Quarterly Activities and Cash Flow Reports
Released
Released
Announcement PDF
December 2023 Quarterly Report | 31 January 2024
Variscan Mines Limited (ASX:VAR)
Variscan publishes maiden JORC MRE for San Jose Mine
Underground drilling discovers new high grade lower lens
Guajaraz exploration license extended
Investment highlights during the Quarter
•
•
•
Variscan Mines published a maiden JORC Mineral Resource Estimate (‘MRE’) for its historically
producing San Jose Mine, situated in northern Spain:
o Total resource of 1.1Mt @ 9.0% Zinc, 1.2% Lead
o Resources in the Indicated category represent 45% of the MRE with grades notably
higher (10% Zn) than those in the Inferred category (8.2% Zn).
o MRE provides potential for significant grade and tonnage increases with infill drilling.
o The deposit is considered to be of sufficient grade, quantity, and continuity to have
reasonable prospects for eventual economic extraction.
o Additional JORC Exploration Target 1 of 3Mt - 6Mt, with grade ranges of 7 - 11% Zn and
0.3 - 1.6% Pb has also been estimated for the San Jose Mine and Udías deposits
indicating the potential for the MRE to grow
o The Exploration Target for the San Jose Mine is supplemental to the existing JORC
Exploration Target over the entire Novales-Udias Project published by Variscan in Q3
2022
o Mineralization remains open along strike, and at depth, offering the potential to
increase the MRE through follow-up drilling.
Ahead of the release of the MRE, Variscan Mines announced early high grade zinc assay results
from the current Phase 3 underground drilling campaign.
o These Phase 3 drill results defined a new lower lens of high-grade zinc mineralization
below La Catedral stope in the San Jose Mine.
Variscan Mines’ Exploration License for its Guajaraz Exploration License area was extended for
a further three years by the Government of Castille-La Mancha.
Variscan Mines Limited (ASX:VAR) (“Variscan” or “the Company”) is pleased to announce its Appendix 5B
for the quarter ended 31 December 2023 and an accompanying operational update for this period.
The potential quantity and grade of this exploration target is conceptual in nature, there is currently insufficient
exploration completed to support a mineral resource of this size and it is uncertain whether continued exploration will
result in the estimation of a Mineral Resource. The Exploration Target has been prepared in accordance with the JORC
Code (2012).
1
Variscan’s Managing Director & CEO, Stewart Dickson said,
“The December 2023 quarter saw Variscan Mines tick off another stated deliverable in its San Jose Mine
development plan, with an initial, maiden mineral resource estimate issued in late November.
We are proud to say that this estimate for San Jose is one of the highest-grade zinc mineral resources currently
owned by an ASX-listed company. It will be a critical input into mine re-start assessments we are now
progressing.
From here, we see plenty of scope for further significant upside in San Jose’s contained resource. Yes, the just
released MRE has validated the success of our exploration activities to date across this project. It has also,
from a “blue sky” perspective, established a platform upon which we can continue to build a resource
inventory. To this end, we will be undertaking additional exploration activities at San Jose over the first half
of calendar 2024, with the underground drilling campaign continuing. We look forward to updating investors
on progress here over coming months.
And while San Jose continues to be our major focus, we were thrilled to lock in a 3-year extension of the
Guajaraz Exploration License, located in central Spain, during the quarter. It remains a core asset in our Spainbased project portfolio and we are already working on the design of a future work program there.”
OPERATIONS REVIEW
Variscan’s exploration and development strategy for the Novales-Udias Project continued to be advanced
over the December 2023 quarter.
Spain – Novales-Udias Zinc Project
The Novales-Udias Project is located in the Basque-Cantabrian Basin, some 30km southwest from the
regional capital, Santander. The project is centred around the former producing San Jose underground mine
with a large surrounding area of exploration opportunities over the 9km Novales Trend, which includes a
number of satellite underground and surface workings.
This project, which is highly prospective across multiple fronts and located in close proximity to both major
infrastructure requirements and zinc consumers, continued to be the major focus of Variscan’s exploration
and development activities over the three months to 31 December 2023.
Initial, maiden JORC-compliant Mineral Resource Estimate for San Jose
In late November 2023, Variscan released an initial, maiden JORC (2012) compliant Mineral Resource
Estimate (“MRE”) for the San Jose Mine, near Novales, located in Cantabria, northern Spain. (see ASX
announcement dated 28 November 2023).
