GUAJARAZ DRILLING PROGRAMME ADVANCES WITH THREE HOLES
COMPLETED AND FINAL HOLES UNDERWAY
Drilling continues to test the depth and western extension of the
historical La Unión Zn-Pb-Ag mineral system
Highlights
• Diamond drilling continues at the Guajaraz Zn-Pb-Ag-Cu Project in
Toledo Province, central Spain, with the maiden programme progressing
through its priority target areas.
• Drilling strategy dynamically updated to target zones with the highest
potential for significant grade and tonnage, capitalising on the strong
macroeconomic environment with the LME zinc price recently surpassing
US$4,000/t.
• Drilling locations have been refined as geological information is received
from the initial holes, with three holes completed and two currently in
progress.
• G-03 intersected a number of brown sphalerite veinlets, providing
evidence of zinc sulphide mineralisation within the broader system at
depth.
• Core from the Guajaraz holes is being systematically logged and sampled,
with assay results expected within 6 weeks.
• The Company is progressing the application for a three-year extension of
the Guajaraz exploration permit.
• Following the completion of hole G-01, the Company intends to mobilise
one of the drill rigs to Cantabria to commence the next phase of its
surface drilling programme at the Novales-Udías Project.
Guajaraz Drilling Programme
Altoro Metals Limited (ASX: ARO) ("Altoro" or the "Company") is pleased to provide an
update on the progress of its maiden diamond drilling programme at the Guajaraz Zn-
Pb-Ag Project in Toledo Province, central Spain. This update is further to the Company's
announcements dated 10 July 2026 ("Maiden Drilling Programme at Guajaraz Zn (Pb-Ag)
Project About to Commence") and 3 June 2026 ("Surface and Underground Drilling
Advancing at the Novales Project").
This campaign reflects the Company's dual-district strategy, establishing an active
geographic footprint in Castilla-La Mancha, several hundred kilometres south of the
flagship Novales-Udías Project in Cantabria, northern Spain.
Figure 1: Guajaraz location map
The Guajaraz programme was designed to test a series of high-priority zinc-polymetallic
targets generated through geological mapping, historical mine data, and an 8.5 line-
kilometre Deep Ground Penetrating Radar (DGPR) survey. The programme consists of c.
1,400 metres of drilling, designed principally to test for deep-seated carbonate-hosted
replacement-style zinc mineralisation as well as sub-parallel structures associated with
the historical La Unión (La Económica) mine.
The historical mining system extends to approximately 280m depth over multiple levels
and is known to have produced Pb-Zn sulphide mineralisation with significant historical
silver credits. The Company's drilling strategy has deliberately avoided the principal
known mine workings and instead seeks to test the broader mineral system around and
beneath the historical workings.
Drilling Progress Summary
Drilling has progressed through a number of different geological settings, with the results
of the initial holes being used to successfully refine the structural and lithological
architecture of the Guajaraz mineral system.
Hole Current Status Target Objective Key Geological Observations
G-
02
Completed
157.05m
Displaced eastern
continuation of
the main vein
structure
Drill core has been
transported to site facilities;
undergoing logging and
assessment.
G-
03
Completed
121.00m
Sub-parallel
structure and
testing calc-
silicate outcrops
Intersected veinlets of brown
sphalerite, confirming zinc
sulphide mineralisation at
depth.
G-
04
Completed at
53.35m (the hole
was stopped early
after reaching first
target zone, in order
to promptly
relocate to
promising location
G-05)
Upper part of the
main vein
structure with
optional testing
for deep-seated
targets
Intersected the
metasedimentary rock
package exposed at surface,
providing a valuable new
structural constraint.
G-
05
In Progress
(~201.85m)
Western side of
historical system
Intersected a substantial
section of metasedimentary
rocks before entering gneissic
rock with multiple zones of
strong hydrothermal
alteration and low-grade
mineralisation
Hole Current Status Target Objective Key Geological Observations
G-01
Paused (~256m).
Hole is being
redrilled because of
technical failure.
Deeper
geological setting
/ skarn
Predominantly migmatitic to
increasingly leucocratic
granitoid rocks.
Note: The above table is laid out in chronological, rather than numerical order. The
Company will provide assay results for completed holes when analytical work and
quality control procedures are finalised (expected within 4-6 weeks).
Geological Interpretation
The geological information generated during the programme is being used progressively
to refine the Company's understanding of the Guajaraz system.
The original exploration model contemplated that the deeper portions of the historical
mine area could contain carbonate-replacement zinc mineralisation associated with a
favourable metasedimentary/carbonate sequence. The drilling to date has demonstrated
that the subsurface geology is more complex than suggested by surface exposures alone,
with substantial variations between granitoid/migmatitic, metasedimentary, and gneissic
units across the drill sections.
In particular, the intersection of the metasedimentary package in G-04 and G-05 provides
an important constraint on the geological model and supports continued evaluation of
the western portion of the system. The presence of sphalerite veinlets in G-03 also
confirms zinc sulphide mineralisation within the deeper sequence, although the
Company cautions that the significance of these observations cannot be assessed until
analytical results are available.
