AGM Presentation
Released
Released
Announcement PDF
I N V E S T O R P R E S E N T A T I O N – A N N U A L G E N E R A L M E E T I N G
NOVEMBER 2025
SPAIN’S NEXT
HIGH-GRADE
ZINC MINE
Powering The Energy Transition
ASX:VAR
Thisdocumentisfor informationpurposesonly. It isnot aprospectus, disclosure documentor offeringdocumentunder Australianlawor under anyother lawanddoesnot constituteanoffer or
invitation to apply for securities. In particular, this presentation is not an offer of securities for subscription or sale in Australia or any other jurisdiction in which such an offer or solicitation is not
authorisedor toany otherpersontowhomitisunlawfultomakesuchanoffer or solicitation.Theinformationinthis presentationisanoverviewanddoesnot containallinformationnecessaryto
makean investment decision. To the extent permitted by law, no representation or warranty, expressor implied, is madeas totheaccuracy, adequacy or reliability of any statements, estimates
or opinions or otherinformationcontained inthis presentation,anyof whichmaychange without notice andliability relatingtothosematters isexcluded.
Variscan MinesLimited, nor any related entity, nor any other person warrants thefutureperformance of, or any returnon any investment arranged by or in, Variscan Mines Limited or a related
entity of VariscanMines. Some of theinformationcontained in this presentationconstitutes forward-lookingstatements that are subject to variousrisks and uncertainties, not all of which may
be disclosed. These statements discuss future objectives or expectations concerning results of operations or financial condition or provide other forward-lookinginformation. The actual results,
performance or achievements couldbesignificantlydifferent fromtheresultsor objectivesexpressedin,or implied by, thoseforward-lookingstatements.
Prospective investors should make their own independent evaluation of an investment in any securities. The material contained in this document does not take into account the investment
objectives,financial situation or particular needs of any individualinvestor. Neither VariscanMinesnor any of its related entities makes any recommendationtoinvestors regarding thesuitability
of any securities and the recipient must make its own assessment and/or seek independent advice on financial, legal, tax and other matters, including the merits and risk involved, before
makinganyinvestments. Thispresentationandits contents maynot be retransmittedor otherwisereproduced or disclosedtothirdpartiesor madepublicinanyway,inwholeor inpart,for any
purpose without thewritten permissionof VariscanMines.
Where reference is madetoprevious releases of exploration resultsand mineral resourceestimates in this announcement, theCompany confirmsthat it is not aware of any new information or
data that materially affectstheinformationincluded inthoseannouncements andallmaterial assumptions andtechnical parameters underpinningtheexplorationresultsandmineral resource
estimates included inthoseannouncementscontinuetoapplyandhave not materiallychanged
ThisASXannouncementhasbeen approvedbytheBoardandauthorisedfor issuebyMrStewartDickson, ManagingDirectorandCEO, VariscanMinesLimited
DISCLAIMER &
IMPORTANT NOTICE
ASX:VAR
2
Purpose, Strategy & Delivery
ASX:VAR
Purpose To expand and develop our high-grade zinc assets to transition to a producing mining company
3
Our Explorer-Producer Strategy is designed to deliver: early cashflow from production at the San
Jose and Udías Mines, achieve attractive financial returns and sustainably fund ramp-up production
growth, exploit exploration upside and the overall development of our project portfolio.
Strategy
Zinc Focused Proven Assets
Key Points
Structural opportunity to supply local
markets as demand driven by energy
transition tailwinds
Ready for Mine Re-Start
San Jose & Udías Mines have proven track
record of high-grade zinc production
Near-term production opportunity
for cashflow to sustainably fund
ramp-up growth and exploration
upside
Delivery
Near-Term Production District Scale Exploration Selective & Accretive M&A
ASX:VAR
4
Sources:
(1) APT
Explorer-Producer Strategy
Opportunity to leverage brownfield assets+ greenfield upside
Saw-Tooth Growth Model: cashflow re-invested in phased scale-up →
Production ramp-up and increase in Exploration activity / tonnage
• VAR strategy to get best returns from its
primary asset
• Enter ‘starter operation’ production quickly
(enabled by endowment of brownfield
projects) aiming to facilitate:
✓ Phased production (modular) growth
✓ Exploration self-funded by cashflow
✓ Financial returns for shareholders
✓ Portfolio development
• Advantages to VAR shareholders:
✓ Re-rating opportunities as:
(i) transition into producer; and
(ii) scale increases through multiple,
phased step-ups.