CSA Global (“CSA Global”), a member of the ERM Group of Companies, was engaged by Variscan to report a
MRE for the San Jose deposit and the adjacent north-eastern part of the Udías deposit.
The MRE is 1.1Mt @ 9.0% Zn and 1.2%Pb at a cut-off grade of 2% Zn.
2
Table 1. JORC Mineral Resource Estimate for San Jose Mine and north-eastern Udías by deposit and
classification reported above a 2% Zn cut-off
Notes:
•
•
•
•
Due to effects of rounding, the total may not represent the sum of all components.
Mineral Resource is reported from all blocks, classified as either Indicated or Inferred, where
interpolated block grade is ≥2.0% Zn.
Block model is coded where blocks have been depleted by historical underground mining activities.
A density value of 3 t/m3 is applied to all blocks.
Figure 1. JORC Mineral Resource Estimate for San Jose Mine and north-eastern Udías by deposit
3
The MRE has been estimated for the San Jose deposit as well as the adjacent north-eastern part of the Udías
deposits, both of which were previously mined for zinc during the 20th century.
The Project is centred around the former producing San Jose underground zinc-lead mine with a large
surrounding area of exploration opportunities over the 9km Novales Trend, which includes a number of
satellite underground and surface workings.
The MRE incorporates outcomes from extensive drilling campaigns undertaken in and around the Project.
Underground and surface drilling has been carried out since the 1960s, with a drill hole database now
comprising 1,105 drill-holes for approximately 94,808m. Variscan itself carried out surface and underground
drilling programs in 2022 and 2023, targeting extensions to the known zones of mineralisation as well as
targeting new zones of mineralisation.
The mineralisation is classified as Mississippi Valley-type (“MVT”), hosted within a stratiform dolomitic unit.
The MRE is classified as a combination of Indicated and Inferred categories and has been reported in
accordance with the JORC Code (2012) 2, with geological and sampling evidence sufficient to assume
geological and grade continuity within the volumes classified as Indicated. The MRE classification levels were
based upon an assessment of geological understanding of the deposit, geological and grade continuity,
drillhole spacing, quality control results, search and interpolation parameters, and an analysis of available
density information.
The deposit is considered to be of sufficient grade, quantity, and continuity to have reasonable prospects for
eventual economic extraction.
Figure 2. Mineral Resource Estimate categories in 3D View
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The JORC Code, 2012
Edition. Prepared by: The Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy,
Australian Institute of Geoscientists and Minerals Council of Australia (JORC).
2
4
Additional JORC Exploration Target indicates the potential scale and grade of the San Jose Mine
The abovementioned reported MRE sits within a larger JORC Exploration Target of 3Mt - 6Mt, with grade
ranges of 7 - 11% Zn and 0.3 - 1.6% Pb 3.
Table 2. JORC Exploration Target Tonnage and Grade Estimate Ranges
Figure 3. JORC Exploration Target indicates scope for Mineral Resource to grow
The potential quantity and grade of this exploration target is conceptual in nature, there is currently insufficient
exploration completed to support a mineral resource of this size and it is uncertain whether continued exploration will
result in the estimation of a Mineral Resource. The Exploration Target has been prepared in accordance with the JORC
Code (2012).
3
5
Further exploration work will occur at San Jose in calendar 2024
The Exploration Target is concentrated around the MRE deposits and over the same strike length. As these
areas are well understood by Variscan, it presents a de-risked opportunity and Variscan’s planned field work
for calendar year 2024 will include drilling over the extent of the Exploration Target.
The Exploration Target for the San Jose Mine is supplemental to the JORC compliant Exploration Target over
the larger Novales-Udias Project published by Variscan in Q3 2022 (refer ASX announcement 22 July 2022)
which remains extant.
Phase 3 Underground Drilling at San Jose Mine defines a new thick lower lens of high-grade zinc with up
to 25% zinc intersected
In early October 2023, Variscan Mines released high grade zinc assay results from the Phase 3 underground
diamond drilling campaign at the San Jose Mine (see ASX announcement dated 5 October 2023).
This drilling programme has been focussed on prospective zones identified from the development of the
Company’s 3D model and is targeting an expansion of zones of mineralization. These drill results achieve
both objectives by defining a new lower lens beneath the La Catedral in the Central Zone and expanding the
mineralization footprint with continuity as the new lens links up with the La Caseta trend. The La Catedral
lower lens is immediately accessible from main gallery level of the mine.
