Further High-Grade Zinc Drill Results at San Jose Mine
Released
Released
Announcement PDF
ASX Announcement | 4 March 2024
Variscan Mines Limited (ASX:VAR)
FURTHER HIGH-GRADE ZINC DRILL RESULTS AT SAN JOSE MINE
Highlights
•
•
•
•
•
•
High grade zinc assay results from current underground drilling campaign
Selected drilling results:
o NDDT027 14.5 m @ 8.93% Zn, 0.50% Pb
o NDDT029 11.6 m @ 8.43% Zn, 1.61% Pb
o NDDT026 7.0 m @ 5.30% Zn, 0.04% Pb
o NDDT028 6.0 m @ 6.59% Zn, 0.62% Pb
o NDDT020 3.0 m @ 5.55% Zn, 0.41% Pb
Existing Mineral Resource Estimate model is well supported by these infill drill intercepts
New results confirm the potential for additional lenses below the existing model and further
extensions
Current drilling is testing new structural targets defined from recently completed structural
geology study, and which are outside the existing Mineral Resource Estimate model
Upscaled drilling will continue until mid 2024 calendar year, and is designed to:
o upgrade existing Indicated and Inferred resources
o discover new zones of mineralization to increase overall size of current mineral
resource tonnage
Variscan Mines Limited (ASX:VAR) (“Variscan” or “the Company”) is pleased to report further high-grade
zinc intercepts from the ongoing underground diamond drilling program at the San Jose Mine, near Novales,
located in Cantabria, northern Spain.
The underground drilling program at the San Jose Mine has been upscaled in duration and meterage. It is
focused on expanding known zones of mineralization and discovering new zones with a view to supporting
an upgraded Mineral Resource Estimate in the future. Ongoing drilling is testing:
1. prospective zones that have been identified from the development of our 3D modelling;
2. structures within and beyond the defined Mineral Resource Estimate (“MRE”) area which have seen
limited exploration drilling; and
3. above or below previously-mined stopes where historical production had ceased
Drilling supports existing structural interpretation and Mineral Resource Estimate model in the
Central Zone of the San Jose Mine
The drilling results reported here have targeted areas of known Zn-Pb structures that were previously
underexplored or underexploited. The high-grade intercepts are mainly associated with the La Caseta Trend
within the Central Zone of the San Jose Mine.
Figure 1. Plan view of new drill-hole data over the Central Zone, San Jose Mine
2
Figure 2. Plan view of new, planned and recently completed drill-hole locations in relation to the Mineral
Resource Estimate over the Central Zone, San Jose Mine
3
Figure 3. Diamond Drill Core from NDDT029 illustrating interval of massive sphalerite hosted in dolostone
Note: Hole depth shown is from 0m to 12.5m
Current drilling is testing new structural targets in the San Jose Mine
The recently released geological assessment and structural targeting study (refer ASX announcement 19
February 2024) resulted in a significantly improved understanding of the controls on multi-phase Zn-Pb
mineralization at the San Jose Mine.
The new assay results from the La Caseta trend were obtained from the intercept of a prominent D2
structure. Newly identified targets within the San Jose Mine arising from the study are being drill-tested as
part of the ongoing underground drilling campaign. In particular the cross-cutting D2 structure linking Stope
200 and the La Caseta trend is being drilled currently (refer Figures 4 and 5). This target area lies outside of
the existing MRE model.
4
Figure 4. Plan view of drill-hole locations in relation to the structural trends over the Central Zone, San Jose
Mine
5
Figure 5. 3D view of drill-hole locations testing D2 structural targets between Stope 200 and the La Caseta
Trend in the San Jose Mine
Summary of key findings
•
•
•
Assay results released herein are from drill holes targeting structurally controlled zones of
mineralization within the San Jose Mine
Drilling has continued to return thick intercepts of significant zinc mineralization and consequently
expand and infill zones of high-grade zinc mineralization within the Central Zone of the San Jose
Mine
Positive drilling continues to indicate:
o the current MRE model is well supported by the infill drilling
o mineralized intervals extending beyond the current MRE model, highlighting the potential
for a broader mineralized envelope and significantly increased tonnage.
Way Forward
Variscan continues to deliver on its stated drilling plan and is pleased to confirm that its upscaled
underground drilling program will continue well in 2024. Together with a planned surface drilling campaign
in Q2/2024, the objective of delivering a MRE upgrade later this year remains extant.
6
Variscan’s Managing Director & CEO, Stewart Dickson said,
"Today we announced additional high-grade results from the ongoing underground drilling campaign at the
San Jose Mine. The new assay results from drillholes continue to display significant zinc grades over
substantial thicknesses as we continue to define and develop one of the highest-grade, development stage
zinc deposits in Europe.
