Exceptional Zinc Grades Confirmed at Emilia
Released
Released
Announcement PDF
ASX:ARO
ASX Announcement
11 August 2026
ABN 16 003 254 395 info@altorometals.com PO Box 7059
Cloisters Square PO
Perth Western Australia 6850
EXCEPTIONAL ZINC GRADES CONFIRMED AT EMILIA ON
>12KM NOVALES ZINC TREND
New systematic channel sampling returns up to 21.1% zinc across multiple
metre-scale intervals at Emilia, strengthening the exploration case ahead of
planned drilling to test mineralised continuity and resource growth along the
>12km Novales zinc trend.
HIGHLIGHTS
● New systematic channel sampling at the historic Emilia Mine has returned
multiple high-grade, metre-scale zinc (Zn) intervals, including.
○ 2.65m @ 21.10% Zn and 0.14% lead (Pb)
○ 2.60m @ 18.55% Zn and 0.18% Pb
○ 1.70m @ 15.40% Zn and 3.24% Pb
○ 1.40m @ 16.00% Zn and 0.54% Pb
○ 2.70m @ 14.05% Zn and 0.13% Pb
○ 2.90m @ 13.30% Zn and 0.84% Pb
● Longer composite channel intervals confirm high grades across broader
sampled widths, including:
○ 4.50m @ 13.71% Zn and 0.11% Pb
○ 3.90m @ 9.44% Zn and 1.51% Pb
● The new results are derived from systematic continuous channel sampling,
providing modern, JORC-compliant exploration data from the historic Emilia
workings and complementing the high-grade historical drilling results
reported in May 20261
.
• Emilia is located approximately 2.3km northeast of the San José mine on the
>12km Novales zinc trend, with significant areas of known mineralisation
occurring outside the Company’s existing Mineral Resource Estimate (“MRE”)2
.
● The results provide important new geological information ahead of Altoro’s
planned surface drilling campaign in Cantabria, which will test the
prospective Zn trend between Novales, Emilia and Margarita, testing
continuity of mineralisation outside the existing MRE, with potential to
support further resource expansion.
1
ASX Announcement, 11 May 2026, HIGH GRADE HISTORIC SURFACE DRILLING RESULTS ON THE NOVALES ZINC TREND
2
ASX Announcement, 9 December 2024, JORC Mineral Resource Estimate for the San José Mine and north-eastern Udías
……………………………………………………………………………………………………………
Altoro Metals Limited (ASX: ARO) ("Altoro" or the "Company") is pleased to report
the results of systematic channel sampling undertaken at the historical Emilia mine,
part of the Company's Novales Project in Cantabria, northern Spain.
The programme returned multiple high-grade Zn results across metre-scale
intervals including a standout result of 2.6m @ 21.10% Zn and 0.14% Pb, together
with a broader composite interval of 4.50m @13.71% Zn and 0.11% Pb.
The new results are significant in the context of the historical exploration data
reported by Altoro in May 2026, providing modern, systematic channel sampling
data that further demonstrates the high-grade nature of mineralisation at Emilia.
A total of 28 channel samples were collected from 23 locations, comprising 25
samples from underground workings at Emilia and 3 samples from the immediately
adjacent open pit. Samples were submitted to ALS Laboratories for analysis and
were subject to appropriate Quality Assurance and Quality Control procedures.
No direct comparison has been made between the new channel sampling results
and the historical face-sampling results due to the difference in sampling
methodology. The current programme comprised continuous cut-channel sampling
and provides a more systematic basis for assessing the grade and distribution of
mineralisation at Emilia.
Figure 1: Location of Emilia, San José and Margarita within the Novales Project and
the >12km San José–Udías zinc trend.
……………………………………………………………………………………………………………
High-grade Zn Across Multiple Metre-Scale Intervals
The systematic channel sampling programme at Emilia returned high-grade zinc
mineralisation across multiple metre-scale intervals with several channels returning
grades exceeding 10% Zn.
The standout individual channel result was 2.65m @ 21.10% Zn and 0.14% Pb (E-1),
with additional high-grade results including 2.60m @ 18.55% Zn and 0.18% Pb (E-
2B), 1.40m @ 16.00% Zn and 0.54% Pb (E-6A), and 1.70m @ 15.40% Zn and 3.24%
Pb (E-7A).