✓ Lower risk execution – initial smaller project
with learnings applied as scale-up
✓ Less external financing risk as amounts are
smaller and organic cashflow able to be re-
deployed
✓ Less dilution for shareholders
Note: Conceptual / Illustrative Purposes Only
ASX:VAR
5
Sources:
(1) Refer ASX announcements 14 November 2024, 29 November 2024, 9 December 2024, 24 February 2025, 4 March 2025, 11 March 2025, 14 April 2025, 29 April 2025, 2 June 2025, 5 August 2025, 3
September 2025, 16 September 2025, 29 September 2025, 27 October 2025, 11 November 2025.
AGM – Year in Review
Significantprogress→ growingand advancingNovales-UdíasProject
Drilling results at Udías Mine
• UDDT024: 6.43m @ 20.76% Zn, 2.77% Pb
• UDDT030: 7.40m @ 11.22%Zn, 0.03% Pb
• UDDT022: 7.65m @ 8.59%Zn, 1.77% Pb
• UDDT024: 4.65m @ 13.52%Zn, 0.61% Pb
• UDDT030: 7.00m @ 7.83%Zn, 0.03% Pb
Nov Dec Jan Oct
Sept
Aug
Jul
Jun
May
Apr
Mar
Feb Nov
3x Mineral Resource Upgrade
• 2nd highest Zn grade MRE on ASX
• 3.4Mt @ 7.6% Zn, 0.9 %Pb
AGM ‘24
$2.25m capital
raise
3D laser
survey at
Udías Mine
+52,000m of
drilling data
acquired over
expanded
licence areas
San Jose Mine
Restoration Plan
approved
+13,000m surface
drilling permitted
AGM ‘25
Drilling results at Udías Mine
• UDDT016: 8.00m @ 9.60% Zn, 0.02%Pb
• UDDT016: 10.00m @ 5.58% Zn, 0.52% Pb
• UDDT009: 7.10m @ 3.85% Zn, 0.47%Pb
• UDDT009: & 5.00m @ 5.32% Zn, 0.59% Pb
• UDDT010: 5.40m @ 5.06% Zn, 0.20% Pb
2x new exploration
licences (Ana Isabel
& Hipólita) awarded
over 21.9 km2
Project upsized to
111km2
New website
launched
Drilling results at Udías Mine
• UDDT004: 20.1m @ 8.22% Zn, 1.72% Pb
• UDDT002: 16.5m @ 6.16% Zn, 0.87% Pb
• UDDT001: 7.8m @ 7.41% Zn, 0.68% Pb
• UDDT005: 11.4m @ 4.76% Zn, 0.24% Pb
• UDDT003: 11.0m @ 4.92% Zn, 0.04% Pb
Drilling results at San Jose Mine
• NDDT059: 15.3m @ 17.42% Zn, 4.40% Pb
• NDDT058: 14.30m @ 8.09% Zn, 1.28% Pb
• NDDT060: 15.25m @ 6.10% Zn, 0.46% Pb
Government of Cantabria support
for recommencing mining
$2m
underwritten
capital raise
Recent Developments
ASX:VAR
6
Sources:
(1) ASX announcement 5 August 2025
(2) ASX announcement 29 September 2025
(3) ASX announcement 16 September 2025
September 2025
• Second tranche placement (1)
to raise $2.25
million completed.