Selected drilling results:
•
•
•
•
•
•
NDDT007B
21.85m @ 8.50% Zn, 0.38% Pb
o including 18.05m @ 10.22% Zn, 0.46% Pb
NDDT007
23.35m @ 7.09% Zn, 1.72% Pb
o including 11.0m @ 11.58% Zn, 3.35% Pb
NDDT014
14.55m @ 5.81% Zn, 0.90% Pb
NDDT012
10.30m @ 5.09% Zn, 0.19% Pb
NDDT010
3.80m @ 24.58% Zn, 3.13% Pb
NDDT008
9.30m @ 5.18% Zn, 0.13% Pb
6
Figure 4. Cross-section of newly defined La Catedral Lower Lens, Central Zone, San Jose Mine
Figure 5. 3D model illustrating newly defined La Catedral Lower Lens, Central Zone, San Jose Mine
7
Figure 6: . Diamond Drill Core from NDDT014 (14.55m @ 5.81% Zn, 0.90% Pb) illustrating massive
sphalerite hosted in dolostone
Further critical milestones in development of San Jose are now work-in-progress
With delineation of a maiden Mineral Resource Estimate for San Jose now complete, Variscan’s next focus is
the delivery of other milestones critical to San Jose again becoming a producing mine. San Jose-related tasks
that Variscan plans to deliver over the first half of calendar 2024 include:
•
•
•
•
•
•
Preparation of a mine-restart concept study for the San Jose Mine.
A Phase 4 underground drilling campaign
A potential surface drilling campaign at San Jose along strike
A potential MRE upgrade
The potential actioning of recommendations coming out of the now-being-prepared mine re-start
study
8
Figure 7: Variscan’s pathway to development for its San Jose asset
Spain – Guajaraz Zinc Project
The Guajaraz Project is a prospective brown-field zinc-rich polymetallic opportunity with known mineral
occurrences. The project is located in the highly mineralised Central Zone of the Iberian Massif, which ranks
as one of the most mineralised geological units globally and represents the internal zone of the prolific
European Variscan Orogenic belt.
The project area lies within a primary igneous and metamorphic crystalline plateau that hosts abundant
hydrothermal vein networks that have a long history of exploration. Brittle-fault related vein and silicified
breccia ore deposits are of the BPGC type (zinc-galena-pyrite-chalcopyrite).
While the main focus over the December 2023 quarter was again the exploration and eventual development
of the Novales-Udias project, Guajaraz remains a core asset in Variscan’s portfolio.
Three-year extension of Guajaraz exploration license delivered
In late October 2023, Variscan announced that the Consejería de Desarrollo Sostenible (Department of
Sustainable Development) of the Junta de Comunidades de CastillaLa Mancha (the regional Government of
Castile-La Mancha) had approved a 3-year extension of the “Guajaraz” Permiso de Investigación (Exploration
License), located in central Spain (see ASX announcement dated 26 October 2023).
9
Figure 8. Guajaraz Project location
A long-term exploration program for Guajaraz is now taking shape
The design of a future long-term work program for the Guajaraz Project, which will extend across the 2023
through 2026 lifespan of the now renewed Exploration License, includes:
•
•
•
soil geochemistry.
geophysical survey.
initial drilling campaign.
A geophysical campaign will be carried out, covering the same areas included in the already undertaken
geochemical prospecting campaign with assay results pending.. The main objective will be to discover
polymetallic (Zn-Pb-Ag-Cu), deposits by recording anomalous chargeability and resistivity values utilising
Direct Current Induced Polarization (DCIP). Initial planning anticipates the acquisition of chargeability and
resistivity data along six profiles between 1.3-1.7km in length. The total length of the campaign will be
approximately 8,500 metres.
Depending on the results obtained in the proposed geochemical and geophysical surveys, capital allocation
and permitting, a surface drilling campaign is anticipated be conducted to drill-test targets identified. The
objective of the drilling would be to seek extensions of (Zn-Pb-Ag-Cu) mineralization stepping out from the
La Unión Mine.
Initial drill hole planning has been conducted based on the geological knowledge acquired to date. The final
location of drill-holes will be refined by the results of the preceding geochemical and geophysical surveys.