The Board have decided that the underground drilling campaign will continue until mid 2024. Using our own
portable drill rig and staff enables us to conduct this program efficiently, cost effectively and with a high
degree of flexibility. This is in contrast to the wider junior mining sector which is signaling reduced drilling
activity. In short, we are drilling when others aren’t or can’t.
We look forward to reporting our next batch of assays from testing cross-cuttings structures beyond the
existing Mineral Resource Estimate model. Our drilling campaign together with other exploration activities
continue to support our overarching objective to assess the re-start potential of the San Jose Mine”.
ENDS
This ASX announcement has been approved by the Board and authorised for issue by Mr Stewart Dickson, Managing
Director and CEO, Variscan Mines Limited
For further information, please contact:
Variscan Mines Limited (ASX:VAR)
Stewart Dickson
Managing Director & CEO
E: stewart.dickson@variscan.com.au
T: +44 (0) 7799 694195
Media & Investor Enquiries
The Capital Network
Julia Maguire
E: julia@thecapitalnetwork.com.au
P: +61 2 8999 3699
About Variscan Mines Limited (ASX:VAR)
Variscan Mines Limited (ASX:VAR) is a growth oriented, natural resources company focused on the acquisition,
exploration and development of high-quality strategic mineral projects. The Company has compiled a portfolio of highimpact base-metal interests in Spain, Chile and Australia. Its primary focus is the development of its advanced zinc
projects in Spain. The Company’s name is derived from the Variscan orogeny, which was a geologic mountain building
event caused by Late Paleozoic continental collision between Euramerica (Laurussia) and Gondwana to form the
supercontinent of Pangea.
To learn more, please visit: www.variscan.com.au
For more information
Follow us on LinkedIn
Follow us on Twitter
Visit our investor website: www.variscan.com.au
7
Competent Person Statement
The information in this document that relates to technical information about the Novales-Udias project is based on, and
fairly represents information and supporting documentation compiled and reviewed by Dr. Mike Mlynarczyk, Principal
of the Redstone Exploration Services, a geological consultancy acting as an external consultant for Variscan Mines. Dr.
Mlynarczyk is a Professional Geologist (PGeo) of the Institute of Geologists of Ireland, and European Geologist (EurGeol)
of the European Federation of Geologists, as well as Fellow of the Society of Economic Geologists (SEG). With over 10
years of full-time exploration experience in MVT-style zinc-lead systems in several of the world’s leading MVT provinces,
Dr. Mlynarczyk has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the December
2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (‘JORC Code’). Dr. Mlynarczyk consents to the inclusion in the report of the matters based upon the
information in the form and context in which it appears.
The information in this document that relates to previous exploration results was prepared pre-2012 JORC code. It is
the opinion of Variscan that the exploration data is reliable. Although some of the data is incomplete, nothing has come
to the attention of Variscan that causes it to question the accuracy or reliability of the historic exploration.
Forward Looking Statements
Forward-looking statements are only predictions and are not guaranteed. They are subject to known and unknown risks,
uncertainties and assumptions, some of which are outside the control of the Company. Past performance is not
necessarily a guide to future performance and no representation or warranty is made as to the likelihood of
achievement or reasonableness of any forward-looking statements or other forecast. The occurrence of events in the
future are subject to risks, uncertainties and other factors that may cause the Company’s actual results, performance
or achievements to differ from those referred to in this announcement. Given these uncertainties, recipients are
cautioned not to place reliance on forward looking statements. Any forward-looking statements in this announcement
speak only at the date of issue of this announcement. Subject to any continuing obligations under applicable law and
the ASX Listing Rules, the Company, its directors, officers, employees and agents do not give any assurance or guarantee
that the occurrence of the events referred to in this announcement will occur as contemplated.
8
JORC Table 1, Sections 1 and 2
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg
cut channels, random chips, or
specific specialised industry standard
measurement tools appropriate to
the minerals under investigation,
such as down hole gamma sondes,
or handheld XRF instruments, etc).
These examples should not be taken
as limiting the broad meaning of
sampling.
• Include reference to measures taken
to ensure sample representativity
and the appropriate calibration of
any measurement tools or systems
used.
• Aspects of the determination of
mineralisation that are Material to
the Public Report.
• In cases where ‘industry standard’
work has been done this would be
relatively simple (eg ‘reverse
circulation drilling was used to
obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g
charge for fire assay’). In other
cases more explanation may be
required, such as where there is
coarse gold that has inherent
sampling problems. Unusual
commodities or mineralisation types
(eg submarine nodules) may warrant
disclosure of detailed information.