• Placement well supported by:
• Existing Top20 shareholders
• New sophisticated and professional
investors
WELL SUPPORTED CAPITAL
RAISE COMPLETED
September 2025
• 3D underground survey completed,
confirming extensive under-explored mine
development and identifying extensions of
high-grade mineralisation
• Connects Udías and San Jose Mines; both are
on the same mineral system
• Survey maps mine development of +7,500m
over 6 levels
• Provides critical, digital geospatial data for
future Mineral Resource Estimate (MRE)
update and mine planning
• Drilling underway targeting new zones
outside current MRE zones with assays
• expected imminently
3D LASER SURVEY AT
UDÍAS MINE (2)
September 2025
SURFACE DRILLING DATA
OVER NEW LICENCES (3)
• Acquisition of 146 historic drillholes for 52,034
metres, delivering multiple high-grade zinc
(Zn) and lead (Pb) intercepts across newly
granted licences; outside the current MRE
• Outstanding historic assays from Hipolita
Licence over the footprint of former Reocin
Mine and its extensions, including
• S-10: 24.0m @ 12.3% Zn, 0.4% Pb
• S-457: 20.9m @ 14.0% Zn, 0.8% Pb
• S-414: 17.6m @ 14.7% Zn, 0.7% Pb
• Newly integrated historic drilling data
provides significant time and cost saving
• Project drilling database now consists of 1,221
drillholes for 138,570 metres
SITE DEVELOPMENT
• Continue to invest in additional working areas
and core storage facilities constructed to
support current drilling
Recent Developments
ASX:VAR
7
Sources:
(1) ASX announcement 3 September 2025
(2) Meeting on 29 October 2025
(3) Shanghai Metals Market
September 2025
SAN JOSE MINE RESTORATION
PLAN APPROVED FOR MINING
LICENCE AREAS (1)
October 2025
• Invitation from Government of Western
Australia to a State Government Luncheon for
Her Excellency Ms. Esther Monterrubio Villar -
Ambassador of Spain (2)
• Key talking points regarding Spain :
✓ Strong policy tailwinds to support domestic
production of metals and critical minerals
✓ Efficient transportation & infrastructure
✓ Proximity to EU markets
✓ Availability of highly skilled labour
✓ Affordable and green energy abundance
✓ Deepening relationship and shared values
between Spain and Australia
POSITIVE POLITICAL
ENGAGEMENT
October 2025
• London Metal Exchange (LME) zinc price firmly
breached $3,000 per tonne
• Currently around year-to-date high
• Zinc has climbed around 5 per cent in last
month alone
• LME zinc stocks been depleted & barely
sufficient to cover one day of global zinc
consumption
• LME Cash-3M zinc spread exploded to $323 per
ton – the widest level since at least 1997. This
extreme price inversion is a sign of acute near-
term shortage (see chart) (3)
POSITIVE ZINC MARKET
DYNAMICS
• Clear and unambiguous permitting approval
to proceed to exploitation / re-commencing
mine production
• Restoration Plan covering the San Jose &
Udías Mines permits:
→ the management of waste from extractive
industries; and
→ the protection and rehabilitation of areas
affected by mining activities
• Mining Licence already granted to 2035 with
ability to extend for a further 30 years
• Extensive surface drilling campaign of 69
drillholes for ~13,800m also approved
Recent Developments → Near-Term Deliverables
ASX:VAR
8
• >20%Zn intercept drilled; highest grade
intercept at Udías Mine campaign to date:
• UDDT024: 6.43m @ 20.76% Zn, 2.77% Pb
• UDDT030: 7.40m @ 11.22%Zn, 0.03% Pb
• UDDT022: 7.65m @ 8.59%Zn, 1.77% Pb
• UDDT024: 4.65m @ 13.52%Zn, 0.61% Pb
• UDDT030: 7.00m @ 7.83%Zn, 0.03% Pb
• Drilling results reported from Udías to date
confirm significant growth potential outside of
current MRE footprint
DRILLING RESULTS FROM
UDÍAS MINE (1)
November 2025 November 2025
• Low risk, earn-in to highly prospective Zinc
assets in Ireland from MDF & ZIncCo
• Leveraging carbonate-hosted Zinc deposit
know-how & European footprint
• MDF to provide to VAR technical services and
subject matter expertise to assist with the
development of the assets in Spain and Ireland
• Access to MDF’s Mineral Eyes software to be
made available to VAR
• VAR granted the first right of refusal on zinc
projects generated by MDF
EARN-IN TO IRISH ZINC ASSETS
MDF TECHNICAL SERVICES &
FIRST RIGHT OPPORTUNITY (2)
Sources:
(1) ASX announcement 11 November 2025
(2) (Subject to shareholder approval at AGM.. Refer to Notice of Meeting dated 27 October 2025 for further transaction details, including Independent Experts Report
Q4 2025
• TOMRA engaged to conduct a Sortability Test
on ore samples from San Jose Mine to
