GUAJARAZ DRILLING PROGRAMME REVISION
TO UPDATE ANNOUNCEMENT DATED 29 SEPTEMBER 2026
Altoro Metals Limited (ASX: ARO) ("Altoro" or the "Company") refers to its announcement dated 29
September 2026 and advises that it has drafted a revised version which is appended to this
announcement.
The revision has been made to comply with requirements under ASX’s Listed@ASX Supervision Update
04/23 guidance and Listing Rule 5.7.1 for the inclusion of JORC Table 1.
The original announcement did not contain the relevant cautionary statement, which has now been
added, together with the retraction of references to geological observations made with respect to partially
completed drill hole G5 which were premature, the Company will update the market on receipt of assays.
This announcement has been authorised for release by the Board of Altoro Metals Limited.
ENDS
For further information, please contact:
Altoro Metals Limited
Tony Wehby
Chairman
info@altorometals.com
Media & Investor enquiries
Jane Morgan
Director
jm@janemorganmanagement.com.au
About Altoro Metals Limited
Altoro Metals Limited is an ASX-listed exploration company focused on advancing a portfolio of zinc and
polymetallic projects in Spain. The Company’s flagship Novales-Udías Project in Cantabria encompasses
the former-producing San José underground mine and a broader mineralised district with substantial
exploration potential. Altoro is also advancing the Guajaraz Zn-Pb-Ag-Cu Project in central Spain, where
a maiden diamond drilling programme is planned to test priority targets within a historically mined but
underexplored polymetallic system. With a strengthened balance sheet and active exploration
programmes across both projects, Altoro is focused on defining and expanding high-quality base and
critical metals opportunities in established European mining jurisdictions.
ASX:ARO
ASX Announcement
2 October 2026
ABN 16 0 0 3 254 395 in fo@a ltorom e ta ls.com P O Box 70 59
Cloiste rs Sq u are P O
P e rth We ste rn Au stralia 6850
GUAJARAZ MAIDEN DRILLING PROGRAMME ADVANCES WITH THREE HOLES
COMPLETED AND FINAL HOLES UNDERWAY
Drilling continues to test the depth and western extension of the historical La
Unión Zn-Pb-Ag mineral system
Highlights
• Diamond drilling continues at the Guajaraz Zn-Pb-Ag Project in Toledo Province,
central Spain, with the maiden programme progressing through its priority target areas.
• Drilling strategy dynamically updated to target zones with the highest potential for
significant grade and tonnage, capitalising on the strong macroeconomic environment
with the LME zinc price recently surpassing US$4,000/t.
• Drilling locations have been refined as geological information is received from the initial
holes, with three holes completed and two currently in progress.
• G-03 intersected a number of brown sphalerite veinlets, providing evidence of zinc
mineralisation within the broader system at depth.
• Core from the Guajaraz holes is being systematically logged and sampled, with assay
results expected within 6 weeks.
• The Company is progressing the application for a three-year extension of the Guajaraz
exploration permit.
• Following the completion of hole G-01, the Company intends to mobilise one of the drill
rigs to Cantabria to commence the next phase of its surface drilling programme at the
Novales-Udías Project.
Cautionary Statement
Visual estimates of mineral abundance should never be considered a proxy or substitute for
laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuations.
Guajaraz Drilling Programme
Altoro Metals Limited (ASX: ARO) ("Altoro" or the "Company") is pleased to provide an update on
the progress of its maiden diamond drilling programme at the Guajaraz Zn-Pb-Ag Project in Toledo
Province, central Spain. This update is further to the Company's announcements dated 10 July 2026
("Maiden Drilling Programme at Guajaraz Zn (Pb-Ag) Project About to Commence") and 3 June 2026
("Surface and Underground Drilling Advancing at the Novales Project").
This campaign reflects the Company's dual-district strategy, establishing an active geographic
footprint in Castilla-La Mancha, several hundred kilometres south of the flagship Novales-Udías
Project in Cantabria, northern Spain.