• Drill type (eg core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (eg core
diameter, triple or standard tube,
depth of diamond tails, facesampling bit or other type, whether
core is oriented and if so, by what
method, etc).
• Method of recording and assessing
core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Whether a relationship exists
between sample recovery and
•
Drilling
techniques
Drill sample
recovery
•
•
•
Drilling being reported has been sampled with industry best
practice methods (for the sake of representativeness - as full
core, because of its comparatively small diameter of 38 mm),
and the samples were sent to the accredited ALS Seville
laboratory for analysis. The samples are considered
representative and include waste intervals on the periphery of
mineralised intersections. It is assumed that the equipment used
was calibrated correctly as per the internal SOP’s at ALS.
The new drillholes reported are located in the central part of the
San Jose Mine. All holes consist of underground diamond
drillholes and were sampled as full core from 25cm to 1.25m
sample length (average 1.00m) with at least a single 1m sample
either side to cover the periphery of the mineralised intersection.
The analytical method used by ALS is Zn-OG62h for Zinc and
Pb-OG62h for Lead, as well as Zn-AA07 for non-sulphide
(‘oxide’) zinc. These are considered appropriate for the deposit
type.
The new drillholes referred to in this press release are
underground diamond drillholes (core) completed using a Hilti
portable drill, at a core diameter of 38mm.
These new holes have not employed oriented core methods.
• The core recovery for this batch of underground drillholes has
been quite variable, with two holes in the 70-80% range, owing
to the presence of large open fractures and vugs. Drill core
recovery information has been formally recorded for all drillholes
at this time, as it forms part of the detailed core logging. The
lowest recovery recorded for an entire drillhole from this batch is
73.9% mean recovery; however, this is anomalous compared to
the other holes with logged recovery generally being in the range
9
Criteria
JORC Code explanation
grade and whether sample bias
may have occurred due to
preferential loss/gain of
fine/coarse material.
Logging
• Whether core and chip samples have
been geologically and
geotechnically logged to a level of
detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of
the relevant intersections logged.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core
taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc. and
whether sampled wet or dry.
• For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted
for all sub-sampling stages to
maximise representativity of
samples.
• Measures taken to ensure that the
sampling is representative of the insitu material collected, including for
instance results for field
duplicate/second-half sampling.
• Whether sample sizes are
appropriate to the grain size of the
material being sampled.
Quality of assay
data and
laboratory tests
• The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
• For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the parameters used
Commentary
90-97%.
• No special methods have been used to maximise sample recovery;
as its occasionally low values are not caused by core loss, but are
related to presence of natural voids.
• The relationship between sample recovery and grade has not
been assessed thus far.
• Detailed geological and geotechnical logging has been carried
out for all reported drillholes. Currently there is sufficient
geotechnical and geological logging data to support a Mineral
Resource estimate, which was recently completed.
• Total percentage of holes that have been logged for lithology,
veins, alteration, and mineralisation is 100% and the total
percentage of new drillholes that has detailed recovery and
geotechnical logging is 100% at this stage (based on all logs
available). All of the drill core from the reported batch was
photographed before sampling, which was especially important,
as unlike the previous underground drilling campaigns of Variscan
Mines, full core was assayed this time.
• New drillholes have been sampled using reasonable industry
procedures for logging (of mineralisation), sampling, and QAQC
for this project.
• The samples were selected by geologists for these new drillholes
based on logging of mineralised intervals, core was sampled as
full core. Samples were preferred at 1m lengths, although they
were permitted flexibility from 25cm to 1.25m sample lengths
where geological boundaries existed. A minimum of three samples
were taken for any mineralised intersection, the first sample
encompassing the mineralised zone and the other two samples
selected either side to ensure waste intervals were sampled to
define the boundaries of mineralisation. Additionally, when a
separate geological zone of rubble or broken core began, a new
sample was taken and when solid core resumed the next samples
were selected. In zones of poor recovery <80% the default
sample intervals were the drillers depth markers. The nature and
quality of sampling techniques are considered appropriate for
this deposit and drilling type.
• All half core samples were sent directly to ALS Seville laboratory
for preparation and subsequent analysis, according to industry
standards with crushing, pulverizing and splitting prior to sample
analysis.
• Sample sizes taken for the drilling reported (i.e., full core) are
considered suitable for the deposit type and style of
mineralisation at this stage of exploration.
• For the new drilling reported the sampling is considered total as
no drillcore remains. The laboratory is accredited (ALS Seville)
and the techniques for Zn/Pb (Zn-OG62h, Pb-OG62h, and ZnAA07) are considered suitable for the elements in question.