evaluate the sorting potential by using XRT
technology
• The objective of the Sortability Test was to
separate material with galena and sphalerite
from the carbonates (host rock) using
TOMRA’s XRT full-scale sorter and define
different thresholds to establish an indicative
grade vs. recovery curve → reduce plant sizing
• HLS testing also completed as comparative
pre-concentration technique
PRE-CONCENTRATION MET
TEST WORK
Near-Term Deliverables – Results being Finalised
ASX:VAR
9
Q4 2025
• Preliminary laboratory testing to derive the
Uniaxial Compressive Strength (‘UCS’) of the
rock units at San Jose Mine
• Quantifying the rock strength properties and
domaining their locations → geotechnical
considerations in mine planning
• The current condition of the mine shows high
levels of rock competency and strength with
limited need for rock reinforcement systems
GEOTECHNICAL TEST WORK
Q4 2025
• San Jose ‘starter’ operation is a catalyst for
larger scale operation in due course
• Re-position VAR as cash-flow generating zinc
producer by 2027/8
• Cashflow to sustainably fund ramp-up
production growth and exploit exploration
upside
• Capex Lite approach to production → realistic
financing capability
• Leverage existing infrastructure and in-situ
mine development
MINE RE-START STUDY
(1)
Q4 2025
• Post Pre-Concentration, Characterisation and
Floatation testing → recovery and concentrate
quality results
• 3x rougher flotation tests and 1x open circuit
test (OCT) were carried out
FLOATATION MET TEST WORK
Corporate Snapshot
Anthony Wehby Stewart Dickson Dr. Frank Bierlein Nicholas Farr-Jones
Chairman Managing Director & CEO Non-Exec Director Non-Exec Director
10
ASX:VAR
Capital Structure
ASX Code VAR
Share Price(1) $0.007
Shares on issue 1,247,159,078
Options ($0.010, 30-Nov-26)
Options ($0.015, 30-Nov-26)
Options ($0.008, 29-Sep-28)
42.6m
152.7m
199.9m
Market Cap. (undiluted) $8.7m
Cash (30-Sep-25) $1.6m
Enterprise Value $7.1m
Proven track record Project development Financing Operational experience Successful financial exits
Sources:
(1) Share price as at 04 November 2025
ASX:VAR
11
Zinc
Future-facing metalcriticalforenergy transition &infrastructure
Sources:
(1) South 32 Business and Strategy Update Presentation. 14 May 2025
(2) Capital IQ; Center for Strategic and International Studies. 5 May 2025
(3) Panmure Liberum Equity Research 17 June 2025
(4) Goldman Sachs Equity Research 29 August 2025
Zinc industry larger than Lithium + Cobalt + Uranium combined
4th most consumed metal globally
$39Bn industry
80% of zinc ore worldwide is mined underground
Strong market fundamentals with positive pricing environment
Value of commodity markets 2025e(3)
Global Zinc Exploration Budget 2005–2024 (USD, millions)(2)
Falling ore grades and limited exploration through declining
exploration budgets but…
Primary demand up: expected to exceed production by ~4Mt to 2034,
presenting an opportunity similar to copper(1)
Goldman Sachs forecasts a large boost to industrial metals demand
from rising EU defence spending. Defence currently accounts for 2-
3% of global zinc demand (same as copper, aluminium, steel) (4)
ASX:VAR
12
Zinc
Risingprices +Depleted LME Inventories
Sources:
(1) LME,, Bloomberg in Panmure Liberum Equity Research 05 November 2025
(2) LME, Comex, SHFE, Bloomberg in Panmure Liberum Equity Research 05 November 2025
Zinc inventories vs LME price (US$/t, kt) (2)
Base Metals' price indices (12mth rolling) (1)
Stocks Less Than One Day of Global Demand
Refined zinc market most severe supply crunch in decades
LME Zinc Prices +$3,000 / tonne
Base metals upward price performance over LTM
ASX:VAR
13
Proven Assets: Right Location
Spain: one ofEurope’s mostactive miningjurisdictions
Sources:
(1) S&P Global https://cdn.ihsmarkit.com/www/pdf/0724/SPGlobal_NMA_DevelopmentTimesUSinPerspective_June_2024.pdf
(2) The 2023 Spanish Mining Statistics report, published by the Ministry for Ecological Transition and Demographic Challenge
Mine permitting times quicker than perception (1)
4th
largest EU economy
2nd
largest copper producer in Europe(2)
Only producer of strontium in Europe(2)
International mining companies established with multi-
decade track record of operating in Spain
ASX:VAR
14
Proven Assets: Past Production + Exploration
One of Europe’s highest-grade, development stage zinc deposits
• Premier Zinc-Lead District: Basque-
Cantabrian basin is well-understood &
hosts world-class former Reocín Mine,
produced approximately 62 Mt of ore
grading 8.7% Zn and 1.0% Pb(1).