The Company's decision to rapidly adapt the drilling programme—such as completing G-
04 early and expediting G-05 to test a new structural position—is driven by a strategic
imperative to prioritise areas with the highest potential for scale and grade. Indeed, much
of the 200m of hole G-05 that were drilled so far consists of frequently recurring zones of
strong bleaching, as well as sericitic and chloritic alteration, recurrent quartz veining and
flooding, with minor zinc and lead mineralisation observed, implying that the hole location
is very proximal to the mineral system at depth.
The Company will continue to assess all drill core using geological logging, sampling, and
laboratory analysis, including consideration of mineralogical information where
appropriate.
Next Steps
The immediate priority is to complete the current Guajaraz drilling programme and
obtain assay results from the completed holes. The Company will:
• Continue G-05 drilling on the western side of the historical mine system.
• Continue G-01 drilling to fully test the deeper geological objectives of the
programme.
• Complete geological logging, sampling, and submission of Guajaraz core for
laboratory analysis.
• Assess the combined geological and assay results to determine the most
prospective areas for future drilling.
• Continue progressing the application for a three-year extension of the Guajaraz
exploration permit.
Once hole G-05 is completed, the Geoplanning drill rig is scheduled to mobilise to the
Company's flagship Novales-Udías Zinc Project in Cantabria, where surface drilling is
planned to test extensions of the Company's established zinc mineralised corridor. The
Guajaraz programme is being undertaken in parallel with the Company's ongoing work
at Novales-Udías, where underground drilling at Emilia has identified a broad and tightly
structurally controlled zinc mineralised system requiring further drilling and resource
definition.
The full suite of drill hole data and JORC Table 1 information will be presented once
assays are received.
This announcement has been authorised for release by the Board of Altoro Metals Limited.
ENDS
For further information, please contact:
Altoro Metals Limited
Tony Wehby
Chairman
info@altorometals.com
Media & Investor enquiries
Jane Morgan
Director
jm@janemorganmanagement.com.au
About the Guajaraz Project
The Guajaraz Project comprises a 1,530-hectare brownfield exploration permit in the
Central Zone of the Iberian Massif, encompassing parts of the Mazarambroz, Pulgar,
Casasbuenas, and Noez municipalities in Toledo Province, Castilla-La Mancha, central
Spain. The project takes its name from the local Guajaraz stream, which rises near
Mazarambroz before eventually flowing into the Tagus river.
The project is centred on the historical La Unión (La Económica) mine near Mazarambroz
and includes seven known mineral occurrences. Historical mining occurred intermittently
from 1945 until the mid-1980s, with workings extending to approximately 280m depth
over ten levels. Historical records indicate production of Pb-Zn sulphide mineralisation,
including galena and sphalerite, with reported silver credits. Historical exploration also
identified a number of additional mineralised structures and occurrences across the
project area. Altoro's current exploration programme follows geological mapping,
geochemical sampling, and an 8.5 line-kilometre DGPR survey undertaken to identify and
prioritise targets for modern exploration.
The maiden drilling programme is designed to test the continuity of the mineral system
at depth and along strike and to establish a modern geological framework for future
exploration.
Competent Person Statement
The information in this announcement that relates to technical information and previous
exploration results for the Guajaraz Project is based on, and fairly represents, information and
supporting documentation compiled and reviewed by Dr Mike Mlynarczyk, Principal of
Redstone Exploration Services, a geological consultancy acting as an external consultant to
Altoro Metals. Dr Mlynarczyk is a Professional Geologist (PGeo) of the Institute of Geologists of
Ireland and European Geologist (EurGeol) of the European Federation of Geologists, as well as
Fellow of the Society of Economic Geologists (SEG). Dr Mlynarczyk has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to
the activity being undertaken to qualify as a Competent Person as defined in the December
2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves (JORC Code). Dr Mlynarczyk consents to the inclusion in the announcement
of the matters based upon his information in the form and context in which it appears.
The information in this document that relates to previous exploration results was prepared
pre-2012 JORC code. It is the opinion of the Company that the exploration data is reliable.
Although some of the data is incomplete, nothing has come to the attention of the Company
that causes it to question the accuracy or reliability of the historic exploration.
Forward-Looking Statements
This announcement may contain forward-looking statements, including statements
regarding planned exploration activities, drilling, timing of drilling and receipt of assay results,
future exploration programmes and the Company's exploration strategy. Forward-looking
statements are only predictions and are subject to known and unknown risks, uncertainties
and assumptions, many of which are outside the control of the Company. Actual results may
differ materially from those expressed or implied by such statements. Past performance is not
necessarily a guide to future performance. The Company makes no representation or warranty
as to the likelihood of achievement or reasonableness of any forward-looking statements. The
occurrence of events in the future is subject to risks, uncertainties and other factors that may
cause the Company's actual results, performance or achievements to differ materially from
those referred to in this announcement. Given these uncertainties, recipients are cautioned
not to place undue reliance on forward-looking statements. The Company undertakes no
obligation to update or revise any forward-looking statements, except as required by
applicable law or the ASX Listing Rules.
Share your feedback
Discover