Figure 1: Guajaraz location map
The Guajaraz programme was designed to test a series of high-priority zinc-polymetallic targets
generated through geological mapping, historical mine data, and an 8.5 line-kilometre Deep Ground
Penetrating Radar (DGPR) survey. The programme consists of c. 1,400 metres of drilling, designed
principally to test for deep-seated carbonate-hosted replacement-style zinc mineralisation as well as
sub-parallel structures associated with the historical La Unión (La Económica) mine.
The historical mining system extends to approximately 280m depth over multiple levels and is known
to have produced Pb-Zn mineralisation with significant historical silver credits. The Company's drilling
strategy has deliberately avoided the principal known mine workings and instead seeks to test the
broader mineral system around and beneath the historical workings.
Figure 2: Guajaraz Drill Hole location map
Drilling Progress Summary
Drilling has progressed through a number of different geological settings, with the results of the initial
holes being used to successfully refine the structural and lithological architecture of the Guajaraz
mineral system.
Hole Current Status Target Objective Key Geological Observations
G-
02
Completed
157.05m
Displaced eastern
continuation of the
main vein structure
Drill core has been transported to
site facilities; undergoing logging
and assessment.
G-
03
Completed
121.00m
Sub-parallel
structure and
testing calc-silicate
outcrops
Intersected veinlets of brown
sphalerite, confirming zinc
mineralisation at depth. Drill core
has been transported to site
facilities; undergoing logging and
assessment.
(refer Appendix 1)
Hole Current Status Target Objective Key Geological Observations
G-
04
Completed at 53.35m
(the hole was stopped
early after reaching first
target zone, in order to
promptly relocate to
promising location G-05)
Upper part of the
main vein structure
with optional
testing for deep-
seated targets
Intersected the metasedimentary
rock package exposed at surface,
providing a valuable new
structural constraint.
G-
05
In Progress (~269.20m)
Western side of
historical vein
system
Intersected a substantial section
of metasedimentary rocks before
entering gneissic rock with strong
hydrothermal alteration.
G-
01
Paused (~256m). Hole
is now being redrilled
because of previous
technical failure and the
twin hole is presently at
199.20m
Deeper geological
setting / skarn
Predominantly migmatitic to
increasingly leucocratic granitoid
rocks.
Note: The above table is laid out in chronological, rather than numerical order. The Company will provide
assay results for completed holes when analytical work and quality control procedures are finalised
(expected within 6 weeks). With respect to the limited visual observations made, the Company
refers reader to the Cautionary Statement below.
Cautionary Statement
Visual estimates of mineral abundance should never be considered a proxy or substitute for
laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuations.
Geological Interpretation
The geological information generated during the programme is being used progressively to refine the
Company's understanding of the Guajaraz system.
The original exploration model contemplated that the deeper portions of the historical mine area could
contain carbonate-replacement zinc mineralisation associated with a favourable
metasedimentary/carbonate sequence. The drilling to date has demonstrated that the subsurface
geology is more complex than suggested by surface exposures alone, with substantial variations
between granitoid/migmatitic, metasedimentary, and gneissic units across the drill sections.
In particular, the intersection of the metasedimentary package in G-04 and G-05 provides an important
constraint on the geological model and supports continued evaluation of the western portion of the
system. The presence of two sphalerite veinlets in G-03 also confirms zinc sulphide mineralisation
within the deeper sequence, although the Company cautions that the significance of these
observations cannot be assessed until analytical results are available. The first of these veinlets occurs
at 112.3 m and has a true thickness between 0.3 and 1.5 cm, whereas the second one occurs at 114.6
m and has a true thickness between 0.3 and 1.5 cm, both being inclined at about 40° to the drill core
axis. Assuming a 1.0 m drill core sampling interval, either of these zinc sulphide veinlets would amount
to less than 1.0 vol.%
Cautionary Statement
Visual estimates of mineral abundance should never be considered a proxy or substitute for
laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuations.
The Company will continue to assess all drill core using geological logging, sampling, and laboratory
analysis, including consideration of mineralogical information where appropriate.
Next Steps
The immediate priority is to complete the current Guajaraz drilling programme and obtain assay results
from the completed holes. The Company will:
• Finalize drilling of hole G-05 on the western side of the historical mine system.