• Near-Term Producer: San Jose & Udías
Mines targeting restart in 2027/8
• Growing, High Grade Mineral Resource:
3x uplift to 3.4Mt @ 7.6% Zn, 0.9% Pb in
Dec 2024(2)
• Upsize Mineral Resource Potential: Only
4.5km of 12km Novales Trend included
in MRE. Trend remains open on strike
and laterally
• Expanded Licence Area: 2x increase in
land holding since project entry to 111
km2 in proven Zinc mining jurisdiction(3)
Sources:
(1) Velasco, F., Herrero, J.M., Yusta, I., Alonso, J.A., Seebold, I. and Leach, D., (2003) ‘Geology and Geochemistry of the Reocin Zinc-Lead Deposit,
Basque-Cantabrian Basin, Northern Spain’ Econ. Geol. v.98, pp. 1371-1396.
(2) Refer ASX Announcement 9 December 2024
(3) Refer ASX Announcement 14 April 2025
ASX:VAR
JORC Mineral Resource Estimate
Novales-UdíasProject
3.1x growth in total tonnage , 2.6x growth in total contained zinc from 2023 MRE
Measured & Indicated Resources represent 67% of the Mineral Resource Estimate for San Jose Mine
Grades in the Measured category are higher (9.18% Zn) than any other category / deposit
Grade Contained Metal
Deposit
Mineral Resource
Classification
Tonnage
(t)
Zinc
(%)
Lead
(%)
Zinc + Lead
(%)
Zinc
(t)
Lead
(t)
Zinc + Lead
(t)
San Jose
Measured 480,254 9.18 1.80 10.98 44,064 8,654 52,718
Indicated 641,881 8.69 1.50 10.19 55,782 9,607 65,389
Measured & Indicated 1,122,135 8.90 1.63 10.53 99,845 18,262 118,107
Inferred 615,304 8.15 1.03 9.18 50,121 6,356 56,477
Sub-total 1,737,439 8.63 1.42 10.05 149,966 24,618 174,584
San Jose (NE) Inferred 931,608 5.72 0.20 5.92 53,306 1,860 55,165
Udías* (NE) Inferred 709,533 7.60 0.47 8.07 53,915 3,316 57,232
Total
Measured 480,254 9.18 1.80 10.98 44,064 8,654 52,718
Indicated 641,881 8.69 1.50 10.19 55,782 9,607 65,389
Measured & Indicated 1,122,135 8.90 1.63 10.53 99,845 18,262 118,107
Inferred 2,256,445 6.97 0.51 7.48 157,342 11,532 168,874
Total 3,378,580 7.61 0.88 8.49 257,187 29,794 286,981
Sources:
(1) Refer ASX announcement 9 December 2024
15
ASX:VAR
3D View of JORC Mineral Resource Estimate
16
San Jose Mine
Measured& Indicated Resources →BasisForMine Re-startStudy
Sources:
(1) Refer ASX announcement 9 December 2024
ASX:VAR
17
• Drilling upside with mineralisation at San Jose and Udías open in all directions
• Initial, high-grade resource: 1.7Mt @ 8.6% Zn, 1.4% Pb (1)
• Identified zones of mineralisation outside of current MRE, with confirmatory
drilling to be undertaken, could upsize MRE
• Restoration Plan over granted Mining Licences approved 2)
Proven Assets: High-Grade Zinc Project
Past Production→ Realistic Re-Start
Linking San Jose Mine & Udías Mine
San Jose ‘starter’ operation a catalyst for larger operation
Sources:
(1) Refer ASX Announcement 9 December 2024
(2) Refer ASX Announcement 3 September 2025
ASX:VAR
San Jose Mine Re-Start Study
Scoping Levelwith deliveryscheduled for Dec 2025
18
StudyObjectives
Cashflow to
sustainably fund
ramp-up production
growth and exploit
exploration upside
Re-position Variscan
as cash-flow
generating zinc
producer by 2027/8
Deliver a realistic