10
PROJECT SUMMARIES
Spain – Zinc-rich Novales-Udias Project
The Novales-Udias Project is located in the Basque-Cantabrian Basin, some 30 kilometres southwest from
the regional capital, Santander. The project is centred around the former producing San Jose underground
mine with a large surrounding area of exploration opportunities for a number of satellite deposits based on
underground and surface workings, our substantial database of historic drilling and multiple areas of zinc
anomalism identified from recent and historic geochemical surveys. Variscan has defined the NE-SW Novales
Trend over 9 kilometres with a parallel mineralised trend over at least 3 kilometres of strike.
Key highlights of the Novales-Udias Project:
•
•
•
•
•
•
•
•
•
•
•
•
Near term zinc production opportunity
Large tenement holding of 68.3 km2 (including several granted mining tenements)
Regional exploration potential for another discovery analogous to Reocin (total past production and
remaining resource 62Mt @ 8.7% Zn and 1.0% Pb 4,5)
San Jose Mine is within trucking distance of the Glencore zinc smelter in the neighboring region of
Asturias
Classic MVT carbonate hosted Zn-Pb deposits
Historic production of high-grade zinc; average grade reported as around 7% Zn 6
Simple mineralogy of sphalerite – galena – calamine
Ore is strata-bound, epigenetic, lenticular and sub-horizontal
Reported historic production of super high grade ‘bolsas’ (ore bags) commonly 10-20% Zn and in
some instances +30% Zn 7
Assay results of targeted grab samples taken from within the underground Novales Mine recorded
31.83% Zn and 62.3% Pb 8
Access and infrastructure all in place
Local community and government support due to historic mining activity
1 Velasco, F., Herrero, J.M., Yusta, I., Alonso, J.A., Seebold, I. and Leach, D., 2003 - Geology and Geochemistry of the
Reocin Zinc-Lead Deposit, BasqueCantabrian Basin, Northern Spain: in Econ. Geol. v.98, pp. 1371-1396.
5
Cautionary Statement: references in this announcement to the publicly quoted resource tonnes and grade of the
Project are historical and foreign in nature and not reported in accordance with the JORC Code 2012, or the categories
of mineralisation as defined in the JORC Code 2012. A competent person has not completed sufficient work to classify
the resource estimate as mineral resources or ore reserves in accordance with the JORC Code 2012. It is uncertain that
following evaluation and/or further exploration work that the foreign/historic resource estimates of mineralisation
will be able to be reported as mineral resources or ore reserves in accordance with the JORC Code 2012.
6
Anecdotal evidence from original Novales miners interviewed during the WAI Due Diligence supported with historical
production data from the School of Mines in Torrelavega historical archives
7
4 Anecdotal evidence from original Novales miners interviewed during the WAI Due Diligence supported with
historical production data from the School of Mines in Torrelavega historical archives.
8
Refer to ASX Announcement of 19 December 2019.
4
11
Figure 9. San Jose Mine site proximal to San Juan Smelter and regional capital, Santander
Spain – Guajaraz Zinc-rich Polymetallic Project
The Guajaraz Project is a prospective brown-field zinc-rich polymetallic opportunity with known mineral
occurrences. The project is located in the highly mineralised Central Zone of the Iberian Massif, which ranks
as one of the most mineralised geological units globally and represents the internal zone of the prolific
European Variscan Orogenic belt. Variscan believes Guajaraz represents an excellent, de-risked brownfield
polymetallic project. Reflective of this belief in the prospectivity of this Project, the Company filed an
application with the authorities in Castilla-La Mancha during the year for a 3-year extension of the current
exploration licence over the Guajaraz tenement area. This 3-year extension, covering the period 2023
through 2026 was granted to Variscan Mines’ local Spanish subsidiary, Variscan La Mancha in late October
2023.
FINANCIAL & CORPORATE
CASH
Cash at bank at the end of the quarter was $779,000
Subsequent to the end of the quarter, the Company issued 14,555,556 new shares at $0.018 each, raising
approximately $262,000 before costs.
SUMMARY OF EXPENDITURE ON EXPLORATION ACTIVITIES
For the quarter, the Group spent $285,000 on exploration activities, substantively all of which related to the
Group’s Spanish zinc projects. These exploration activities related to:
•
•
•
Surface and underground drilling;
Geological mapping and modelling;
Technical consulting fees;
12
•
•
Tenement administration, reporting and management; and
Directly-attributable corporate overheads and administration costs.
In accordance with ASX Listing Rule 5.3.2, the Company advises that no Mining Development or Production
activities were conducted during the quarter.
