Key Highlights
Drilling identifies thick zinc mineralisation outside of San Jose Mine’s current Mineral Resource
•
•
•
•
More strong assay results were received from Variscan Mines’ latest underground infill and
extensional drilling campaign at the San Jose Mine (refer ASX Announcement 11 July 2024)
Significant drilling results included:
o NDDT033:
14.10m @ 5.31% Zn, 0.44% Pb
o NDDT032:
11.00m @ 6.66% Zn, 0.72% Pb
o NDDT034:
4.65m @ 5.49% Zn, 0.14% Pb
o NDDT035:
4.00m @ 5.92% Zn, 0.26% Pb
These results indicate significant mineralization intersected outside the existing Mineral
Resource Estimate model delivering growth potential
All new drilling results are to be incorporated into Mineral Resource Estimate update, which is
expected to issue in the second half of calendar 2024.
Historic high-grade zinc-lead assays outside of Mineral Resource Model at Udias Mine
•
•
Newly compiled, assays from historic underground face-sampling at the Udias Mine show very
high-grade zinc-lead results, confirming mineralization outside of the current Mineral Resource
Estimate footprint (refer ASX Announcement 10 September 2024)
The high-grade sample results taken along development drives and faces include:
o Sample UTS-15:
4.50m @ 26.47% Zn, 19.46% Pb
o Sample UTB-65:
2.80m @ 35.87% Zn, 0.17% Pb
o Sample UTB-11:
4.00m @ 21.50% Zn, 0.32% Pb
o Sample B-20:
3.00m @ 28.20% Zn, 5.90% Pb
o Sample UTB-32:
2.00m @ 36.95% Zn, 0.41% Pb
o Sample UTB-132:
2.00m @ 35.39% Zn, 0.07 % Pb
o Sample UTB-86:
4.00m @ 16.39% Zn, 2.18% Pb
o Sample D-5:
1.55m @ 41.00% Zn, 0.22% Pb
Total batch of 337 samples compiled over distance of 2.2km
Samples have supported definition of high-priority targets for the forthcoming underground
drilling at Udias Mine
•
•
Interim funding and follow-on Direct Placement
•
•
•
•
•
Completion of interim funding initiative, raising $294,000 through the issue of 49,000,000 new
ordinary shares at $0.006 per share
The placement was supported by Variscan Mines’ largest shareholder, Zinc GroupCo, and also
attracted new sophisticated investors
Directors provide an additional $132,000 of unsecured working capital loans, convertible into
new shares, subject to shareholder approval
A subsequent Placement of 15,000,000 new ordinary shares to Zinc GroupCo, the Company’s
major shareholder, priced at $0.006 per share.
Zinc GroupCo now holds a 22.57% stake in Variscan Mines
Fully underwritten renounceable Entitlement Offer
•
•
•
A fully-underwritten renounceable entitlement offer (the Offer) was announced on 26
September 2024.
As announced on 30 October 2024, applications were received for 130,447,227 shares raising
$913,130, with the remaining 164,885,821 shares to be allocated as shortfall under the terms
of the offer.
Total raised under the offer was $2.067 million before costs.
Marketing agreement for sale of future zinc and lead production
•
•
•
Variscan has appointed Square Trading as its exclusive marketing manager for the worldwide
sale of zinc concentrates from its Novales-Udias and Guajaraz Projects in Spain
Square Trading will also assist Variscan to secure third party financing to construct and operate
the mines being developed by Variscan
Square brings considerable global marketing and trading experience, and capacity
Future critical Novales-Udias Project milestones expected
•
•
•
Underground drilling at the Udias Mine
Updated Mineral Resource Estimate
Publication of a Mine Re-Start Study
2
Variscan Mines Limited (ASX:VAR) (“Variscan” or “the Company”) is pleased to announce its Appendix 5B
for the quarter ended 30 September 2024 (“Q1 FY25”) and an accompanying operational update for this
period.
Variscan’s Managing Director & CEO, Stewart Dickson said,
”The exploration and development plan for our enlarged Novales-Udias Zinc-Lead Project in northern Spain
was further progressed in the September 2024 quarter.