plan for early cash-
flow from small scale
production
StudyPhilosophy
Investigate
opportunities for
increased mining and
processing efficiency
Capex Lite approach
to production >
realistic financing
capability
Leverage existing
infrastructure and in-
situ mine development
• Mine Re-Start Study is well advanced and will provide basis to move
to FID
• Near term production opportunity, targeting production by 2027-28
• Objective to establish, profitable mining ‘starter’ operation with
modular processing plant on site
• Provide platform to sustainably finance exploration and add/replace
tonnes to scale up production and maintain Life of Mine
• Limited underground refurbishment required, making use of mine
development & locomotive tracks
• Lower environmental impact (incl. no visual impact) from utilising
existing mine → high levels of social acceptance
Mine Design: In-situ Potential Stoping Areas of San Jose
Orthogonal View looking North
ASX:VAR
19
• Valid Mining Licence & Restoration Plan
approval enables mining to commence
• Existing mine-site & regional infrastructure
results in:
✓ lower anticipated capex
✓ reduce timeframe to start operations
• Utilising existing infrastructure in excellent
condition
• Underground mine development extends
over a linear length of c. 2.5km (San Jose only)
• Replacement value of historical drilling
+A$22m(1)
San Jose Mine Re-Start Study
Ultra LowCapex Expected
Leveraging existing infrastructure with site lease agreed
Brownfield advantages to decrease
capital requirement & execution
risk
Sources:
(1) Management estimates based on current, actual drilling rates and costs incurred by the Company multiplied by number of metres
(2) Refer ASX announcement 29 January 2024
ASX:VAR
20
Near-term Producer Enablers
Strategicallylocatedwith world-classinfrastructure
World’s largest Zinc smelter(1)
within trucking distance (San Juan de
Neiva Zinc smelter owned by Glencore)
Met test underway to confirm concentrate specification & suitability
Onsite sealed road access already connected to regional network
Access to local ports for alternative smelters in Europe
Sources:
(1) https://www.glencoretechnology.com/en/technologies/albion-process/installations/san-juan-de-neiva
(2) International Lead and Zinc Study Group “The World Zinc Factbook 2024”
‘Europe is one of the most important continents for
refined zinc production’(2) led by major firms including:
ASX:VAR
21
Exploration drilling planned at San Jose Mine
Permitted for+13,000mhigh-impactsurface drillingcampaign
Sources:
(1) Refer ASX announcement 3 September 2025
Future Priority Drilling designed & permitted(1) → MRE Uplift
Extending on-trend in NNE direction to link up with
mineralized zones outside of the MRE and small mine
workings around Brincia and Emilia:
Stepping out laterally from the existing MRE around the San
Jose Mine
Step Out drilling on trend
• Targeting host Reocin Formation and in vicinity of
historical workings,
• Known positive historical drilling results and geochemical
results recorded.
