 288 664
Auditors
HLB Mann Judd
Level 4, 130 Stirling Street
Perth WA 6000
Australia
+61 8 9227 7500
Securities Exchange Listing
Altoro Metals Limited’s shares are listed on the Australian Securities
Exchange (ASX: ARO)
ALTORO METALS LIMITED | ANNUAL REPORT 2026 2
CONTENTS
I N T R O D U C T I O N
Chairman’s Letter 5
The Year at a Glance 6
O P E R A T I O N S
Review of Operations 8
Annual Mineral Resource Statement 17
Competent Persons Statements 18
F I N A N C I A L R E P O R T
Directors’ Report 21
Auditor’s Independence Declaration 34
Consolidated Statement of Profit or Loss and Other Comprehensive Income 35
Consolidated Statement of Financial Position 36
Consolidated Statement of Cash Flows 37
Consolidated Statement of Changes in Equity 38
Notes to the Consolidated Financial Statements 39
Consolidated Entity Disclosure Statement 62
Directors’ Declaration 63
Independent Auditor’s Report 64
S H A R E H O L D E R I N F O R M A T I O N
Schedule of Tenements 69
Summary of Joint Ventures and Governance Framework 71
ASX Additional Information 72
ALTORO METALS LIMITED | ANNUAL REPORT 2026 3
INTRODUCTION OPERATIONS FINANCIAL REPORT SHAREHOLDER INFORMATION
CHAIRMAN’S LETTER
Dear Shareholders,
Over the past year, Altoro has made important progress in re-
establishing its platform for growth. We have successfully raised
approximately $7 million in new capital, refreshed the Board and,
importantly, undertaken a substantive drilling campaign in
Cantabria, allowing us to advance our understanding of the
potential of our Spanish zinc assets. These achievements
strengthen the foundations from which to pursue the next stage
of the Company’s development.
Notwithstanding this progress, we recognise and share
shareholders’ disappointment that the Company’s share price
and market capitalisation have not yet reflected the work
undertaken or the potential of our assets. The Board remains
focused on translating operational progress into tangible value
for shareholders, while recognising the challenges that small
resource companies can face in attracting investment when their
asset base is concentrated in a single commodity or jurisdiction.
Corporate matters
During the year Non-Executive Director Mr Nicholas Farr-Jones and Managing Director Mr Stewart Dickson stepped down
from the Board. On behalf of the Board I thank them both for their contribution, and in Stewart’s case for his many years
leading the Company through the acquisition and development of the Spanish projects. Mr Tom Kent joined the Board in
February 2026 and moved into an executive role in March 2026, and Mr Myles Campion joined as a Non-Executive Director
in August 2026, bringing to the role more than 35 years of experience in the resources sector and a long involvement with
the European zinc industry.
The Company completed two placements during the year, raising $2.07 million in August and September 2025 and $5.0
million across two tranches in May and July 2026. I thank our shareholders, both long-standing and new, for that support.
Conclusion
Looking ahead, we see opportunities both to continue advancing our Spanish assets towards commercialisation and to
strengthen the Company’s longer-term growth prospects. We are working to assess opportunities that may complement our
existing portfolio, build scale and create additional value for shareholders. The Board will continue its focus in Spain and will
also be considering other opportunities for growth during the coming year.
Operationally, our priorities include surface drilling along the Novales trend, a Mineral Resource update, lodgement of the
next set of permit applications with the Cantabrian authorities and following up the results of the maiden drilling campaign at
Guajaraz.
On behalf of the Board, I thank our management, technical team and consultants in Spain and Australia for their work during
the year.
Yours sincerely,
Anthony Wehby
Non-Executive Chairman
ALTORO METALS LIMITED | ANNUAL REPORT 2026 5
INTRODUCTION OPERATIONS FINANCIAL REPORT SHAREHOLDER INFORMATION
THE YEAR AT A GLANCE
For the year ended 30 June 2026
A year in which Novales-Udías secured key permitting approvals and its Re-Start Study, two large
historical datasets were added, and Variscan became Altoro.