Importantly, the programme also returned broader composited intervals of high-
grade mineralisation, including 4.50m @ 13.71% Zn and 0.11% Pb (E-2), 3.90m @
9.44% Zn and 1.51% Pb (E-7), and 3.65m @ 8.74% Zn and 0.40 Pb (E-6). The results
incorporated adjacent channel samples and demonstrate that high zinc grades
occur across broader sampled widths within parts of the Emilia workings.
Selected Emilia Channel Sampling Results
Channel Length Zn Pb
E-1 2.65m 21.10% 0.14%
E-2B 2.60m 18.55% 0.18%
E-7A 1.70m 15.40% 3.24%
E-6A 1.40m 16.00% 0.54%
E-11 2.70m 14.05% 0.13%
E-3 2.90m 13.30% 0.84%
E-11B 2.20m 12.00% 0.26%
E-12 2.40m 10.30% 0.03%
Table 1: Selected high-grade channel sampling results from Emilia Mine.
……………………………………………………………………………………………………………
Figure 2: Plan view of Emilia channel sampling locations showing selected zinc results
The distribution of high-grade results across multiple sampled locations provides
new geological information on the nature and distribution of zinc mineralisation
within the historic Emilia workings. The results will be integrated with historical
drilling, underground mine data and geological mapping to refine the Company’s
geological model and assist with targeting the forthcoming surface drilling
programme at Cantabria.
Emilia Strengthens the Broader Novales Exploration Opportunity
The Emilia mine is located approximately 2.3 km northeast of the San José mine,
within the broader San José–Udías zinc trend, which extends for more than 12km
across the Novales Project. Emilia sits outside the Company’s current MRE, providing
……………………………………………………………………………………………………………
a priority opportunity to test for additional mineralisation beyond the existing
resource footprint.
The new Emilia channel sampling complement the high-grade historical drilling and
underground sampling results reported in May 2026. The historical dataset
comprised 109 drillholes for approximately 6.720m across the broader Novales trend
and identified high-grade zinc mineralisation at several historic mining centres,
including Emilia and Margarita.
At Emilia, previously reported historical drilling (refer ASX announcement 11 May
2026) included:
• S-50: 0.85m @23.47% Zn and 0.90m @ 17.43% Pb; and
• S-60: 1.50m @ 14.22% Zn and 3.00m @ 2.26% Zn.
The combination of these historical results with the new channel sampling provides
an increasingly comprehensive geological dataset at Emilia and reinforces the high-
grade nature of zinc mineralisation within this part of the Novales Project.
Figure 3: Cross section of Emilia mine highlighting the location of selected channel samples
……………………………………………………………………………………………………………
Testing the >12km Novales Zinc Trend
The broader Novales Project encompasses a substantial portion of the historical
Udías mining district and includes multiple historic mining centres along the >12km
San José trend.
The Company believes this district represents an extensive and highly prospective
zinc system, with significant areas of mineralisation and additional exploration
potential outside the existing MRE. The new results from Emilia provide further
evidence of the high-grade nature and continuation of zinc mineralisation occurring
along this broader trend.
However, establishing the geological and mineralised continuity between these
centres, and the importance of structural control on the distribution and
continuation of high-grade Zn (± Pb) mineralisation is a key objective of the
forthcoming exploration and surface drilling programme.
Drilling to test continuity and expand the resource base
The Company is preparing to commence the first phase of its surface drilling
campaign in Cantabria.
A key focus of the programme will be the area between Novales village and the
Emilia and Margarita mines, where targeted drilling will test the potential
continuation of high-grade Zn mineralisation along the San José–Udías trend.
The drilling is designed to:
● test the continuity of Zn mineralisation between known historical mine
centres;
● establish the geometry, thickness and depth continuity of the mineralised
zones;
● test prospective areas outside the Company's existing MRE; and
● generate additional geological and assay data to support the potential
preparation of an MRE for this previously under-explored portion of the
Novales Project.
The new Emilia results therefore provide an important modern exploration data
ahead of the planned drilling programme and strengthen the Company’s
understanding of a key area outside the existing Novales MRE.