• Strong structural controls assist with target vectoring
1
2 San Jose Infill drilling
• Significant historical drilling supports targets
• Targets located +50m from data in the MRE ore domains
• Shallow targets 100-200m from surface
ASX:VAR
22
• San Jose Mine links to much larger historical Udías zinc mine complex that closed
in 1930s
• Interlinked underground mining operation with much of the tenement covered by
San Jose mining licence
• > 3.5 km of linear length, within permit area but outside of existing Mineral
Resource Estimate
Udías Mine
Untapped upside atinterlinked deposit
Sources:
(1) Refer ASX announcements 19 December 2024, 2 June 2025
ASX:VAR
23
Udías Mine
Excellentmaiden underground drillingresults
Sources:
(1) Refer ASX announcement 23 February 2025, 01 June 2025, 11 November 2025
• Drilling been supported by 3D survey → higher impact drilling,
mineralisation modelling and Mineral Resource Estimate update
• Confirms extensive under-explored mine development and
identifying extensions of high-grade mineralisation
• Udías and San Jose Mines; both are on the same mineral system
• Survey maps mine development of +7,500m over 6 levels
Drilling to continue along mine development to link up with existing
Mineral Resource Estimate and beyond to San Jose Mine
Top 20 best-ever intercepts drilled by Variscan at the
Udías Mine in 2025
ASX Date Drillhole ID Length (m) Zn (%) m x Zn
23-Feb-25 UDDT004 20.1 8.22 165.2
11-Nov-25 UDDT024 6.43 20.76 133.5
23-Feb-25 UDDT002 16.5 6.16 101.6
11-Nov-25 UDDT030 7.4 11.22 83.0
01-Jun-25 UDDT016 8 9.6 76.8
11-Nov-25 UDDT022 7.65 8.59 65.7
11-Nov-25 UDDT024 4.65 13.52 62.9
23-Feb-25 UDDT001 7.8 7.41 57.8
01-Jun-25 UDDT016 10 5.58 55.8
11-Nov-25 UDDT033 7 7.83 54.8
23-Feb-25 UDDT005 11.4 4.76 54.3
23-Feb-25 UDDT003 11 4.92 54.1
11-Nov-25 UDDT021 6.25 7.58 47.4
11-Nov-25 UDDT019B 6.7 6.05 40.5
11-Nov-25 UDDT034 5.15 5.38 27.7
01-Jun-25 UDDT009 7.1 3.85 27.3
01-Jun-25 UDDT010 5.4 5.06 27.3
11-Nov-25 UDDT035 3.9 6.44 25.1
01-Jun-25 UDDT017 4 4.93 19.7
ASX:VAR
24
Drilling-led Exploration
Highlysuccessfuldrillingindicatesscope to grow…
Underground access → efficient & cost-
effective drilling
Sources:
(1) Refer ASX announcement 24 February 2025 & 4 March 2025
(2) Opaxe global database of +3,000 best zinc intercepts since 2014
Results in 2025 include 5 of the best-ever 20 drill holes
VAR has ever drilled in San Jose and Udías Mines
Drilling success evidences quality of deposits across
the Novales-Udías project on global basis
VAR owned & operated portable rig allows flexibility
No costs associated with contracted drilling
(mobilization , downtime etc.)
ASX:VAR
Exploration Upside for Future Growth
Significantlyexpanded tenements (111 km2) →Zinc DistrictScaleOpportunity
25
• Hipolita Licence granted over extensions of Reocín Mine;
produced ~62 Mt of ore grading 8.7% Zn and 1.0% Pb.
• The Reocín deposit is one of the largest known strata-
bound, carbonate-hosted, zinc-lead deposits in Europe.
• In 2003, at mine closure, average production grades were
8.5% Zn and 0.9%Pb with Reserves of 2.5Mt remaining(2)
Sources:
(1) Refer ASX announcement 14 April 2025
(2) Velasco, F., Herrero, J.M., Yusta, I., Alonso, J.A., Seebold, I. and Leach, D., (2003) ‘Geology and Geochemistry of the
Reocin Zinc-Lead Deposit, Basque-Cantabrian Basin, Northern Spain’ Econ. Geol. v.98, pp. 1371-1396.
Significant historical drilling activity over the licences →
MRE upside / de-risked exploration
Substantially reassembled Asturiana de Zinc (Xstrata)
land & licence package
ASX:VAR
Exploration Upside for Future Growth
Acquisition of 146 historic drillholes for52,034metres→multiplehigh-grade
Zn & Pb interceptsacrossnewly granted licences.