• Finalize drilling of hole G-01 to fully test the deeper geological objectives of the programme.
• Complete geological logging, sampling, and submission of Guajaraz core for laboratory
analysis.
• Assess the combined geological and assay results to determine the most prospective areas
for future drilling.
• Continue progressing the application for a three-year extension of the Guajaraz exploration
permit.
Once hole G-05 is completed, the Geoplanning drill rig is scheduled to mobilise to the Company's
flagship Novales-Udías Zinc Project in Cantabria, where surface drilling is planned to test extensions
of the Company's established zinc mineralised corridor. The Guajaraz programme is being undertaken
in parallel with the Company's ongoing work at Novales-Udías, where underground drilling at Emilia
has identified a broad and tightly structurally controlled zinc mineralised system requiring further
drilling and resource definition.
The full suite of drill hole data with JORC Table 1 information will be presented once assays
are received.
This announcement has been authorised for release by the Board of Altoro Metals Limited.
ENDS
For further information, please contact:
Altoro Metals Limited
Tony Wehby
Chairman
info@altorometals.com
Media & Investor enquiries
Jane Morgan
Director
jm@janemorganmanagement.com.au
About the Guajaraz Project
The Guajaraz Project comprises a 1,530-hectare brownfield exploration permit in the Central Zone of the
Iberian Massif, encompassing parts of the Mazarambroz, Pulgar, Casasbuenas, and Noez municipalities
in Toledo Province, Castilla-La Mancha, central Spain. The project takes its name from the local Guajaraz
stream, which rises near Mazarambroz before eventually flowing into the Tagus river.
The project is centred on the historical La Unión (La Económica) mine near Mazarambroz and includes
seven known mineral occurrences. Historical mining occurred intermittently from 1945 until the mid-1980s,
with workings extending to approximately 280m depth over ten levels. Historical records indicate production
of Pb-Zn sulphide mineralisation, including galena and sphalerite, with reported silver credits. Historical
exploration also identified a number of additional mineralised structures and occurrences across the project
area. Altoro's current exploration programme follows geological mapping, geochemical sampling, and an
8.5 line-kilometre DGPR survey undertaken to identify and prioritise targets for modern exploration.
The maiden drilling programme is designed to test the continuity of the mineral system at depth and along
strike and to establish a modern geological framework for future exploration.
Competent Person Statement
The information in this announcement that relates to technical information and exploration results for the
Guajaraz Project is based on, and fairly represents, information and supporting documentation compiled
and reviewed by Dr Mike Mlynarczyk, Principal of Redstone Exploration Services, a geological consultancy
acting as an external consultant to Altoro Metals. Dr Mlynarczyk is a Professional Geologist (PGeo) of the
Institute of Geologists of Ireland and European Geologist (EurGeol) of the European Federation of
Geologists, as well as Fellow of the Society of Economic Geologists (SEG). Dr Mlynarczyk has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the
activity being undertaken to qualify as a Competent Person as defined in the December 2012 edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC
Code). Dr Mlynarczyk consents to the inclusion in the announcement of the matters based upon his
information in the form and context in which it appears.
The information in this document that relates to previous exploration results was prepared pre-2012 JORC
code. It is the opinion of the Company that the exploration data is reliable. Although some of the data is
incomplete, nothing has come to the attention of the Company that causes it to question the accuracy or
reliability of the historic exploration.
Forward-Looking Statements
This announcement may contain forward-looking statements, including statements regarding planned
exploration activities, drilling, timing of drilling and receipt of assay results, future exploration programmes
and the Company's exploration strategy. Forward-looking statements are only predictions and are subject
to known and unknown risks, uncertainties and assumptions, many of which are outside the control of the
Company. Actual results may differ materially from those expressed or implied by such statements. Past
performance is not necessarily a guide to future performance. The Company makes no representation or
warranty as to the likelihood of achievement or reasonableness of any forward-looking statements. The
occurrence of events in the future is subject to risks, uncertainties and other factors that may cause the
Company's actual results, performance or achievements to differ materially from those referred to in this
announcement. Given these uncertainties, recipients are cautioned not to place undue reliance on forward-
looking statements. The Company undertakes no obligation to update or revise any forward-looking
statements, except as required by applicable law or the ASX Listing Rules.