3.4Mt
Mineral Resource at 7.6% Zn and 0.9%
Pb, Novales-Udías (ASX announcement
9 December 2024)
20.76% Zn
Highest-grade intercept drilled by the
Company to date: 6.43m @ 20.76% Zn,
2.77% Pb in UDDT024, Udías (ASX
announcement 11 November 2025)
52,034m
Historical surface drilling from 146 holes
acquired over the Hipólita, Esperanza
and Ana Isabel licences (ASX
announcement 16 September 2025)
2
Key permitting approvals: the Restoration
Plan (September 2025) and the
Anteproyecto (December 2025) over the
San José and Udías mining licences
$7.07m
Raised before costs across two
placements: $2.07m in August and
September 2025 and $5.0m in May and
July 2026
111km²
Granted tenure over the 12 kilometre
Novales-Udías mineralised trend in
Cantabria
SAN JOSÉ MINE RE-START STUDY
Completed in March 2026, the Study sets out a staged, low capital starter operation using around 1.6 kilometres of existing
underground development at San José, drawing on about half of the current Mineral Resource. The outcomes of the Study,
and the cautionary statement that goes with them, are set out on page 9.
SINCE THE END OF THE YEAR
Guajaraz
Maiden diamond drilling programme
commenced, the first modern drilling at
the Project (ASX announcement 10 July
2026)
21.10% Zn
Channel sampling at Emilia returned
multiple high-grade intervals, including
2.65m @ 21.10% Zn (ASX
announcement 11 August 2026)
ARO
Variscan Mines Limited became Altoro
Metals Limited on 22 July 2026, trading
as ASX:ARO from 23 July 2026
ALTORO METALS LIMITED | ANNUAL REPORT 2026 6
INTRODUCTION OPERATIONS FINANCIAL REPORT SHAREHOLDER INFORMATION
REVIEW OF OPERATIONS
For the year ended 30 June 2026
HIGHLIGHTS
Government of Cantabria approval of the Restoration Plan (September 2025) and the Preliminary Mining Plan
(Anteproyecto) (December 2025) over the San José and Udías mining licences, permitting pre-works, underground
development and trial mining ahead of a restart.
San José Mine Re-Start Study completed in March 2026, outlining a staged starter operation with an 11 year initial mine
life (refer to the cautionary statement below).
Highest-grade intercept drilled by the Company to date at the Udías Mine, 6.43m @ 20.76% Zn and 2.77% Pb in
UDDT024, outside the current Mineral Resource.
Two historical datasets integrated, being 146 surface drillholes for 52,034m over the Hipólita, Esperanza and Ana Isabel
licences and 109 drillholes for 6,720m at the Emilia and Margarita mines.
Mineral Resource Estimate unchanged at 3.4Mt @ 7.6% Zn and 0.9% Pb.
$2.07 million placement completed in August and September 2025 and a $5.0 million two-tranche placement completed
in May and July 2026.
Board and executive leadership renewed, and the Company renamed Altoro Metals Limited (ASX:ARO) in July 2026.
Since year end, maiden diamond drilling commenced at Guajaraz and channel sampling at Emilia returned multiple high-
grade zinc intervals.
Overview
Altoro Metals Limited (ASX:ARO) (formerly Variscan Mines Limited) (Altoro or the Company) is focused on the exploration
and development of zinc and polymetallic projects in Spain. Its flagship is the Novales-Udías Zinc Project in Cantabria,
centred on the former producing San José and Udías underground mines, and it also holds the Guajaraz Zn-Pb-Ag-Cu
Project in the province of Toledo.
During the year the Company secured the key approvals for pre-works and trial mining at San José, completed the San
José Mine Re-Start Study, continued underground drilling at Udías and added two large historical datasets that extend its
understanding of the district well beyond the current Mineral Resource. The Board and executive leadership were renewed,
two placements were completed and, shortly after year end, the Company changed its name to Altoro Metals Limited and
commenced maiden drilling at Guajaraz.
As outlined on page 25, the proposed earn-in over the Midlands and Waterford zinc projects in Ireland did not proceed, and
the Company has since concentrated its efforts on its Spanish zinc and polymetallic projects at Novales-Udías and
Guajaraz.