“We have delivered another set of pleasing results from our latest underground drilling campaign at the San
Jose Mine. These results revealed excellent intercepts and grades outside our existing Mineral Resource
Estimate model. We also released historic high-grade zinc-lead sampling results from the Udias Mine complex
which is linked to the San Jose Mine. They provided an exciting preview to our first-ever drill-testing of
identified targets within this former producing mine.
“We were excited to announce a marketing agreement with well-established and leading natural resources
marketing and trading house, Square Resources. This is an important relationship for the future sale of zinc
and lead concentrates we expect to produce.
“In a pleasing endorsement of our high-quality zinc projects in Spain, the September 2024 quarter also saw
Variscan raise additional capital, which will fund the delivery of further Novales-Udias development plan
milestones. These equity raisings saw both continued strong support from Zinc GroupCo, as well as the entry
onto our share register of new sophisticated and professional investors.
“Looking to the near term, we anticipate additional positive news flow from our Novales-Udias activities over
the final part of calendar 2024, with the Company on track to issue both an updated Mineral Resource
Estimate and the much anticipated-Mine Re-Start Study by the end of this period.”
3
OPERATIONS REVIEW
Variscan’s exploration and development strategy for the Novales-Udias Project continued to be advanced
over the September 2024 quarter. This period saw further exploration activities across this now enlarged
Project, new equity raised and a marketing agreement.
Spain – Novales-Udias Zinc Project
The Novales-Udias Project is located in the Basque-Cantabrian Basin, some 30km southwest from the
regional capital, Santander.
Since its acquisition, the Project has been centred around the former producing San Jose underground mine
with a large surrounding area of exploration opportunities over the 9km Novales Trend, which includes a
number of satellite underground and surface workings.
In April 2024, the Novales-Udias Project was materially upsized after the addition of five new licence areas
(see ASX announced dated 8 April 2024). These new licences comprised a large area of 34.4km2 contiguous
to the existing tenaments. The newly acquired licences extended the Novales-Udias Trend of zinc
mineralization to approximately 12km in length. This enlarged licence package includes the former
producing, San Jose and Udias Mines (including access to the Pozo Madrano shaft), as well as numerous
historical small-scale mines and workings.
The project, continued to be the major focus of Variscan’s exploration and development activities over the
three months to 30 September 2024.
Results from current drilling campaign expands mineralization beyond existing MRE model
In very early Q1 FY25, the Company followed through on its stated plans to upscale the duration and
meterage of its underground drilling program at the San Jose Mine (see ASX announcement dated 11 July
2024).
This now-extended drilling campaign is focused on expanding known zones of mineralization and discovering
new zones with a view to supporting an upgraded Mineral Resource Estimate (“MRE”). The campaign had
the following objectives to support the eventual restart of production at the San Jose Mine:
•
•
•
Drill-test structures within and beyond the defined MRE area, which have to date seen limited
exploration drilling
Discover new zones of mineralization to increase overall size of current MRE tonnage
Increase the confidence level of the orebody.
The drilling results reported have targeted zinc-lead structures identified from geological assessment and the
structural targeting study (refer ASX announcement dated 19 February 2024), which has resulted in a muchimproved understanding of the controls on multi-phase zinc-lead mineralization at the San Jose Mine.
4
Further, these areas were previously under-explored or under-exploited. The high-grade intercepts reported
hit the cross-cutting D2 structure linking Stope 200 and the La Caseta Trend. This target area lies outside of
the existing MRE model.
Figure 1. Plan view of new drill-hole data over the Central Zone, San Jose Mine
The newly identified mineralization arising from these positive drill results is outside the existing MRE and
shows the potential to increase the mineral resource. The drilling results demonstrate significant potential
for resource extensions both above and below the main gallery level.