APPENDIX 1
PRINCIPAL VISUAL OBSERVATIONS OF MINERALIZATION IN DRILL CORE FROM THE
ONGOING DIAMOND DRILLING PROGRAM AT GUAJARAZ (September 2026)
DRILL
HOLE
NO.
UTM_X UTM_Y
Z (collar,
m a.s.l.)
NATURE OF
OCCURRENCE
MINERALS
OBSERVED
ESTIMATED
ABUNDANCE
(vol. % in a 1-
meter drill core
interval)
SENT
TO
LAB
G-03 406261.515 4398025.768 648.946
Veinlet of sphalerite 0.3-
1.5 cm thick, at an angle
of 40° to drill core axis,
observed at 112.23-
112.36m depth
sphalerite <1.0 % no
G-03 406261.515 4398025.768 648.946
Veinlet of sphalerite 0.3-
1.7 cm thick, at an angle
of 40° to drill core axis,
observed at 114.51-
114.65m depth
sphalerite <1.0 % no
APPENDIX 2
JORC Table 1, Sections 1 and 2
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of
sampling (e.g., cut channels,
random chips, or specific
specialised industry standard
measurement tools
appropriate to the minerals
under investigation, such as
down hole gamma sondes, or
handheld XRF instruments,
etc). These examples should
not be taken as limiting the
broad meaning of sampling.
• Include reference to measures
taken to ensure sample
representativity and the
appropriate calibration of any
measurement tools or systems
used.
• Aspects of the determination
of mineralization that are
Material to the Public News
release.
• In cases where ‘industry
standard’ work has been done
this would be relatively simple
(e.g., ‘reverse circulation
drilling was used to obtain 1 m
samples from which 3 kg was
pulverised to produce a 30 g
charge for fire assay’). In other
cases more explanation may
be required, such as where
there is coarse gold that has
inherent sampling problems.
Unusual commodities or
mineralization types (e.g.,
submarine nodules) may
warrant disclosure of detailed
information.
• The information referenced in this report relates to drill
core samples from an ongoing diamond drilling campaign
of Altoro Metals at the Guajaraz project, Toledo province,
Central Spain. Drill core from the holes already completed
has been transported to the core shack of the Company
in Cantabria, photographed, and is presently in the
process of being logged and sampled. No assay results are
reported in this announcement, as no assay results are
available yet.
Drilling
techniques
• Drill type (e.g., core, reverse
circulation, open-hole
hammer, rotary air blast,
auger, Bangka, sonic, etc) and
details (e.g., core diameter,
triple or standard tube, depth
of diamond tails, face-
sampling bit or other type,
• Ongoing diamond drilling at the Guajaraz project is being
carried out using a Rolatec RL-1000 drill rig and a second
Boart Longyear drill rig model LM-90. Core diameter is PQ
and HQ and no drill core orientation methods are used at
this reconnaissance stage.
Criteria JORC Code explanation Commentary
whether core is oriented and if
so, by what method, etc).
Drill sample
recovery
• Method of recording and
assessing core and chip
sample recoveries and results
assessed.
• Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
• Whether a relationship exists
between sample recovery and
grade and whether sample
bias may have occurred due to
preferential loss/gain of
fine/coarse material.
• Not applicable - no drilling results are reported in this
announcement.
Logging • Whether core and chip samples
have been geologically and
geotechnically logged to a level
of detail to support appropriate
Mineral Resource estimation,
mining studies and
metallurgical studies.
• Whether logging is qualitative
or quantitative in nature. Core
(or costean, channel, etc)
photography.
• The total length and
percentage of the relevant
intersections logged.
• Drill core from the holes already completed is presently in
the process of being logged and logging has not yet been
completed.
• Qualitative lithology, alteration, visible mineralization are
being recorded in the field notes, as drilling progresses.
Mineral identifications are visual and provisional;
quantitative mineralogical information is not reported.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn
and whether quarter, half or all
core taken.