Novales-Udías Zinc Project
The Novales-Udías Project is an advanced zinc-lead project in the Basque-Cantabrian Basin, approximately 30 kilometres
south-west of Santander in northern Spain. It comprises approximately 111 square kilometres of granted tenements over a
12 kilometre mineralised trend that hosts a number of historical zinc-lead mines, including San José, Udías, Emilia and
Buenahora, and is within trucking distance (approximately 180 kilometres) of the San Juan de Nieva zinc smelter operated
by Asturiana de Zinc, a subsidiary of Glencore. The Mineral Resource Estimate for the Project is 3.4 million tonnes at 7.6%
Zn and 0.9% Pb (refer ASX Announcement dated 9 December 2024) and was unchanged during the year.
ALTORO METALS LIMITED | ANNUAL REPORT 2026 8
INTRODUCTION OPERATIONS FINANCIAL REPORT SHAREHOLDER INFORMATION
REVIEW OF OPERATIONS
For the year ended 30 June 2026
Figure 1: Location of the Novales-Udías Zinc Project
Permitting and approvals
In September 2025 the Government of Cantabria formally approved the Restoration Plan over the San José and Udías
mining licences, and an extensive surface drilling campaign of 69 drillholes for approximately 13,800 metres was permitted
(refer ASX Announcement dated 3 September 2025).
In December 2025 the Government of Cantabria approved the Preliminary Mining Plan (Anteproyecto) over the same
licences (refer ASX Announcement dated 17 December 2025). The Anteproyecto defines the general characteristics of the
proposed operation and provides a framework for the early operational activities needed for a restart, including adaptation
of the existing underground infrastructure, mine access, haulage, electrical installation and drainage. Together with the
mining licences, the Restoration Plan and the annual Plan de Labores, it allows the Company to undertake pre-works,
underground development, trial mining and small-scale exploitation while the remaining permitting processes run in
parallel.
Licence / permit Status Notes
Mining licences Approved Valid to 2035, with the ability to extend for a further 30 years
Restoration Plan Approved September 2025
Plan de Labores Approved Work plan submitted annually
Anteproyecto Approved Preliminary Mining Plan, December 2025
Table 1: Permitting status of the San José and Udías mining licences
Further permits are required to support a final investment decision. Since year end the Company has appointed an
additional senior mining engineer to support its Technical Director and is targeting submission of the Mine and Plant Project
and Restoration Plan to the Cantabrian authorities by the end of calendar 2026 (refer ASX Announcement dated 24
September 2026).
San José Mine Re-Start Study
The Company released the San José Mine Re-Start Study (the Study) in March 2026 (refer ASX Announcement dated 25
March 2026). The Study was prepared by Piran Mining to scoping study level (±35% accuracy) and sets out a staged, low
capital starter operation that makes use of approximately 1.6 kilometres of existing underground development at San José.
It draws on approximately half of the current Mineral Resource and does not include the adjacent Udías Mine, which the
Company sees as the main avenue for scaling the operation up over time. The key base case outcomes are summarised
below.
Study outcome (base case) Result
Initial mine life 11 years
ALTORO METALS LIMITED | ANNUAL REPORT 2026 9
INTRODUCTION OPERATIONS FINANCIAL REPORT SHAREHOLDER INFORMATION
REVIEW OF OPERATIONS
For the year ended 30 June 2026
Study outcome (base case) Result
Ore mined Approximately 1.6Mt at approximately 6.0% Zn and 0.8% Pb
Processing Modular 175ktpa plant on the existing site
Metallurgical recoveries 88% Zn, 80% Pb
Pre-production capital Approximately €19 million (A$33 million)
Pre-production period Approximately 2.5 years
Total cash cost Approximately €63/t (A$110/t)
Post-tax free cash flow Approximately €53 million (A$93 million)
Post-tax NPV (5% discount rate) Approximately €38 million (A$67 million)
Post-tax IRR 45%
Payback period Approximately 3.8 years
Price and exchange rate assumptions Zn US$2,932/t, Pb US$1,940/t, €1.00 = A$1.75
Table 2: Key outcomes of the San José Mine Re-Start Study (refer ASX Announcement dated 25 March 2026)
Following the Study the Company turned its attention to funding, early works planning and the permitting pathway required
to support a final investment decision, prioritising non-dilutive options such as debt, royalty, streaming and offtake, and
appointed Square Resources as its marketing manager.
