Completion of First Tranche of $5million Placement
ASX Announcement | 19 May 2026
Variscan Mines Limited (ASX:VAR)
VARISCAN COMPLETES FIRST TRANCHE OF $5M FUND RAISE
Variscan Mines Limited (ASX:VAR) (“Variscan” or the “Company”) is pleased to advise that
the first tranche of its recently announced placement (ASX announcement 11 May 2026) to
raise a total of $5 million (the Placement) has settled and allotment has been completed.
The Placement was well supported by a number of new sophisticated and professional
investors with Tranche 1 raising approximately $0.69 million before costs, through the issue of
174,064,708 ordinary shares at $0.004 per share.
All shares issued under the Placement will rank equally with existing fully paid ordinary shares
on issue as of the date of this announcement.
The Company advises that the Convertible Loan Facility put in place earlier in the year (ASX 30
January 2026) was undrawn and has now terminated in accordance with its terms.
An Appendix 2A and cleansing statement follows this announcement providing additional
detail.
ENDS
To ask questions directly to the Variscan management team and access media content, visit our interactive
investor website at: https://variscan.com.au/s/aa7e61
This ASX announcement has been approved by the Board and authorised for issue by Tony Wehby, Chairman,
Variscan Mines Limited
For further information, please contact:
Variscan Mines Limited (ASX:VAR)
Tony Wehby
Chairman
E: info@variscan.com.au
Media & Investor Enquiries
Jane Morgan Management
Chloe Hayes
E: chloe@janemorganmanagement.com.au
P: +61 (0) 405 555 618
2
About Variscan Mines Limited (ASX:VAR)
To learn more, please visit: www.variscan.com.au
For more information
Follow us on LinkedIn
Follow us on Twitter
Visit our investor website: www.variscan.com.au
We encourage all investors to share questions on this announcement via our interactive
investor hub: https://variscan.com.au/announcements
Or scan the QR code.
Subscribe to our news alert service: https://variscan.com.au/s/8d46e7
3
Novales-Udias Project Summary
The Novales-Udias Project is located in the Basque-Cantabrian Basin, some 30km southwest from the regional
capital, Santander. The project is centred around the former producing San Jose underground mine with a large
surrounding area of exploration opportunities which include a number of satellite underground and surface
workings and areas of zinc anomalism identified from recent and historic geochemical surveys. Variscan has
delineated a significant 9km mineralised trend and a sub-parallel 3km trend from contemporary and historical
data across both the Buenahora exploration and Novales mining permits.
The San Jose Mine is nearby (~9km) to the world class Reocin Mine which is the largest known strata-bound
carbonate-hosted Zn-Pb deposit in Spain1
and one of the world’s richest MVT deposits2
. Further it is within
trucking distance (~80km) from the San Juan de Nieva zinc smelter operated by Asturiana de Zinc (100% owned
by Glencore). Significantly, the Novales-Udias Project includes a number of granted mining tenements3.
Map of Novales-Udias Project Licence Areas and local infrastructure
1
Velasco, F., Herrero, J.M., Yusta, I., Alonso, J.A., Seebold, I. and Leach, D., (2003) ‘Geology and Geochemistry of the Reocin
Zinc-Lead Deposit, Basque-Cantabrian Basin, Northern Spain’ Econ. Geol. v.98, pp. 1371-1396.
2
Leach, D.L., Sangster, D.F., Kelley, K.D., Large, R.R., Garven, G., Allen, C.R., Gutzner, J., Walters, S., (2005) ‘Sediment-
hosted lead-zinc deposits: a global perspective’. Econ. Geol. 100th Anniversary Special Paper 561 607
3
Refer to ASX announcement of 29 July 2019
4
Mineral Resource Estimate for Novales-Udias Project
JORC Mineral Resource Estimate for San Jose Mine and north-eastern Udías by deposit and
classification reported above at 2% Zn+Pb cut-off (ASX announcement 9 December 2024)
Competent Person Statement
The information in this document that relates to Exploration Results and Mineral Resource Estimates for the
Novales-Udias project is based on and fairly represents information and supporting documentation compiled and
reviewed by Dr. Mike Mlynarczyk, Principal of the Redstone Exploration Services, a geological consultancy acting
as an external consultant for Variscan Mines. Dr. Mlynarczyk is a Professional Geologist (PGeo) of the Institute of
Geologists of Ireland, and European Geologist (EurGeol) of the European Federation of Geologists, as well as
Fellow of the Society of Economic Geologists (SEG). With over 14 years of full-time exploration experience in MVT-
style zinc-lead systems in several of the world’s leading MVT provinces, Dr. Mlynarczyk has sufficient experience
which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as defined in the December 2012 edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (‘JORC Code’). Dr. Mlynarczyk
consents to the inclusion in the report of the matters based upon the information in the form and context in which
it appears.
Share your feedback
Discover