……………………………………………………………………………………………………………
Next steps
Altoro is advancing an active exploration programme across its Spanish portfolio,
with the immediate focus on completing the maiden drilling program at Guajaraz,
followed by the commencement of surface drilling at the Novales Project in
Cantabria.
At Novales, initial drilling will focus on the prospective area between Novales, Emilia
and Margarita, targeting extensions to known high-grade zinc mineralisation and
testing areas outside the Company’s existing MRE.
Near term activities include:
• completion of the maiden diamond drilling programme at Guajaraz, with
assay results to follow
• commencement of the planned surface drilling programme at Novales
• initial drill testing of priority targets between Novales, Emilia and Margarita
• integration of the new Emilia channel sampling results with historical drilling,
underground sampling and geological datasets to further refine drill
targeting, and
• continued advancement of exploration and technical activities across the
broader >12km Novales zinc trend.
This announcement has been authorised for release by the Board of Altoro Metals
Limited.
ENDS
For further information, please contact:
Altoro Metals Limited
Tony Wehby
Chairman
info@altorometals.com
Media & Investor enquiries
Jane Morgan
Director
jm@janemorganmanagement.com.au
……………………………………………………………………………………………………………
Mineral Resource Estimate
JORC Mineral Resource Estimate for San Jose mine and north-eastern Udías by deposit and
classification reported above at 2% Zn+Pb cut-off (ASX announcement 9 December 2024)
Competent Person Statement
The information in this announcement that relates to Exploration Results is based on and fairly
represents information and supporting documentation prepared by Dr. Michael Mlynarczyk, a
Competent Person who is a Professional Geologist (PGeo) of the Institute of Geologists of Ireland, and a
European Geologist (EurGeol) of the European Federation of Geologists, as well as a Fellow of the
Society of Economic Geologists (SEG). Dr. Mlynarczyk has sufficient experience that is relevant to the
style of mineralisation and type of deposit under consideration and to the activity being undertaken to
qualify as a Competent Person as defined in the JORC Code, 2012 Edition. Dr. Mlynarczyk consents to
the inclusion in the announcement of the matters based on this information in the form and context in
which it appears.
Where reference is made to previous releases of exploration results and mineral resource estimates in
this announcement, the Company confirms that it is not aware of any new information or data that
materially affects the information included in those announcements and all material assumptions and
technical parameters underpinning the exploration results and mineral resource estimates included in
those announcements continue to apply and have not materially changed.
The information in this document that relates to previous exploration results was prepared pre-2012
JORC code. It is the opinion of Altoro that the exploration data is reliable. Although some of the data is
incomplete, nothing has come to the attention of Altoro that causes it to question the accuracy or
reliability of the historic exploration.
……………………………………………………………………………………………………………
TABLE 1 – LOCATION OF EMILIA CHANNELS PRESENTED IN THIS NEWS RELEASE
SAMPLE
NO
CHANNEL
NO
UTM_X UTM_Y UTM_Z (base)