Key assay results from this drilling program included:
o
o
o
o
o
NDDT027: 14.5m @ 8.93% Zn, 0.50% Pb
NDDT029: 11.6m @ 8.43% Zn, 1.61% Pb
NDDT026: 7.0m @ 5.30% Zn, 0.04% Pb
NDDT028: 6.0m @ 6.59% Zn, 0.62% Pb
NDDT020: 3.0m @ 5.55% Zn, 0.41% Pb
5
Historic high-grade zinc-lead assays at old Udias Mine, outside of mineral resource model
In mid-September 2024, Variscan released assay results compiled from historic data recording face
sampling at the former producing Udias Mine, situated within the enlarged Novales-Udias Project (see ASX
announcement dated 10 September 2024). The Udias Mine complex is directly linked underground to the
San Jose Mine near Novales, and both mines sit on the 12km-long Novales Trend.
Figure 2. Plan view of underground face sampling results in the Udias Mine
6
The results, which were compiled from 337 samples, point to significant upside in the broader NovalesUdias Project. The samples look to have been taken in the early 1980s, some 50 years after all mining
operations had ceased at the Udias Mine.
Sulfide zinc-lead mineralization was never mined at Udias because of the lack of suitable ore processing
technology pre-1930 and has been proven to continue along strike for over 2.2km. The majority of the old
Udias Mine sits outside of the current MRE and has not yet been drilled by Variscan. The southern part of
the Udias Mine, exceeding 1.4km in length, has never been drilled at all.
The result of this thorough review of archive data, together with historical drilling results (refer ASX
announcement dated 7 August 2023), was the delineation of several high-priority targets for the imminent
round of drill testing.
Spain – Guajaraz Zinc Project
The Guajaraz Project is a prospective brown-field zinc-rich polymetallic opportunity with known mineral
occurrences. The Project is located in the highly mineralised Central Zone of the Iberian Massif, which ranks
as one of the most mineralised geological units globally and represents the internal zone of the prolific
European Variscan Orogenic belt.
The Project area lies within a primary igneous and metamorphic crystalline plateau that hosts abundant
hydrothermal vein networks that have a long history of exploration. Brittle-fault related vein and silicified
breccia ore deposits are of the BPGC type (zinc-galena-pyrite-chalcopyrite).
While the main focus over the September 2024 quarter was again the exploration and eventual development
of the Novales-Udias project, Guajaraz remains a core asset in Variscan’s portfolio.
In late October 2023, Variscan announced that the Consejería de Desarrollo Sostenible (Department of
Sustainable Development) of the Junta de Comunidades de CastillaLa Mancha (the regional Government of
Castile-La Mancha) had approved a 3-year extension of the “Guajaraz” Permiso de Investigación (Exploration
License), located in central Spain (see ASX announcement dated 26 October 2023).
The design of the future long-term work program for the Guajaraz Project includes:
•
•
•
soil geochemistry
geophysical survey
initial drilling campaign.
7
PROJECT SUMMARIES
Spain – Zinc-rich Novales-Udias Project
The Novales-Udias Project is located in the Basque-Cantabrian Basin, some 30kms southwest from the
regional capital, Santander. The project is centred around the former producing San Jose underground mine
with a large surrounding area of exploration opportunities for a number of satellite deposits based on
underground and surface workings, our substantial database of historic drilling and multiple areas of zinc
anomalism identified from recent and historic geochemical surveys. Variscan has upsized the NE-SW Novales
Trend over 12kms with a sub-parallel mineralised trend over at least 3kms of strike.
Key highlights of the Novales-Udias Project:
•
•
•
•
•
•
•
•
•
•
•
•
Near term zinc production opportunity
Large tenement holding of +100 km2 (including several granted mining tenements)
Maiden JORC compliant Mineral Resource Estimate of 1.08Mt at 10%Zn established in Q4 2023
(Table 1)
Regional exploration potential for another discovery analogous to Reocin (total past production
and remaining resource 62Mt @ 8.7% Zn and 1.0% Pb 1 2)
San Jose Mine is within trucking distance of Glencore zinc smelter in neighboring region of Asturias
Classic MVT carbonate hosted Zn-Pb deposits
Historic production of high-grade zinc; average grade reported as around 7% Zn 3
Simple mineralogy of sphalerite – galena – calamine
Ore is strata-bound, epigenetic, lenticular and sub-horizontal
Reported historic production of super high grade ‘bolsas’ (ore bags) commonly 10-20% Zn and in
some instances +30% Zn 4
Assay results of targeted grab samples taken from within the underground Novales Mine recorded
31.83% Zn and 62.3% Pb 5
Access and infrastructure all in place
Local community and government support due to historic mining activity.