• If non-core, whether riffled,
tube sampled, rotary split, etc.
and whether sampled wet or
dry.
• For all sample types, the
nature, quality and
appropriateness of the sample
preparation technique.
• Quality control procedures
adopted for all sub-sampling
stages to maximise
representativity of samples.
• Measures taken to ensure that
the sampling is representative
of the in-situ material collected,
including for instance results
for field duplicate/second-half
sampling.
• Not applicable - no drilling results are reported in this
announcement.
Criteria JORC Code explanation Commentary
• Whether sample sizes are
appropriate to the grain size of
the material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and
appropriateness of the
assaying and laboratory
procedures used and whether
the technique is considered
partial or total.
• For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the
parameters used in
determining the analysis
including instrument make and
model, reading times,
calibrations factors applied and
their derivation, etc.
• Nature of quality control
procedures adopted (eg
standards, blanks, duplicates,
external laboratory checks) and
whether acceptable levels of
accuracy (ie lack of bias) and
precision have been
established.
• Not applicable - no drilling results are reported in this
announcement.
Verification
of sampling
and assaying
• The verification of significant
intersections by either
independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary
data, data entry procedures,
data verification, data storage
(physical and electronic)
protocols.
• Discuss any adjustment to
assay data.
• Not applicable - no drilling results are reported in this
announcement.
Location of
data points
• Accuracy and quality of surveys
used to locate drill holes (collar
and down-hole surveys),
trenches, mine workings and
other locations used in Mineral
Resource estimation.
• Specification of the grid system
used.
• Quality and adequacy of
topographic control.
• The location of drill collars has been surveyed using an
ultra-high resolution Hi-target Inno1 GPS unit.
Criteria JORC Code explanation Commentary
Data spacing
and
distribution
• Data spacing for reporting of
Exploration Results.
• Whether the data spacing and
distribution is sufficient to
establish the degree of
geological and grade continuity
appropriate for the Mineral
Resource and Ore Reserve
estimation procedure(s) and
classifications applied.
• Whether sample compositing
has been applied.
• Not applicable - no drilling results are reported in this
announcement.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of
sampling achieves unbiased
sampling of possible structures
and the extent to which this is
known, considering the deposit
type.
• If the relationship between the
drilling orientation and the
orientation of key mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and
reported if material.
• Not applicable - no drilling results are reported in this
announcement.
Sample
security
• The measures taken to ensure
sample security.
• Drill core is being placed in wooden core boxes that are
subsequently securely stored at a locked on-site
warehouse, then transported via courier to the core
shack of the Company in Novales, Cantabria, where they
are securely stored at the locked on-site core shed, all
under the supervision of the Company’s geologists.
Audits or
reviews
• The results of any audits or
reviews of sampling techniques
and data.
• No audits or reviews have been conducted regarding the
ongoing drilling program at Guajaraz.
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number,
location and ownership
including agreements or
material issues with third
parties such as joint ventures,
partnerships, overriding
royalties, native title interests,
historical sites, wilderness or
national park and
environmental settings.
• The security of the tenure held at
• The Guajaraz exploration permit that is the object of
this news release is a single mineral permit owned by
Altoro Metals (through its local subsidiary Variscan
Mines La Mancha S.L.), named P.I. (Permiso de
Investigacion) “GUAJARAZ” Nº 4.203 (0-1-0). The
permit covers 120 mining cuadricules (1,530 ha) and is
valid and in good standing at the present moment. The
author is not aware of any issues that could affect
ongoing exploration works within this mineral permit.
Criteria JORC Code explanation Commentary
the time of reporting along with
any known impediments to
obtaining a licence to operate in
the area.
Exploration
done by other
parties
• Acknowledgment and appraisal
of exploration by other parties.
• The historical La Unión (La Economica) underground
mine at Guajaraz was intermittently active since the
19th century, and ceased around the mid-1980s. Its
workings focused on a single vein structure and
reportedly reached 280 m depth, with a dozen levels
and significant underground development. The mine
was principally worked for argentiferous galena and
sphalerite/blende, with historical concentrates
reportedly averaging about 70% Pb and 51–51.5% Zn,
with silver in the ore around 50–120 g/t Ag, producing
concentrates of 1,500–3,000 g/t Ag. In the 1980s an
exploration campaign including diamond drilling was
carried out in the area by Enadimsa, however, very
little information has been preserved in the IGME
archives in Madrid.