Length
(m)
VAR531372 E-1 405488.364 4805075.066 109.135 2.65
VAR531374 E-2A 405486.428 4805068.553 109.547 1.90
VAR531376 E-2B 405486.428 4805068.553 111.447 2.60
VAR531377 E-3 405473.235 4805052.855 106.290 2.90
VAR531378 E-4 405471.697 4805045.574 105.573 2.25
VAR531379 E-5 405451.841 4805010.418 105.525 2.00
VAR531380 E-6A 405461.696 4805030.773 104.069 1.40
VAR531381 E-6B 405462.284 4805030.213 105.441 2.25
VAR531382 E-7A 405455.793 4805036.573 98.745 1.70
VAR531384 E-7B 405453.242 4805030.069 100.009 2.20
VAR531385 E-8 405349.893 4805000.077 101.079 2.25
VAR531386 E-9 405451.321 4805023.563 99.733 2.40
VAR531387 E-10 405445.413 4805020.292 95.687 2.35
VAR531388 E-11 405442.420 4805016.764 89.688 2.70
VAR531401 E-11B 405439.413 4805021.345 89.671 2.20
VAR531390 E-12 405450.371 4805023.644 89.760 2.40
VAR531391 E-13 405445.640 4805045.969 89.888 2.00
VAR531392 E-14 405429.000 4805051.839 95.924 2.50
VAR531393 E-15 405376.444 4804989.102 90.323 1.70
VAR531394 E-16 405322.509 4804973.633 92.069 1.85
VAR531396 E-17 405353.694 4804996.494 90.327 2.40
VAR531397 E-18 405401.972 4805003.236 88.930 1.55
VAR531398 E-19A 405406.436 4805042.755 89.286 1.80
VAR531399 E-19B 405406.762 4805042.254 90.974 0.95
VAR531400 E-20 405421.250 4805019.527 88.924 2.40
VAR531403 E-21 405229.299 4804900.822 108.246 2.57
VAR531404 E-22 405236.173 4804908.628 107.792 2.20
VAR531405 E-23 405271.119 4804966.232 107.921 2.35
……………………………………………………………………………………………………………
TABLE 2 – ASSAY RESULTS FOR THE EMILIA CHANNELS PRESENTED IN THIS NEWS
RELEASE, INCLUDING BOTH RAW DATA AND COMPOSITED INTERVALS (IN ITALICS)
SAMPLE NO CHANNEL NO
CHANNEL LENGTH
(m)
Zn
(wt.%)
Zn ox
(wt.%)
Pb
(wt.%)
Zn+Pb
(wt.%)
VAR531372 E-1 2.65 21.10 0.74 0.14 21.24
VAR531374 E-2A 1.90 7.09 0.45 0.02 7.11
VAR531376 E-2B 2.60 18.55 7.36 0.18 18.73
E-2 composite 4.50 13.71 4.44 0.11 13.83
VAR531377 E-3 2.90 13.30 0.45 0.84 14.14
VAR531378 E-4 2.25 6.99 0.71 0.11 7.10
VAR531379 E-5 2.00 0.25 0.15 0.02 0.28
VAR531380 E-6A 1.40 16.00 5.77 0.54 16.54
VAR531381 E-6B 2.25 4.23 0.97 0.31 4.54
E-6 composite 3.65 8.74 2.81 0.40 9.14
VAR531382 E-7A 1.70 15.40 3.56 3.24 18.64
VAR531384 E-7B 2.20 4.83 0.71 0.17 5.00
E-7 composite 3.90 9.44 1.95 1.51 10.94
VAR531385 E-8 2.25 1.84 0.28 0.20 2.04
VAR531386 E-9 2.40 2.34 0.59 0.18 2.52
VAR531387 E-10 2.35 7.46 1.97 0.61 8.07
VAR531388 E-11 2.70 14.05 0.75 0.13 14.18
VAR531401 E-11B 2.20 12.00 0.82 0.26 12.26
VAR531390 E-12 2.40 10.30 3.61 0.03 10.33
VAR531391 E-13 2.00 7.52 6.51 0.09 7.61
VAR531392 E-14 2.50 6.13 1.17 0.26 6.39
VAR531393 E-15 1.70 1.86 0.77 0.23 2.09
VAR531394 E-16 1.85 5.01 4.36 1.77 6.78
VAR531396 E-17 2.40 7.04 1.03 0.16 7.20
VAR531397 E-18 1.55 4.74 1.98 0.18 4.92
VAR531398 E-19A 1.80 0.14 0.10 0.01 0.15
VAR531399 E-19B 0.95 3.86 1.84 0.14 4.00
E-19 composite 2.75 1.43 0.70 0.05 1.48
VAR531400 E-20 2.40 3.21 1.35 0.23 3.44
VAR531403 E-21 2.57 6.20 0.69 0.04 6.24
VAR531404 E-22 2.20 4.23 2.59 0.06 4.29
VAR531405 E-23 2.35 4.47 0.66 0.47 4.94
……………………………………………………………………………………………………………
JORC Table 1, Sections 1 and 2
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of
sampling (e.g., cut
channels, random
chips, or specific
specialised industry
standard
measurement tools
appropriate to the
minerals under
investigation, such as
down hole gamma
sondes, or handheld
XRF instruments, etc).
These examples
should not be taken
as limiting the broad
meaning of sampling.