Velasco, F., Herrero, J.M., Yusta, I., Alonso, J.A., Seebold, I. and Leach, D., 2003 - Geology and Geochemistry of the
Reocin Zinc-Lead Deposit, BasqueCantabrian Basin, Northern Spain: in Econ. Geol. v.98, pp. 1371-1396.
2
3 Cautionary Statement: references in this announcement to the publicly quoted resource tonnes and grade of the
Project are historical and foreign in nature and not reported in accordance with the JORC Code 2012, or the categories
of mineralisation as defined in the JORC Code 2012. A competent person has not completed sufficient work to classify
the resource estimate as mineral resources or ore reserves in accordance with the JORC Code 2012. It is uncertain that
following evaluation and/or further exploration work that the foreign/historic resource estimates of mineralisation
will be able to be reported as mineral resources or ore reserves in accordance with the JORC Code 2012.
3
Anecdotal evidence from original Novales miners interviewed during the WAI Due Diligence supported with historical
production data from the School of Mines in Torrelavega historical archives.
4
Anecdotal evidence from original Novales miners interviewed during the WAI Due Diligence supported with historical
production data from the School of Mines in Torrelavega historical archives.
5
Refer to ASX Announcement of 19 December 2019.
1
8
Table 1. JORC Mineral Resource Estimate for San Jose Mine and north-eastern Udías by deposit and
classification reported above a 2% Zn cut-off (refer ASX announcement 28 November 2023)
Spain – Guajaraz Zinc-rich Polymetallic Project
The Guajaraz Project is a prospective brown-field zinc-rich polymetallic opportunity with known mineral
occurrences. The project is located in the highly mineralised Central Zone of the Iberian Massif, which ranks
as one of the most mineralised geological units globally and represents the internal zone of the prolific
European Variscan Orogenic belt. Variscan believes Guajaraz represents an excellent, de-risked brownfield
polymetallic project. Reflective of this belief in the prospectivity of this Project, the Company filed an
application with the authorities in Castilla-La Mancha during the year for a 3-year extension of the current
exploration licence over the Guajaraz tenement area. This 3-year extension, covering the period 2023
through 2026 was granted to Variscan Mines’ local Spanish subsidiary, Variscan La Mancha in late October
2023.
FINANCIAL & CORPORATE
New capital to fund ongoing Novales-Udias Project exploration/development activities
Variscan successfully completed three separate equity raises over Q1 FY25. As a package, these new funds
provide funding for the development plan for the enlarged Novales-Udias Project and bolster corporate and
operational working capital.
9
Specific development plan initiatives include:
•
•
•
•
•
Underground drilling program at the Udias Mine
Exploration drilling over the newly enlarged Novales-Udias Project
The generation of additional data for a Mineral Resource Estimate upgrade
Additional input data and studies for the intended Mine Re-Start Study
The review of additional complimentary prospects and corporate development opportunities.
Early in Q1 FY25, the Company completed interim funding through the placement of 49,000,000 shares at
$0.006 per share to sophisticated and professional investors (see ASX announcement dated 22 July 2024).
This Placement raised $294,000 and included an attaching unlisted option to be issued, subject to
shareholder approval, on the basis of 1 option for every 2 shares taken up in the Placement. The unlisted
options will be exercisable by payment of $0.01 each on or before the date two years from the date of issue.
The Placement shares were issued pursuant to the Company’s capacity under Listing Rule 7.1 and 7.1A.
In addition, working capital Loans totalling $132,000 were provided by directors (see ASX announcements
dated 22 July 2024 and 20 September 2024).