Geology • Deposit type, geological setting
and style of mineralization.
• The broader Guajaraz project area includes migmatites
to the north, an east-west trending belt of Paleozoic
metasediments in the central part of the area, and late
granitoids to the south. Mineralization at the project is
believed to occur as two distinct styles: (1) Vein/fissure
mineralisation: narrow E–W to ENE-trending veins,
commonly in gneiss and locally granite. The principal La
Unión vein strikes approximately N80E, with steep dips.
It is dominated by galena–sphalerite with quartz,
barite, calcite/fluorite and carbonate gangue. (2)
Tabular, skarn-like Zn-rich bodies in silicified limestone
packages enclosed within gneissic/migmatitic rocks.
Drill hole
Information
• A summary of all information
material to the understanding of
the exploration results including
a tabulation of the following
information for all Material drill
holes:
o easting and northing of the drill
hole collar
o elevation or RL (Reduced Level –
elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and
interception depth
o hole length.
• If the exclusion of this
information is justified on the
basis that the information is not
• Not applicable – no drilling results are reported in this
announcement, as the diamond drilling campaign of at
the Guajaraz project is still ongoing.
Criteria JORC Code explanation Commentary
Material and this exclusion does
not detract from the
understanding of the news
release, the Competent Person
should clearly explain why this is
the case.
Data
aggregation
methods
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum
grade truncations (eg cutting of
high grades) and cut-off grades
are usually Material and should
be stated
• Where aggregate intercepts
incorporate short lengths of
high-grade results and longer
lengths of low grade results, the
procedure used for such
aggregation should be stated
and some typical examples of
such aggregations should be
shown in detail.
• The assumptions used for any
reporting of metal equivalent
values should be clearly stated.
• Not applicable - no drilling results are reported in this
announcement.
Relationship
between
mineralization
widths and
intercept
lengths
• These relationships are
particularly important in the
reporting of Exploration Results.
• If the geometry of the
mineralization with respect to
the drill hole angle is known, its
nature should be reported.
• If it is not known and only the
down hole lengths are reported,
there should be a clear
statement to this effect (eg
‘down hole length, true width
not known’).
• Not applicable - no drilling results are reported in this
announcement.
Diagrams • Appropriate maps and sections
(with scales) and tabulations of
intercepts should be included for
any significant discovery being
reported These should include,
but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
• The information in this news release does not refer to
a new discovery, however, maps and figures have
been included to illustrate the location of the diamond
drill holes referenced in this news release.
Balanced
reporting
• Where comprehensive reporting
of all Exploration Results is not
practicable, representative
reporting of both low and high
grades and/or widths should be
• Not applicable - no drilling results are reported in this
announcement.
Criteria JORC Code explanation Commentary
practiced to avoid misleading
reporting of Exploration Results.
Other
substantive
exploration
data
• Other exploration data, if
meaningful and material, should
be reported including (but not
limited to): geological
observations; geophysical survey
results; geochemical survey
results; bulk samples – size and
method of treatment;
metallurgical test results; bulk
density, groundwater,
geotechnical and rock
characteristics; potential
deleterious or contaminating
substances.
• This report refers to an ongoing drilling program on the
Guajaraz property. No other exploration data
contained in this news release is considered sufficiently
meaningful or material to warrant further reference.
Further work • The nature and scale of planned
further work (eg tests for lateral
extensions or depth extensions
or large-scale step-out drilling).
• Diagrams clearly highlighting the
areas of possible extensions,
including the main geological
interpretations and future
drilling areas, provided this
information is not commercially
sensitive.
• Altoro Metals plan to complete the current drilling
programme at Guajaraz (ongoing holes G-01 and G-05),
complete the geological logging and sampling of the
drill core, and obtain assay results from the selected
drill core intervals.
• With the assay results in hand, combined with
geological data, the Company will determine the most
prospective areas for future drilling.
• Alt