SHARE CAPITAL
Late in the December 2023 quarter, Variscan issued 2,385,627 shares to Directors in lieu of fees, as approved
by shareholders at the Company’s 2023 Annual General Meeting held on 14 November 2023 (see ASX
announcement dated 28 December 2023). In the same announcement, the Company advised that 2,500,000
performance rights have been validly exercised, resulting in the issue of 2,500,000 new ordinary shares.
As noted at 30 June 2023, a portion of the placement funds relating to the second tranche of the recent
Capital Raising, totaling $595,000 had been delayed. The Board advises that the remaining funds have since
been received and the final tranche of shares and options were issued to the subscriber on 19 January 2024
as noted above.
DEFERRED SETTLEMENT SHARES
In accordance with the acquisition of the Spanish Zinc projects, the Company must issue additional shares
upon the satisfaction of certain exploration milestones. These milestones are for the definition, in accordance
with JORC 2012, of an Inferred Mineral Resource (or greater) of:
•
•
•
Milestone 1: 4 million tonnes at 7% Zn
Milestone 2: 8 million tonnes at 7% Zn
Upon satisfaction of each of these milestones, the Company must issue 27,500,000 ordinary shares
to the vendors of Slipstream Spain Pty Ltd and Slipstream Spain 2 Pty Ltd, and 2,426,471 shares to
Hispanibal S.L. as the vendor of the “Hispanibal Option”, for a total of 59,852,941 Ordinary Shares if
both milestones are met.
There is currently no obligation to issue the milestone shares
OTHER
During the quarter, the Company made payments to related parties of $23,000, represented by
remuneration paid to Directors.
ENDS
This ASX announcement has been authorised by the Variscan Mines Limited
For further information, please contact:
Variscan Mines Limited (ASX:VAR)
Stewart Dickson
Managing Director & CEO
E: stewart.dickson@variscan.com.au
T: +44 (0) 7799 694195
13
Media & Investor Enquiries
The Capital Network
Julia Maguire
E: julia@thecapitalnetwork.com.au
P: +61 2 8999 3699
About Variscan Mines Limited (ASX:VAR)
Variscan Mines Limited (ASX:VAR) is a growth oriented, natural resources company focused on the acquisition,
exploration and development of high-quality strategic mineral projects. The Company has compiled a portfolio of highimpact base-metal interests in Spain, Chile and Australia. Its primary focus is the development of its advanced zinc
projects in Spain. The Company’s name is derived from the Variscan orogeny, which was a geologic mountain building
event caused by Late Paleozoic continental collision between Euramerica (Laurussia) and Gondwana to form the
supercontinent of Pangea.
To learn more, please visit: www.variscan.com.au
For more information
Follow us on LinkedIn
Follow us on X (formerly Twitter)
Visit our investor website: www.variscan.com.au
COMPETENT PERSONS STATEMENT
The information in this document that relates to the Exploration Target, exploration results and technical information
is based on, and fairly represents information and supporting documentation reviewed by Dr. Mike Mlynarczyk,
Principal of the Redstone Exploration Services, a geological consultancy acting as an external consultant for Variscan
Mines. Dr. Mlynarczyk is a Professional Geologist (PGeo) of the Institute of Geologists of Ireland, and European Geologist
(EurGeol) of the European Federation of Geologists, as well as Fellow of the Society of Economic Geologists (SEG). With
over 10 years of full-time exploration experience in MVT-style zinc-lead systems in several of the world’s leading MVT
provinces, Dr. Mlynarczyk has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the
December 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (‘JORC Code’). Dr. Mlynarczyk consents to the inclusion in the report of the matters based upon the
information in the form and context in which it appears.
Where reference is made to previous releases of exploration results and mineral resource estimates in this
announcement, the Company confirms that it is not aware of any new information or data that materially affects the
information included in those announcements and all material assumptions and technical parameters underpinning the
exploration results and mineral resource estimates included in those announcements continue to apply and have not
materially changed.
14
LISTING OF TENEMENTS HELD AT 31 DECEMBER 2023
Tenement
SPAIN – Note 5
Tenement No.