Interim Funding Extension completed
In mid Q1 FY25, Variscan completed an extension to the above-mentioned interim funding raise (see ASX
announcement dated 23 August 2024). This extension involved the placement of an additional 15,000,000
shares to Zinc GroupCo Pty at $0.006 per share (the same price as the initial interim funding placement).
This follow up placement to Zinc GroupCo Pty, raised an additional $90,000, and was made pursuant to the
Company’s capacity under Listing Rule 7.1.
This brought the total amount raised from the interim funding to $384,000, comprising 64,000,000 shares,
priced at $0.006 per share.
Renounceable entitlement offer
Late in Variscan’s Q1 FY25, the Company announced an underwritten 2-for-3 renounceable entitlement offer
(“the Offer”) to Eligible Shareholders that will raise approximately A$2.067m (before costs) (see ASX
announcement dated 26 September 2024). These new shares have an offer price of 0.7 cents per share.
Eligible Shareholders participating in the Offer will also receive one (1) free attaching New Option for every
four (4) new shares subscribed for and issued under the Offer. The New Options will be unlisted, exercisable
at 1.5 cents per share and will have an expiry date of two years from the date of issue.
The Offer was fully underwritten by Whairo Capital Pty Ltd who was appointed as Lead Manager and
Underwriter.
Following completion the Offer Variscan will issue approximately 295.3 million new shares in the Company,
resulting in a total of approximately 738.3 million fully paid ordinary shares on issue.
10
Marketing agreement for sale of future zinc and lead production
Midway through Variscan’s Q1 FY25, the Company announced that it had entered into an exclusive Marketing
Agreement (“Marketing Agreement”) with Square Trading Singapore Pte Ltd (“Square Trading”) for the
future sale of zinc and lead concentrates from the Novales-Udias and Guajaraz Projects (see ASX
announcement dated 13 August 2024).
The key terms of the Marketing Agreement are:
•
•
•
•
Exclusive marketing rights to all zinc concentrate from the Novales-Udias and Guajaraz Projects in
Spain. The term will end five (5) years from the date of the first invoice issued to a customer relating
to a delivery of said concentrates. Variscan may extend the end date for a further period of not less
than one year by written notice to Square Trading
The parties will negotiate and agree to a competitive, commercial marketing fee, immediately
following the Company announcing the results of the Mine Re-Start Study
Square Trading’s services will include developing and updating marketing strategies; preparing and
providing short- and long-term marketing plans; introducing Variscan to customers; liaising with
customers in respect of sales contracts; assisting in preparing technical and commercial
presentations to customers in respect of the concentrates
Square Trading will use their reasonable endeavours to assist with procuring financing for Variscan
to construct and operate the Projects so as to enable the delivery of concentrates from the Company
to customers.
Rosario project in Chile relinquished
The success of the exploration and development work on Variscan’s Spanish assets has merited capital
allocation and resources being focused on those projects. Our focus is rightly on our key objective of working
towards re-starting production at the Novales-Udias Project. Consequently, Variscan’s Board of Directors
have decided to relinquish the Company’s limited interest in the Rosario Project in Chile. All expenditure has
ceased in Chile and the local company is being wound up.
CASH
Cash at bank at the end of the quarter was $223,000. As announced on 30 October 2024, the Group’s fullyunderwritten renounceable entitlement issue has closed, raising an additional $2,067,335 (before costs).
11
SUMMARY OF EXPENDITURE ON EXPLORATION ACTIVITIES
For the quarter, the Group spent $234,000 on exploration activities, substantively all of which related to the
Group’s Spanish zinc projects. These exploration activities related to:
•
•
•
•
•
Underground drilling;
Geological mapping and modelling;
Technical consulting fees;
Tenement administration, reporting and management; and
Directly-attributable corporate overheads and administration costs.
In accordance with ASX Listing Rule 5.3.2, the Company advises that no Mining Development or Production
activities were conducted during the quarter.