• Include reference to
measures taken to
ensure sample
representativity and
the appropriate
calibration of any
measurement tools
or systems used.
• Aspects of the
determination of
mineralization that
are Material to the
Public News release.
• In cases where
‘industry standard’
work has been done
this would be
relatively simple (e.g.,
‘reverse circulation
drilling was used to
obtain 1 m samples
• The sample data referenced in this report
relates to recent channel rock samples
taken by Altoro Metals in May/June 2026
from the Emilia mine and its close vicinity, as
well as historical exploration undertaken by
Real Compania Asturiana de Minas (RCAM) –
one of the mining companies operating the
Project from 1855 till 1983, when it was taken
over by Asturiana de Zinc SA (AZSA) -
previously a subsidiary of Xstrata / Glencore.
• The historical underground drilling was
conducted in 1957-1962, whereas face
sampling was conducted in 1983 (the year of
change in project ownership), and the data
in paper format is held at the School of
Mines and Energy Engineering at
Torrelavega, a faculty of the University of
Cantabria. No drill core has been preserved.
The details of these historical exploration
campaigns have been presented in a
previous news release from May 11th
, 2026
(refer to:
https://altorometals.com/announcements/7
530857)
• A total of 28 cut channel samples were
collected by Altoro Metals in May/June 2026
and were taken as vertical cut channels,
whose length varied from 0.95 to 2.90m.
• Samples were cut at a constant width (two
parallel cuts separated by 5-6 cm) and
chiseled out to the same depth along the
channel, with efforts made to keep the
width of the channel and the depth of the
cuts the same.
• The cut channel sample locations were
selected at visually sulfide-rich wallrock
exposures underground and on surface.
Because accessibility was limited by rock
……………………………………………………………………………………………………………
Criteria JORC Code explanation Commentary
from which 3 kg was
pulverised to produce
a 30 g charge for fire
assay’). In other cases
more explanation
may be required,
such as where there
is coarse gold that
has inherent
sampling problems.
Unusual commodities
or mineralization
types (e.g., submarine
nodules) may
warrant disclosure of
detailed information.
exposure, not all of the samples include
waste intervals at the periphery of each
mineralised sample and therefore some
samples could be biased / not fully
representative.
• Overall, the methodology of sample
collection is considered to fulfill industry
best practice for cut channel sampling
techniques.
• The analytical method used by the ALS
laboratory is Zn-OG62h for Zinc and Pb-
OG62h for Lead, as well as Zn-AA07 for non-
sulfide (‘oxide’) zinc. These are considered
appropriate for the deposit type.
Drilling
techniques
• Drill type (e.g., core,
reverse circulation,
open-hole hammer,
rotary air blast, auger,
Bangka, sonic, etc)
and details (e.g., core
diameter, triple or
standard tube, depth
of diamond tails,
face-sampling bit or
other type, whether
core is oriented and if
so, by what method,
etc).
• The historical underground drilling reported
to have taken place at the Emilia mine (c.
109 underground drillholes from between
1957 and 1962) is understood to have been all
core drilling. No details of the drilling
techniques employed have been identified
in the historic data. This includes reference
to core diameter, core orientation methods,
nor downhole survey data.
• The details of these historical drilling
campaigns have been presented in a
previous news release from May 11th
, 2026
(refer to:
https://altorometals.com/announcements/7
530857)
Drill sample
recovery
• Method of recording
and assessing core
and chip sample
recoveries and results
assessed.
• Measures taken to
maximise sample
recovery and ensure
representative nature
of the samples.
• Whether a
relationship exists
between sample
• Cut channel samples have had no recovery
recorded, however, efforts were made to
maintain a consistent depth and width of the
channels, and no visually apparent cavities
were observed along their length.
• No historical records of drill core recovery
have been identified from the archival data.
……………………………………………………………………………………………………………
Criteria JORC Code explanation Commentary
recovery and grade
and whether sample
bias may have
occurred due to
preferential loss/gain
of fine/coarse
material.
Logging • Whether core and
chip samples have
been geologically and
geotechnically logged
to a level of detail to
support appropriate
Mineral Resource
estimation, mining
studies and
metallurgical studies.
• Whether logging is
qualitative or
quantitative in nature.
Core (or costean,
channel, etc)
photography.