26
Sources:
(1) Refer ASX announcement 16 September 2025
90 drillholes over possible unmined extensions of mineralization and
wider exploration opportunity around the Reocín Mine.
Drillholes are outside the current MRE supporting a larger, longer-term,
de-risked Zinc district scale exploration and development opportunity
ASX:VAR
Government of Cantabria fully support the
Company’s plans to recommence mining.
A dedicated working group has been
established by the Minister to streamline
coordination across departments
Existing approvals, community support and
minimal environmental impact from
brownfield operation de-risk execution
Regulatory reforms are underway to fast
track milestones with government
committed to mining as a regional
economic driver
Variscan MD & CEO meeting with President of the Government of Cantabria, Ms María
José Sainz de Buruaga and Regional Minister for Industry, Employment, Innovation and
Trade, Mr. Eduardo Arasti Barca.
27
The Government of
Cantabria will do
"everything possible"
to re-start zinc mining
Near-term Producer Enablers
FullGovernmentSupportand ExcellentSocialLicence
Sources:
(1) Refer ASX announcement 11 March 2025
ASX:VAR
28
Near-term Producer Enablers
Strong Backing with EquityAlignmentand OfftakePotential
Sales & Marketing
• Square Trading appointed exclusive marketing manager for worldwide sale of zinc
concentrates (1).
• Considerable global marketing and trading experience
• Appointment includes assistance with securing third party financing
• Equity alignment as significant shareholder via Zinc GroupCo ( 23% of VAR ownership)
Property & Logistics • Lease agreement over San Jose Mine Site and facilities (31,199m2) (2)
• Site already permitted for mineral exploration, development & mining activities
• Local partner providing civil engineering and logistics
• Interests aligned with VAR shareholding
Strategic Shareholders
• Strategic shareholder support with significant mining sector expertise
• Long-term holders with credibility and funding capability
• Top 20 account for 75% of VAR ownership
• Directors hold 8% of VAR ownership
Sources:
(1) Refer ASX announcement 13 August 2024
(2) Refer ASX announcement 29 January 2024
(3) Shareholding data as at 02 July 2025
ASX:VAR
29
Proposed Acquisition: BMex Exploration
LowriskEarn-In toprospective Zinc opportunities
Midlands Project
.
Waterford Project
.
Mines / zinc Deposits
BMEx Projects
Abbeytown
Ballinalack
Keel
Harbarton Bridge
Kildare
Navan
Kingscourt
DUBLIN
I R E L A N D
Tynagh
Galmoy
Lisheen
Gortdrum
Rathkeale
Fermoy
Pallas
Green
Silvermines
MIDLANDS
WATERFORD
Sources:
(1) Refer https://www.bmexploration.com.au
• Located in the Irish Midland Zinc Belt, County of Longford, consists
of two licences over 58 km2 in aggregate.
• The licences are valid to October 2029.
• Located in the County of Waterford and comprises six prospecting
licences of 163 km2 in aggregate.
• Licences are valid to November 2028.
Proposed Acquisition: BMex Exploration
Transaction Rationale &ConditionsPrecedent
2
ASX:VAR
30
1
2
3
Variscan shareholders approving the Proposed Transaction
pursuant to Listing Rule 10.1
Completion of legal and technical due diligence by VAR to its
sole and absolute satisfaction
Variscan raising sufficient funds in order to satisfy the Stage 1
Earn-In expenditure
ZincCo subscribing for $250,000 worth of New Shares at the
Placement price (such subscription being subject to
shareholder approval of the Placement and the Earn-In)
Execution of all definitive documentation required to
complete the Earn-In.
4
5
Deepen our zinc focus which is complementary to existing
asset base
Expand our business, leveraging our competency of
exploring and developing carbonate-hosted lead–
zinc deposits in Europe
Leverage the technical expertise and corporate
development capabilities of Mine Discovery Fund with
Varsican being granted the first right of refusal on zinc
projects generated by MDF
Create a stronger asset portfolio to attract capital for
exploration and development
Conduct additional exploration activity in Ireland to
supplement the development workplan for the zinc assets
in Spain
Provide some diversification of location yet retain a
European geograph
Share your feedback
Discover