Since year end the Company has noted that bringing the Udías, Emilia and Margarita workings into the mine plan offers
additional upside to the Study, and that a site visit by Non-Executive Director Mr Myles Campion identified efficiencies that
could streamline it (refer ASX Announcement dated 24 September 2026).
Cautionary statement
The Study is a scoping study prepared in accordance with the JORC Code (2012). It is a preliminary technical and economic
assessment of the potential viability of a restart of the San José Mine. It is based on low-level technical and economic
assessments that are not sufficient to support the estimation of Ore Reserves or to provide assurance of an economic
development case at this stage, or to provide certainty that the conclusions of the Study will be realised.
Approximately 35% of the production target over the life of mine is drawn from Inferred Mineral Resources, with 28% from
Measured and 37% from Indicated Mineral Resources. There is a low level of geological confidence associated with Inferred
Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral
Resources or that the production target itself will be realised.
The Study assumes pre-production funding of approximately €19 million (A$33 million). There is no certainty that the Company
will be able to raise that amount when needed, and funding may only be available on terms that dilute or otherwise affect the value
of the Company’s existing shares. The Company considers that it has reasonable grounds for the production target and forecast
financial information set out in the Study, as explained in the announcement of 25 March 2026. Investors should not make any
investment decisions based solely on the results of the Study.
Exploration
Udías Mine underground drilling
Underground diamond drilling at the Udías Mine returned the highest-grade intercept drilled by the Company to date (refer
ASX Announcement dated 11 November 2025). Results included:
UDDT024: 6.43m @ 20.76% Zn, 2.77% Pb
UDDT024: 4.65m @ 13.52% Zn, 0.61% Pb
UDDT030: 7.40m @ 11.22% Zn, 0.03% Pb
UDDT022: 7.65m @ 8.59% Zn, 1.77% Pb
UDDT030: 7.00m @ 7.83% Zn, 0.03% Pb
The intercepts correlate well with high-grade historical face sampling and confirm that mineralisation continues along
structural trends and into previously undrilled areas, approximately 80 metres from surface. All of the drilling completed at
Udías during the year lies outside the current Mineral Resource Estimate. Drilling recommenced in January 2026 (refer
ALTORO METALS LIMITED | ANNUAL REPORT 2026 10
INTRODUCTION OPERATIONS FINANCIAL REPORT SHAREHOLDER INFORMATION
REVIEW OF OPERATIONS
For the year ended 30 June 2026
ASX Announcement dated 21 January 2026), moving systematically along the existing mine development towards the
Mineral Resource in the north-east of the Udías Mine and the San José Mine beyond it.
Figure 2: Plan view of the southern part of the Udías Mine showing underground diamond drillholes, mine development and historical
face samples (refer ASX Announcement dated 11 November 2025)
Earlier in the year a high-resolution 3D laser survey of the Udías Mine mapped the historical workings in more detail than
was previously possible. It identified previously unrecorded extensions of underground development and has improved the
Company’s ability to target mineralisation beyond the current Mineral Resource (refer ASX Announcement dated 29
September 2025).
Historical surface drilling on the new licences
In September 2025 the Company acquired and integrated 146 historical surface drillhole records totalling 52,034 metres
over the recently granted Hipólita, Esperanza and Ana Isabel licences, all outside the current Mineral Resource footprint
(refer ASX Announcement dated 16 September 2025). Intersections included:
S-10: 24.0m @ 12.3% Zn, 0.4% Pb from 254m
S-457: 20.9m @ 14.0% Zn, 0.8% Pb from 370m
S-414: 17.6m @ 14.7% Zn, 0.7% Pb from 382m
S-17: 9.5m @ 24.7% Zn, 1.2% Pb from 365m
S-6: 2.7m @ 36.3% Zn, 2.2% Pb from 271m
S-21: 15.0m @ 6.4% Zn, 0.0% Pb and 6.0m @ 9.6% Zn, 0.0% Pb from 108m
The acquisition took the Project drilling database to 1,221 drillholes for 138,570 metres.