• The total length and
percentage of the
relevant intersections
logged.
• No logging was conducted on the cut
channels. Only sample interval lengths were
recorded, as well as the channel widths and
depths (thicknesses).
• Of the 109 historical underground drillholes,
only 55 have complete drill collar data and of
them only 16 have assay data, which are
limited to “higher grade” intervals, with low-
grade and trace zinc / barren assay results
missing from the records. The historical logs
available for the underground drillholes are
very basic, presumably prepared by the
drillers and not geologists. No geotechnical
logs have been identified. In the absence of
detailed data, no comment on whether the
logging, where observed, is qualitative or
quantitative has be made. No core
photography has been identified.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or
sawn and whether
quarter, half or all core
taken.
• If non-core, whether
riffled, tube sampled,
rotary split, etc. and
whether sampled wet
or dry.
• For all sample types,
the nature, quality
and appropriateness
of the sample
preparation
technique.
• Quality control
• Cut channel samples were not split in any
way during the sampling process. All
material removed via cutting and chiseling
rock from the channels was collected and
sent for analysis.
• The sampling type and the preparation
technique is deemed appropriate for the cut
channels. Only the selected (bias) locations
and occasional lack of adjacent waste
interval samples included along the length of
each channel are considered as non-typical
geological practices.
• QAQC measures taken for cut channel
samples included the submission of two
pulps of known values (one medium and one
high grade zinc OREAS standards), as well as
……………………………………………………………………………………………………………
Criteria JORC Code explanation Commentary
procedures adopted
for all sub-sampling
stages to maximise
representativity of
samples.
• Measures taken to
ensure that the
sampling is
representative of the
in-situ material
collected, including for
instance results for
field
duplicate/second-half
sampling.
• Whether sample sizes
are appropriate to the
grain size of the
material being
sampled.
two duplicate samples (consisting of re-
assaying coarse sample crush material at the
lab) and two blanks - for a total 34 samples.
QAQC samples comprise 17.6 % of the sample
batch submitted to analysis, which is
considered a very satisfactory proportion of
QAQC samples to real samples, well within
the industry standard of 10-20%.
• Sample sizes and weights are considered
appropriate in relation to the grain size of the
mineralised samples.
• Historical approach to sampling drill core
appears selective, guided by geological
observation, and no “apparent” waste was
sampled (or the records were not preserved).
No details of the sub-sampling or sample
preparation techniques have been identified
from the historic records, and no supporting
sampling procedures have been identified. It
is not known whether half core or whole core
was submitted for analysis. Also, no evidence
of Quality Control procedures nor results
have been identified for the historical drilling
campaign. This includes evidence of field
duplicates or other current industry standard
quality control procedures, such as Certified
Reference Materials and blanks. In the
absence of this data and other data related
to the sub-sampling techniques and sample
preparation, one cannot comment on the
appropriateness of the sample preparation
techniques nor on whether the sample size
was appropriate to the grain size of the
sampled material
• The historical approach to face sampling
cannot be considered ‘industry standard’ by
modern standards as the full length of the
sampling profiles was not sampled, instead
focusing on a succession of multiple
sampling spots, from which larger rock chips
were taken. Therefore, there is significant
uncertainty over sampling
representativeness and any possible bias,
and the assay data are semi-quantitative at
……………………………………………………………………………………………………………
Criteria JORC Code explanation Commentary
most and cannot be relied upon. No details
of the sample preparation techniques,
sampling procedures, and QAQC measures
have been identified so far in the historical
records pertaining to the face sampling
campaign.
Quality of
assay data
and
laboratory
tests
• The nature, quality
and appropriateness
of the assaying and
laboratory procedures
used and whether the
technique is
considered partial or
total.
• For geophysical tools,
spectrometers,
handheld XRF
instruments, etc, the
parameters used in
determining the
analysis including
instrument make and
model, reading times,
calibrations factors
applied and their
derivation, etc.
• Nature of quality
control procedures
adopted (eg
standards, blanks,
duplicates, external
laboratory checks)
and whether
acceptable levels of
accuracy (ie lack of
bias) and precision
have been
established.