• No handheld or downhole geophysics data were collected during
this campaign.
• QAQC Procedures adopted for this batch of drilling results
included a total of twenty QAQC samples inserted into the sample
10
Criteria
JORC Code explanation
Commentary
in determining the analysis including
instrument make and model, reading
times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (ie lack of bias)
and precision have been established.
Verification of
sampling and
assaying
Location of data
points
• The verification of significant
intersections by either independent
or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data,
data entry procedures, data
verification, data storage (physical
and electronic) protocols.
• Discuss any adjustment to assay
data.
•
• Accuracy and quality of surveys used
to locate drill holes (collar and
down-hole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation.
• Specification of the grid system
used.
• Quality and adequacy of
topographic control.
•
•
•
•
•
•
•
stream (total of 106 drill core samples, not including QAQC).
These included three high-grade CRMs (OREAS 134B) inserted
into the mineralised zone, three medium grade CRMs (OREAS
133A) and five low grade CRM (OREAS 130) inserted in between
waste rock or barren samples, as well as three blanks. Also,
internal duplicates were requested to ALS for three mineralised
samples and these sample ID’s were indicated to the laboratory.
In total, for the batch of samples reported within this press release
the QAQC samples comprised 16% of the sample population
submitted for analysis. This frequency and variety of QAQC
samples inserted into the sample stream is considered adequate;
with industry best practice typically requiring 15-20% of the
sample population to be QAQC samples in the sample stream.
The QAQC sample results were interpreted and showed good
repeatability.
Analytical processes are being supervised by senior ALS staff
experienced in mineral assaying.
The new diamond drillholes are mostly located below the historic
stopes of the northern and central part of the San Jose
underground mine. Some of the holes are located near existing
historical drillholes, however, they cannot be considered twinned
holes at this stage.
Primary data for this underground drilling campaign is currently
stored in excel and all assay certifications and final assay results
provided by ALS Seville have been reviewed.
Assay data are reported in two ways within this press release, the
first are raw assay values unchanged or altered, and the second
are calculated significant intercepts or aggregated consecutive
sample intervals using sample length weighted mean grades for
Zn and Pb, assuming an ore grade of zero for the intervals with
missing drill core (natural voids).
The underground drillhole collars from the Variscan Mines drilling
campaigns were initially surveyed using the Nortop Ingenieros
S.L.U Total Station determined points and using an 'all-in-one’
laser disto device (incorporating digital compass, clinometer and
distance meter) placed on a 4kg tripod to avoid movements and
a topographic rod (with bubble level) to mark the position of the
Nortop points. Checks were made with a Brunton compass to
verify that there were no measurements errors. Several checks
were made with Nortop points bases obtaining the same results.
These are considered relatively accurate.
Subsequently, both the Variscan Mines and all of the historical
underground drill collars were systematically resurveyed by
physical in-situ inspection and using the data cloud of the 3D laser
survey of the San Jose mine drifts and stopes realized by
Variscan Mines in the years 2020-2022. All of the collar
locations were then cross-checked with detailed historical mine
plans. In addition, for every drill collar surveyed, the drill trace
azimuth and inclination were measured in situ using a Brunton
compass and checked across the historical drill records.
All the maps and 3D models referenced in this report have been
made with ETRS89.
Surface topography was provided by CNIG (IGN) as
11
Criteria
JORC Code explanation
Data spacing
and distribution
• Data spacing for reporting of
Exploration Results.
• Whether the data spacing and
distribution is sufficient to establish
the degree of geological and grade
continuity appropriate for the
Mineral Resource and Ore Reserve
estimation procedure(s) and
classifications applied.
• Whether sample compositing has
been applied.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type.
• If the relationship between the
drilling orientation and the
orientation of key mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and reported if
material.
Commentary
topographic contours at 25k scale, the contours were used to
generate a digital terrain model in 3D after transformation to
the local mine grid to conform to the majority of drillhole data in
Leapfrog Geo and Datamine StudioRM. It is considered
satisfactory for these purposes.
• The San Jose mine 3D underground laser survey was conducted
by 3DMSI using a robotic total station to take the in-situ preexisting historical survey pin locations to use as reference points.
A “Z+F Imager 5050C laser scanner”, as well as a “Leica
Geosystems TS16 01 total station” for controlling positional
accuracy and a “Leica geosystems BLK-2-GO” for detailed
mapping of the tunnels and drives were used to capture data
inside stopes and drives at San Jose, and these data were
registered as a point cloud. The BLK-2-GO was controlled with
targets positioned with the TS16 on the corners of the drives.