ALTORO METALS LIMITED | ANNUAL REPORT 2026 11
INTRODUCTION OPERATIONS FINANCIAL REPORT SHAREHOLDER INFORMATION
REVIEW OF OPERATIONS
For the year ended 30 June 2026
Figure 3: Historical drilling results on the Company’s Cantabrian licences (refer ASX Announcement dated 16 September 2025)
Emilia and Margarita
In May 2026 the Company completed a review and integration of a further historical database covering the Emilia and
Margarita mines, approximately 2.3 kilometres north-east of San José, comprising 109 drillholes for approximately 6,720
metres together with underground sampling, geological mapping and mine development records (refer ASX Announcement
dated 11 May 2026). Historical drilling beneath the Emilia Mine returned 0.85 metres at 23.47% Zn, 1.50 metres at 14.22%
Zn and 2.00 metres at 11.29% Zn, and historical underground channel sampling returned 2.85 metres at 33.50% Zn and
3.85 metres at 24.50% Zn and 11.76% Pb. The database is being incorporated into the Company’s three-dimensional
geological model to support future targeting.
ALTORO METALS LIMITED | ANNUAL REPORT 2026 12
INTRODUCTION OPERATIONS FINANCIAL REPORT SHAREHOLDER INFORMATION
REVIEW OF OPERATIONS
For the year ended 30 June 2026
Figure 4: Plan view of historical underground drilling and face sampling results from the upper levels of the Emilia Mine (refer ASX
Announcement dated 11 May 2026)
Figure 5: Simplified geological cross-section showing the continuity between the San José Mine and the Margarita and Emilia mines to
the north-east
Since year end, systematic channel sampling at Emilia returned multiple high-grade zinc intervals, including 2.65m @
21.10% Zn (E-1), 2.60m @ 18.55% Zn (E-2B), 1.40m @ 16.00% Zn (E-6A), 1.70m @ 15.40% Zn and 3.24% Pb (E-7A),
2.70m @ 14.05% Zn (E-11) and 2.90m @ 13.30% Zn and 0.84% Pb (E-3) (refer ASX Announcement dated 11 August
2026).
In September 2026 the Company reported that underground drilling at Emilia had intersected a structurally controlled zinc
system, with assays from the first nine holes pending. Landowner access agreements are in place for an initial 20 surface
ALTORO METALS LIMITED | ANNUAL REPORT 2026 13
INTRODUCTION OPERATIONS FINANCIAL REPORT SHAREHOLDER INFORMATION
REVIEW OF OPERATIONS
For the year ended 30 June 2026
drillholes from 15 pads, the first phase of which will test the corridor between the central Novales workings and Emilia. The
Company intends that its next Mineral Resource Estimate will bring the San José, Udías, Emilia and Margarita workings
together as a single Novales Project, and is targeting that update for the first quarter of calendar 2027 (refer ASX
Announcement dated 24 September 2026).
Members of the Company’s team preparing for drilling at Emilia
Government and community engagement
In June 2026 the Board and senior management visited the Project with the Company’s technical consultants and met the
President of Cantabria, Ms María José Sáenz de Buruaga, the Regional Minister for Industry, Employment, Innovation and
Trade, and the Mayors of Novales and Udías.
Guajaraz Project
The Guajaraz Zn-Pb-Ag-Cu Project is wholly owned and lies within the historic La Unión Mining District in the province of
Toledo, central Spain. The investigation permit (P.I. Guajaraz No. 4.203) covers approximately 1,530 hectares. During the
year the Company completed geological interpretation and drill planning, drawing on historical mining records, geological
mapping and an 8.5 line-kilometre Deep Ground Penetrating Radar survey to define targets alongside and beneath the
historical workings, which extend to approximately 280 metres depth.