DEFERRED SETTLEMENT SHARES
In accordance with the acquisition of the Spanish Zinc projects, the Company must issue additional shares
upon the satisfaction of certain exploration milestones. These milestones are for the definition, in accordance
with JORC 2012, of an Inferred Mineral Resource (or greater) of:
•
•
•
Milestone 1: 4 million tonnes at 7% Zn
Milestone 2: 8 million tonnes at 7% Zn
Upon satisfaction of each of these milestones, the Company must issue 27,500,000 ordinary shares
to the vendors of Slipstream Spain Pty Ltd and Slipstream Spain 2 Pty Ltd, and 2,426,471 shares to
Hispanibal S.L. as the vendor of the “Hispanibal Option”, for a total of 59,852,941 Ordinary Shares if
both milestones are met.
There is currently no obligation to issue the milestone shares.
OTHER
During the quarter, the Company made payments to related parties of $23,000, represented by
remuneration paid to Directors.
ENDS
This ASX announcement has been authorised by the Variscan Mines Limited
For further information, please contact:
Variscan Mines Limited (ASX:VAR)
Stewart Dickson
Managing Director & CEO
E: stewart.dickson@variscan.com.au
T: +44 (0) 7799 694195
Media & Investor Enquiries
The Capital Network
Julia Maguire
E: julia@thecapitalnetwork.com.au
P: +61 2 7257 7338
12
About Variscan Mines Limited (ASX:VAR)
Variscan Mines Limited (ASX:VAR) is a growth oriented, natural resources company focused on the acquisition,
exploration and development of high-quality strategic mineral projects. The Company has compiled a portfolio of highimpact base-metal interests in Spain, Chile and Australia. Its primary focus is the development of its advanced zinc
projects in Spain. The Company’s name is derived from the Variscan orogeny, which was a geologic mountain building
event caused by Late Paleozoic continental collision between Euramerica (Laurussia) and Gondwana to form the
supercontinent of Pangea.
To learn more, please visit: www.variscan.com.au
For more information
Follow us on LinkedIn
Follow us on X (formerly Twitter)
Visit our investor website: www.variscan.com.au
COMPETENT PERSONS STATEMENTS
Exploration
The information in this report that relates to Exploration Results is based on and fairly represents information compiled
by Dr. Michael Mlynarczyk. Dr Mlynarczyk is a Principal consultant for Redstone Exploration Services, a geological
consultancy acting as an external consultant to Variscan Mines and is a Professional Geologist (PGeo) of the Institute of
Geologists in Ireland, and European Geologist (EurGeol) of the European Federation of Geologists, as well as a Fellow of
the Society of Economic Geologists (SEG). Mr Mlynarczyk has sufficient experience relevant to the style of mineralisation
and type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person
as defined in the 2012 Edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources and
Ore Reserves (JORC Code). Dr. Mlynarczyk consents to the disclosure of the information in this report in the form and
context in which it appears.
Mineral Resource Estimate
The information in this report that relates to Mineral Resources is based on, and fairly reflects, information compiled by
Dr. Michael Mlynarczyk. Dr. Michael Mlynarczyk is a Principal consultant for Redstone Exploration Services, a geological
consultancy acting as an external consultant to Variscan Mines and is a Professional Geologist (PGeo) of the Institute of
Geologists of Ireland, and European Geologist (EurGeol) of the European Federation of Geologists, as well as Fellow of
the Society of Economic Geologists (SEG). Dr. Michael Mlynarczyk has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as
Competent Persons as defined in the 2012 Edition of the Australasian Code for the Reporting of Exploration Results,
Mineral Resources and Ore Reserves (JORC Code). Dr. Michael Mlynarczyk consent to the disclosure of the information
in this report in the form and context in which it appears.
Where reference is made to previous releases of exploration results and mineral resource estimates in this
announcement, the Company confirms that it is not aware of any new information or data that materially affects the
information included in those announcements and all material assumptions and technical parameters underpinning the
exploration results and mineral resource estimates included in those announcements continue to apply and have not
materially changed.
Reference is made to the following ASX announcements: 29 January 2024; 19 February 2024; 4 March 2024; 8 April
2024.