• Cut channel samples were sent to ALS Seville
to be analysed, with the method used as Zn-
OG62h and Pb-OG62h (for sulfide zinc and
lead), as well as Zn-AA07 (for non-sulfide
zinc). These analytical methods are deemed
appropriate for the elements being
evaluated.
• QAQC procedures used for the channel
samples included 6 out of 34 samples
submitted as pulp duplicates from a previous
sample batch. These included two OREAS
CRM zinc-lead standards, two coarse-crush
duplicates and two blanks, the results of
which were within required limits. The
resulting 17.6% QAQC samples insertion rate
is well within the required industry standard.
• With regard to historical drilling and face
sampling data, no details of Quality Control
procedures (such as duplicates, Certified
Reference Materials and blanks) and whether
they were used at the time of drilling or face
sampling have been identified from the
historical records, and no supporting
sampling procedures have been identified. It
is inferred that the techniques used were
total and representative of technology
available in the late 1950s to early 1980s. No
comment can be made on whether
acceptable accuracy or precision of results
have been established.
Verification
of sampling
and
assaying
• The verification of
significant
intersections by either
independent or
alternative company
personnel.
• Cut channel samples have not undergone
any independent verification of intersections
and no twinning of samples has been
completed.
• Cut channel sample data is stored in excel
format and no logging has been completed.
……………………………………………………………………………………………………………
Criteria JORC Code explanation Commentary
• The use of twinned
holes.
• Documentation of
primary data, data
entry procedures, data
verification, data
storage (physical and
electronic) protocols.
• Discuss any
adjustment to assay
data.
• Analytical processes are being supervised by
senior ALS staff experienced in mineral
assaying.
• Assay data are reported in two ways within
this press release, the first are raw assay
values unchanged or altered, and the second
are aggregated consecutive sample intervals
using sample length weighted mean grades
for Zn and Pb.
• No other adjustments have been made to
the assay data, except for compositing of
intervals that were split in two separate
samples owing to their significant length.
Both raw data and composited data are
presented in the tables of this news release.
• With regard to historical drilling and face
sampling data, due to the historical nature of
the results reported and the lack of
preserved drill core, it has not been possible
to verify significant drilling intersections. The
historical data does not include any twinned
holes. It is understood that Altoro Metals
may consider twinning historic drill holes as
part of the company’s upcoming drilling
campaign. The full details of these historical
drilling and sampling campaigns were
presented in a previous news release from
May 11th
, 2026 (refer to:
https://altorometals.com/announcements/75
30857)
Location of
data points
• Accuracy and quality
of surveys used to
locate drill holes
(collar and down-hole
surveys), trenches,
mine workings and
other locations used in
Mineral Resource
estimation.
• Specification of the
grid system used.
• Quality and adequacy
of topographic control.
• The high-resolution 3D LiDAR survey of the
Emilia and Margarita mines relied on a
series of LiDAR surveys of discrete mine
sectors carried out using a Satlab Cygnus
Lite Handheld Scanner SLAM (Simultaneous
Localization and Mapping) tied to
topographic reference points on surface
that were surveyed using an ultra-high
resolution Hi-target Inno1 GPS unit. The
data was processed using the software
SatPoint PC v1.2.4, specifically designed for
dense point clouds and provided with the
equipment. Georeferencing and adjustment
between dense point clouds (LAS format)
……………………………………………………………………………………………………………
Criteria JORC Code explanation Commentary
corresponding to different surveys was
performed using the free software
CloudCompare v2.13.2, as well as the
generation of three-dimensional models
(OBJ) for use in LeapfrogGeo. All the maps
and 3D models referenced in this report
were made with ETRS89.
• The location of the channel sampling sites
was done directly using the high-resolution
point cloud data, with physical confirmation
in situ, as well as comparison with
georeferenced detailed historical mine plans
with the drilling and sampling sites marked
on them.
Data
spacing
and
distribution
• Data spacing for
reporting of
Exploration Results.
• Whether the data
spacing and
distribution is
sufficient to establish
the degree of
geological and grade
continuity appropriate
for the Mineral
Resource and Ore
Reserve estimation
procedure(s) and
classifications applied.
• Whether sample
compositing has been
applied.
• Cut channel samples are located sporadically
in
Share your feedback
Discover