Interest
Joint Venture Details
Cantabria
Buenahora Fraction 1
IP 16.662-01
100%
Buenahora Fraction 2
IP 16.662-02
100%
San José
EC 94
100%
La Torra
EC 512
100%
Tres Amigos
EC 1565
100%
Torpeza
EC 2557
100%
Andrea
EC5220
100%
Andrea-demasía a
EC5374
100%
Es
EC8049
100%
Dudosa
EC8165
100%
Cargadoiro
EC11589
100%
Tres amigos-demasía a
EC11594
100%
Flor del pueblo
EC12942
100%
Torpeza-demasía a
EC12952
100%
Torpeza-3ª demasía a
EC13079
100%
Torpeza-2ª demasía a
EC13080
100%
Flor del pueblo-demasía a
EC13154
100%
Dudosa-demasía a
EC13170
100%
Andrea-3ª demasía a
EC13175
100%
Andrea-2ª demasía a
EC13176
100%
Cargadoiro-demasía a
EC13260
100%
Ampliación a Matilde
EC13641
100%
Aumentada
EC14238
100%
Campitos
EC14554
100%
Campitos-demasía a
EC14640
100%
Carmenchu
EC14945
100%
Amelita
EC14949
100%
Eloísa
EC14947
100%
Ampliación a Matilde-demasía a
EC14948
100%
Cargadoiro 2
EC14954
100%
Amelita-demasía a
EC14979
100%
Carmenchu-demasía a
EC14980
100%
Eloísa-demasía a
EC14981
100%
Carmenchu-2ª demasía a
EC14982
100%
6º Aumento a porvenir
EC15672
100%
Ampliación a Matilde-demasía a
EC13641-10
100%
Campitos-segunda demasía a
EC14554-20
100%
Cargadoiro 2- demasía a
EC14954-10
100%
Carmenchu-tercera demasía a
EC14980-30
100%
15
Tenement
6º Aumento a porvenir-demasía a
Tenement No.
EC15672-10
Interest
100%
Joint Venture Details
Torpeza-tercera demasía a
EC2557-30
100%
IP 4.203
100%
Rosario 6 1-40
0310259624
10.4%
Note 4
Rosario 7 1-60
0310259632
10.4%
Note 4
Rosario 101
03102N2229
10.4%
Note 4
Salvadora
0310231355
10.4%
Note 4
Abandonara
0310248487
10.4%
Note 4
Note 1
Toledo
Guajaraz
CHILE
Rosario
NEW SOUTH WALES
Willyama
EL 8075
0%
Hillston
EL 6363
39.2%
Native Dog
EL 8236
0%
Note 1
Woodlawn South
ELs 7257 and 7469
0%
Royalty interest only
Junction Dam
EL 5682
0%
Marmota acquired 100% ownership.
See Note 2
Callabonna
EL 5360
49%
Red Metal 51%, can earn 70%
St Pierre
PER
100%
Beaulieu
PER
100%
Perilya can earn 80%, Eaglehawk
9.8%
SOUTH AUSTRALIA
FRANCE
EL
= Exploration License
PER
= Permis Exclusif de Recherche (France)
IP
= Investigation Permit (Spain)
EC
= Exploration Concession (Spain)
Note 1:
Under an agreement with Silver City Minerals Limited, Broken Hill Operations and Eaglehawk Geological
Consulting Pty Ltd Variscan has converted its interest in parts of these tenements to a NSR (Net Smelter
Return).
16
Note 2:
Marmota has earned 100% of the uranium rights only in EL 5682. Variscan has a 0.5% net profits royalty
on production from a uranium mine.
Note 3:
The remaining exploration licenses owned by Variscan Mines SAS (excluding the Couflens PER) have
been conditionally acquired by a new wholly owned subsidiary, Variscan Mines Europe Limited.
Pursuant to the approval for the Subsidiary Sale, the Ministry of Economy and Finance has imposed,
without prior consultation, the compulsory relinquishment of the remaining licenses. The Company has
approved the relinquishment request and has yet to receive a response. The timetable for the
completion of the relinquishment process is unknown.
Note 4:
On 1 July 2019 the Company announced it had successfully renegotiated the terms of the existing
Option Agreement to provide the Company with a participating interest of 10.4%. The Company can
earn up to 90% of the project through payment of amounts totaling approximately US$2.25 million.
17
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Variscan Mines Limited
ABN
Quarter ended (“current quarter”)
16 003 254 395
31 December 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (6
months)
$A’000
-
-
(4)
(9)
(b) development
-
-
(c) production
-
-
(d) staff costs
(23)
(73)
(e) administration and corporate costs
(95)
(237)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
3
7
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
Net VAT refunded – Spanish
Operations
-
270
1.9
Net cash from / (used in) operating
activities
(119)
(42)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(281)
(525)
(e) investments
-
-
(f)
-
-
-
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (6
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(281)
(525)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
53
333
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
53
333
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,131
1,016
4.