Subsequent to year end the Company commenced its maiden diamond drilling programme of approximately 1,400 metres,
the first modern drilling at the Project (refer ASX Announcement dated 10 July 2026). Drilling was completed on 15 October
2026. Core logging is under way, after which samples will be submitted for assay.
ALTORO METALS LIMITED | ANNUAL REPORT 2026 14
INTRODUCTION OPERATIONS FINANCIAL REPORT SHAREHOLDER INFORMATION
REVIEW OF OPERATIONS
For the year ended 30 June 2026
Figure 6: Location of the 2026 diamond drillholes at the Guajaraz Project
Australian interests
Altoro retains a 49% interest in the Callabonna Project (EL 6318) in South Australia, with Red Metal Limited holding the
remaining 51% as manager. In March 2026 Red Metal entered into an earn-in agreement with Chalice Mining Limited over
Red Metal’s interest, under which Chalice has a minimum commitment to drilling into the underlying basement rocks within
the first twelve months (refer ASX Announcement dated 18 March 2026). Altoro’s interest and its rights under the existing
agreement are unchanged. The Company’s other Australian interests are a 39.2% interest in the Hillston Project (EL 6363)
in New South Wales and royalty interests, details of which are set out in the Schedule of Tenements. No exploration
expenditure was capitalised in respect of the Australian interests during the year.
Corporate
Capital raising
In August and September 2025 the Company issued 413,000,000 shares at $0.005 per share under the placement
announced on 5 August 2025, raising $2,065,000 before costs. Following shareholder approval, a further 51,301,372
shares were issued on 29 September 2025 in full satisfaction of a $250,000 shareholder loan and $6,507 of accrued
interest. Placement participants received one free-attaching option for every two shares, exercisable at $0.008 on or before
29 September 2028.
In January 2026 the Company entered into a binding term sheet for an unsecured $1,000,000 convertible loan note facility
(refer ASX Announcement dated 30 January 2026). The facility was not drawn and was cancelled on 19 May 2026.
In May 2026 the Company announced a $5.0 million placement at $0.004 per share (refer ASX Announcement dated 11
May 2026). Tranche 1 of 174,064,708 shares raised $696,259 and was completed on 19 May 2026. Tranche 2 of
1,075,935,292 shares, raising $4,303,741, was approved by shareholders on 10 July 2026 and completed on 16 July 2026,
when 416,666,666 lead manager options were also issued.
In September 2026 the Company lodged a cleansing prospectus and applied for quotation of its options exercisable at
$0.008 on or before 29 September 2028, which are now quoted on ASX under the code AROAH.
ALTORO METALS LIMITED | ANNUAL REPORT 2026 15
INTRODUCTION OPERATIONS FINANCIAL REPORT SHAREHOLDER INFORMATION
REVIEW OF OPERATIONS
For the year ended 30 June 2026
Change of name
On 22 July 2026 the Company changed its name from Variscan Mines Limited to Altoro Metals Limited, and its ASX code
changed from VAR to ARO on 23 July 2026.
Board and management
Mr Nicholas Farr-Jones resigned as a Non-Executive Director on 6 February 2026, and Mr Vaughan (‘Tom’) Kent was
appointed a Non-Executive Director on the same date. Mr Stewart Dickson resigned as Managing Director on 30 March
2026, and on the same date Mr Kent moved to an executive role. Mr Myles Campion was appointed a Non-Executive
Director on 6 August 2026.
Investment
On 14 August 2026 the Company made an investment of $255,000 in Fidelity Minerals Corp., an exploration company listed
on the TSX Venture Exchange (TSX-V: FMN).
Financial position
The Group recorded a loss after income tax of $1,452,095 for the year (2025: $920,387). Cash at 30 June 2026 was
$411,730 (2025: $451,939), before the $4,303,741 received from tranche 2 of the placement in July 2026. The Group
capitalised $1,530,178 of exploration and evaluation expenditure during the year, and deferred exploration and evaluation
expenditure at 30 June 2026 was $12,179,767 (2025: $10,672,695).