13
LISTING OF TENEMENTS HELD AT 30 SEPTEMBER 2024
Tenement
SPAIN – Note 5
Tenement No.
Interest
Joint Venture Details
Cantabria
Buenahora Fraction 1
IP 16.662-01
100%
Buenahora Fraction 2
IP 16.662-02
100%
San José
EC 94
100%
La Torra
EC 512
100%
Tres Amigos
EC 1565
100%
Torpeza
EC 2557
100%
Andrea
EC5220
100%
Andrea-demasía a
EC5374
100%
Es
EC8049
100%
Dudosa
EC8165
100%
Cargadoiro
EC11589
100%
Tres amigos-demasía a
EC11594
100%
Flor del pueblo
EC12942
100%
Torpeza-demasía a
EC12952
100%
Torpeza-3ª demasía a
EC13079
100%
Torpeza-2ª demasía a
EC13080
100%
Flor del pueblo-demasía a
EC13154
100%
Dudosa-demasía a
EC13170
100%
Andrea-3ª demasía a
EC13175
100%
Andrea-2ª demasía a
EC13176
100%
Cargadoiro-demasía a
EC13260
100%
Ampliación a Matilde
EC13641
100%
Aumentada
EC14238
100%
Campitos
EC14554
100%
Campitos-demasía a
EC14640
100%
Carmenchu
EC14945
100%
Amelita
EC14949
100%
Eloísa
EC14947
100%
Ampliación a Matilde-demasía a
EC14948
100%
Cargadoiro 2
EC14954
100%
Amelita-demasía a
EC14979
100%
Carmenchu-demasía a
EC14980
100%
Eloísa-demasía a
EC14981
100%
Carmenchu-2ª demasía a
EC14982
100%
6º Aumento a porvenir
EC15672
100%
Ampliación a Matilde-demasía a
EC13641-10
100%
Campitos-segunda demasía a
EC14554-20
100%
Cargadoiro 2- demasía a
EC14954-10
100%
Carmenchu-tercera demasía a
EC14980-30
100%
14
Tenement
6º Aumento a porvenir-demasía a
Tenement No.
EC15672-10
Interest
100%
Joint Venture Details
Torpeza-tercera demasía a
EC2557-30
100%
Esperanza
IP 16674
100%
Estela
IP 16672
100%
Elena
IP 16673
100%
Candela
IP 16676
100%
Valeria
IP 16675
100%
IP 4.203
100%
Willyama
EL 8075
0%
Hillston
EL 6363
39.2%
Native Dog
EL 8236
0%
Note 1
Woodlawn South
ELs 7257 and 7469
0%
Royalty interest only
Junction Dam
EL 5682
0%
Marmota acquired 100% ownership.
See Note 2
Callabonna
EL 5360
49%
Red Metal 51%, can earn 70%
St Pierre
PER
100%
Beaulieu
PER
100%
Toledo
Guajaraz
NEW SOUTH WALES
Note 1
Perilya can earn 80%, Eaglehawk 9.8%
SOUTH AUSTRALIA
FRANCE
EL
= Exploration License
PER
= Permis Exclusif de Recherche (France)
IP
= Investigation Permit (Spain)
EC
= Exploration Concession (Spain)
Note 1:
Under an agreement with Silver City Minerals Limited, Broken Hill Operations and Eaglehawk Geological
Consulting Pty Ltd Variscan has converted its interest in parts of these tenements to a NSR (Net Smelter
Return).
Note 2:
Marmota has earned 100% of the uranium rights only in EL 5682. Variscan has a 0.5% net profits royalty
on production from a uranium mine.
Note 3:
The remaining exploration licenses owned by Variscan Mines SAS (excluding the Couflens PER) have
been conditionally acquired by a new wholly owned subsidiary, Variscan Mines Europe Limited.
Pursuant to the approval for the Subsidiary Sale, the Ministry of Economy and Finance has imposed,
without prior consultation, the compulsory relinquishment of the remaining licenses. The Company has
approved the r
Share your feedback
Discover