• The reported drillholes have been drilled in a fan pattern from
drilling pads underground. These holes have been drilled in
various orientations (both downward and upward) and their
spacing varies to some extent (see table in Appendix 1). At this
stage there is sufficient distribution of drillholes to support
geological and grade continuity for the main San Jose mine area.
However, the smaller peripheral zones require further exploration
to improve geological confidence in interpretation.
• Assay data for the new drillholes are reported in two ways within
this press release, the first are raw assay values unchanged or
altered and the second are calculated significant intersections or
aggregated consecutive sample intervals using sample length
weighted mean grades for Zn and Pb. Please note, there are
occasional sample intervals where drill core could not be obtained
due to the presence of natural cavities, these intervals were
manually set to 0% Zn and 0% Pb prior to calculating mean
grades for intersections.
• Mineralisation at the project occurs as stratabound, sub-horizontal
and lenticular, following sub-vertical trends, and with lateral and
vertical extensions with a significant control by steeply-dipping
feeder fault zones. Mineralisation in this setting presents as ‘bags’
(pods) with sub-horizontal lenticular form. Due to the irregular
and/or variable nature of the mineralisation, an estimate of
potential bias through orientation of sampling has not been made.
• While the location of mineralisation centres on the Novales trend
follows a broad NNE strike, the orientation of distinct orebodies
on this trend is understood to be variable both in terms of strike
and dip. Underground drilling is often radial in nature, and no
comment can be made on the orientation of drilling in respect of
mineralisation orientation.
• New drillholes have been oriented at a variety of orientations
both drilling above and below (positive and negative dips) from
the main gallery level at present, similar to those drilled
historically to intersect mineralised lenses and corridors above and
below the main gallery level. These orientations are considered
appropriate for the geometry of this mostly lenticular MVT
mineralisation at San Jose.
12
Criteria
JORC Code explanation
Commentary
Sample security
• The measures taken to ensure sample
security.
• Samples are securely stored at the locked on-site core shed and
were handed directly to a courier for transport to ALS Seville.
Samples were logged and collected on site under supervision of
the responsible Variscan geologist.
Audits or
reviews
• The results of any audits or reviews
of sampling techniques and data.
• No detailed 3rd party audits have taken place regarding the
sampling techniques for new drillholes.
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
•
Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
• The security of the tenure held at the
time of reporting along with any
known impediments to obtaining a
licence to operate in the area.
• Acknowledgment and appraisal of
exploration by other parties.
•
• Deposit type, geological setting and
style of mineralisation.
•
Exploration
done by other
parties
Geology
•
•
•
Drill hole
Information
• A summary of all information material
to the understanding of the
exploration results including a
tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception
depth
o hole length.
• If the exclusion of this information is
•
•
•
The exploitation permit for the San Jose historic mine area near
Novales is owned by Variscan Mines.
The author is not aware, at the time of writing this, of any issues
with tenure or permission to operate in this region.
This report does not refer to historical drilling undertaken by
historic mining companies operating the Project from the 1950’s
to the mid 1980’s, i.e., Hispanibal and Asturiana de Zinc, which
have been described in detail in previous news releases.
The mineralisation at the project is considered a Mississippi
Valley Type Lead-Zinc type deposit with associated structuraland stratigraphy-controlled carbonate dissolution and
replacement Lead-Zinc type mineralisation.
Mineralisation at the project occurs as stratiform, sub-horizontal
and lenticular, following sub-vertical trends, and with lateral
and vertical extensions, with a significant control by steeplydipping feeder faults. Mineralisation in this setting presents as
‘bags’ (pods) with sub-horizontal lenticular form.
In total, 29 underground drillholes have been completed to
date in this latest underground drilling campaign of Variscan
Mines started in Q2 2021. This press release presents new
assay data for 13 drillholes from this campaign, see table in
Appendix 2 for raw assay data from the laboratory. The
remaining holes lacked visible mineralisation and were not
assayed.
All 13 collar co-ordinates, hole depths, and orientations for the
holes reported in this announcement have been provided in the
table in Appendix 1.
No information has been excluded.
13
Criteria
JORC Code explanation
Data
aggregation
methods
•
•
Relationship
between
mineralisation
widths and
intercept
lengths
•
•
•
Diagrams
•
Balanced
reporting
•
Other
substantive
exploration
data
•
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually
Material and should be stated
Where aggregate intercepts
incorporate short lengths of highgrade results and longer lengths of
low grade results, the procedure used
for such aggregation should be stated
and some typical examples of such
aggregations should be shown in
detail.
The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
These relationships are particularly
important in the reporting of
Exploration Results.
If the geometry of the mineralisation
with respect to the drill
Share your feedback
Discover