Looking ahead
The Company’s priorities for the coming year are:
surface drilling along the Novales trend, starting with the corridor between the central Novales workings and Emilia;
reporting the outstanding assays from Emilia, Udías and Guajaraz;
an updated Mineral Resource Estimate bringing San José, Udías, Emilia and Margarita together as a single Novales Project;
submission of the Mine and Plant Project and Restoration Plan to the Cantabrian authorities; and
progressing a funding pathway for the restart of the San José Mine.
ALTORO METALS LIMITED | ANNUAL REPORT 2026 16
INTRODUCTION OPERATIONS FINANCIAL REPORT SHAREHOLDER INFORMATION
ANNUAL MINERAL RESOURCE STATEMENT
As at 30 June 2026
Annual Review
The Company has reviewed its Mineral Resources as at 30 June 2026 and has compiled this Mineral Resource Statement
in accordance with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves (JORC Code), Chapter 5 of the ASX Listing Rules and ASX Guidance Note 31. The Company has no Ore
Reserves.
San José Mine – Novales-Udías Project
The San José Mine is within the Company’s Novales-Udías Project near the town of Novales in Cantabria, Spain. The
Project is centred on the former producing San José and Udías underground zinc-lead mines, with a large surrounding area
of exploration opportunities along the Novales trend, including a number of satellite underground and surface workings. The
San José deposit and the adjacent north-eastern part of the Udías deposit were both mined for zinc during the 20th century.
The current Mineral Resource Estimate was prepared with the assistance of Asturmine and reported on 9 December 2024,
replacing the estimate first reported on 28 November 2023.
Mineral Resources
As at 30 June 2026, total JORC (2012) Measured, Indicated and Inferred Mineral Resources were as follows:
Deposit Classification
Tonnes
(000’s)
Zn (%) Pb (%)
Zn + Pb
(%)
Zn (000’s
t)
Pb (000’s
t)
Zn + Pb
(000’s t)
San José Measured 480 9.18 1.80 10.98 44 9 53
Indicated 642 8.69 1.50 10.19 56 10 65
Measured & Indicated 1,122 8.90 1.63 10.53 100 18 118
Inferred 615 8.15 1.03 9.18 50 6 56
Sub-total 1,737 8.63 1.42 10.05 150 25 175
San José (NE) Inferred 932 5.72 0.20 5.92 53 2 55
Udías (NE)* Inferred 710 7.60 0.47 8.07 54 3 57
Total Measured 480 9.18 1.80 10.98 44 9 53
Indicated 642 8.69 1.50 10.19 56 10 65
Measured & Indicated 1,122 8.90 1.63 10.53 100 18 118
Inferred 2,256 6.97 0.51 7.48 157 12 169
Total 3,379 7.61 0.88 8.49 257 30 287
San José Mine – Novales-Udías Project – Mineral Resource as at 30 June 2026 (refer ASX Announcement dated 9 December 2024)
* No 3D underground mine model is available for the Udías NE deposit and, as a result, all resources in this area have been classified as
Inferred and their actual value may be lower than reported. Mineral Resources are reported above a 2% Zn+Pb cut-off. Differences may
exist due to rounding.
Review of material changes
There has been no change to the Mineral Resource Estimate since 30 June 2025. Exploration during the year, including the
underground drilling at Udías and the historical datasets added for the Hipólita, Esperanza, Ana Isabel, Emilia and
Margarita areas, was outside the current Mineral Resource and has not been incorporated into it. The Company intends to
incorporate that information in its next Mineral Resource update.
Tonnes (000’s) Zn (%) Pb (%) Zn + Pb (%)
Measured 480 9.18 1.80 10.98
Indicated 642 8.69 1.50 10.19
Inferred 2,256 6.97 0.51 7.48
Total at 30 June 2026 3,379 7.61 0.88 8.49
Total at 30 June 2025 3,379 7.61 0.88 8.49
Change - - - -
Comparison of total Mineral Resources at 30 June 2026 and 30 June 2025
ALTORO METALS LIMITED | ANNUAL REPORT 2026 17
INTRODUCTION OPERATIONS FINANCIAL REPORT SHAREHOLDER INFORMATION
ANNUAL MINERAL RESOURCE STATEMENT
As at 30 June 2026