ASX Announcement | 30 April 2026
Variscan Mines Limited (ASX:VAR)
QUARTERLY ACTIVITIES REPORT
For the period ending 31 March 2026
Highlights
Novales-Udías Project
• San José Mine Re-Start Study delivers economically robust ‘starter operation’ with
potential for 11-year mine life.
• Strong financial metrics highlight pathway to near-term production and cashflow
generation.
• Low pre-production capital (~A$33M) leveraging existing underground development
(~1.6km), reducing cost and timeline to production.
• Only ~50% of current Mineral Resource utilised in Study, highlighting significant scale-up
potential across the broader system.
• First concentrate production targeted for 2028, subject to funding, permitting and early
works execution.
• Funding strategy progressing with focus on non-dilutive structures (debt, royalty,
streaming, offtake).
• Underground drilling at Udías continues to target extensions beyond current MRE and
along strike toward San José.
• Explorer-Producer strategy advancing with parallel development and resource growth.
Corporate
• Binding term sheet signed for A$1 million Convertible Loan Note Facility to support
exploration and development of Novales-Udías Zinc Project.
• Board and management transition initiated to support next phase of development and
project execution.
• Irish zinc earn-inprocess remains under negotiation, with revised timing being progressed.
• 49% interest retained in Callabonna Project with Chalice Mining earning into Red Metal’s
interest.
2
IMPORTANT NOTICE / CAUTIONARY STATEMENT
The Mine ReStart Study (“Study”) referred to in this Quarterly Report (see ASX release 25 March 2026)
has been undertaken to determine the viability of recommencing underground mining at Variscan’s San
José Mine in Cantabria, northern Spain. The San José Mine forms a central part of the wider Novales-
Udias Project (the “Project”).
The Study has been produced to Scoping Study level, as defined in Clause 38 of the JORC Code (2012).
It is a preliminary technical and economic assessment of the potential viability of the San José Mine to
+/- 35% accuracy. It is based on low level technical and economic assessments that are not sufficient
to support the estimation of Ore Reserves. The Study includes existing JORC 2012 Code Measured,
Indicated and Inferred Mineral Resources defined with the San José Mine, with a production target
derived from contained metal in the following categories:Measured (28%), Indicated (37%) and Inferred
Mineral Resources (35%) over the Life of Mine. Investors are cautioned that there is a low level of
geological confidence in Inferred Mineral Resources and there is no certainty that further drilling will
result in the determination of Measured or Indicated Mineral Resources or that the production target
will be realized. In the first 3 years of operation, the majority of Mineral Resources scheduled for
extraction are Measured and Indicated, which supports the base case Payback Period of 3.8 years (3.2
years at current prices) and achieving positive cashflow generation within 2.1 years (1.6 years at current
prices).
The Study is based on material assumptions outlined in this announcement, including assumptions
about the availability of funding in the order of approximately €19m (A$33m). Investors should note that
there is no certainty that Variscan will be able to raise the required amount of funding when needed.
While Variscan considers all of the material assumptions to be based on reasonable economic
grounds, there is no certainty that they will prove to be correct or that that outcomes indicated by the
Study will be achieved.
Variscan has concluded it has reasonable basis for providing the production target and forecast
financial information included in this announcement.
The Mineral Resources underpinning the production targets in this announcement were announced in
the Mineral Resource Estimate (‘MRE’) published in December 2024 and have been prepared by a
Competent Person in accordance with the requirements of the JORC Code 2012 Edition.
Given the uncertainties involved, investors should not make any investment decisions based solely on
the results of the Scoping Study.
3
Variscan Mines Limited (ASX:VAR) (“Variscan” or the “Company”) is pleased to provide
shareholders and investors with an operations overview to accompany the Appendix 5B for the quarter
ending 31 March 2026 (“Quarter” or the “Reporting Period”).
During the Quarter, the Company transitioned from advanced study phase to development planning
following completion of the San José Mine Re-Start Study, which demonstrated a technically robust and
economically attractive pathway to recommence production at the San José Mine. The Study outlined
a low-capital, staged ‘starter operation’ leveraging existing underground infrastructure, with strong
financial returns and a clear pathway to near-term cashflow generation, while utilising only a portion of
the current Mineral Resource and highlighting significant scale-up potential across the broader
Novales–Udías system. The Study positions Variscan as a near-term zinc restart opportunity in a proven
European mining district. In parallel, underground drilling at the Udías Mine continued to target
extensions to mineralisation outside the current MRE and along strike toward San José, reinforcing the
interpretation of a large, continuous mineralised system and supporting ongoing resource growth.
Furthermore, the Company announced that Red Metal Limited has entered into an earn-in agreement
with Chalice Mining Limited in relation to Red Metal’s majority (51%) interest in the Callabonna Project,
in which Variscan retains its 49% interest.
Variscan’s Executive Director, Tom Kent said:
“The March Quarter represents a defining period for Variscan with the delivery of the San José Mine Re-
Start Study, confirming a technically robust and economically attractive pathway to production. The
study outlines a pragmatic, low-capital ‘starter operation’ leveraging existing infrastructure, providing a
platform for near-term cashflow generation and future scale-up across the broader Novales-Udías
system.
Importantly, only a portion of the current Mineral Resource underpins the Study, highlighting the
significant growth potential through ongoing underground exploration at Udías and across the wider
project.
With a clear development pathway now established, Variscan is focused on continuing to grow the
resource base as we transition toward becoming a zinc producer.”
Novales-Udías Project
San José Mine
During the Quarter,Variscan announced the results of its San José Mine Re-Start Study (see ASX release
dated 25 March 2026), representing a key inflection point in advancing the Company’s Explorer-
Producer strategy and transitioning the Novales-Udías Project toward development.
The Study demonstrates the technical and economic viability of recommencing zinc and lead
production via a staged, capital-efficient ‘starter operation’, leveraging the inherent advantages of the
existing underground development and site infrastructure. The proposed development strategy adopts
4
a pragmatic, low-capex approach focused on achieving early production and cashflow generation,
while providing a platform for future growth and scale-up across the broader Novales-Udías Project.
Key Outcomes Include:
• 11-year initial mine life based on existing Mineral Resources.
• Strong financial returns, with strong IRR and rapid payback period (~3.8 years; ~3.2 years at
current prices).
• Strong free cashflow generation, estimated at ~€53M (A$93M) post-tax, increasing to ~€75M
(A$131M) at current prices.
• NPV₅ (post-tax) of ~€38M (A$67M), increasing to ~€55M (A$96M) at current prices.
• Low pre-production capital cost (~€19M / A$33M), reflecting the advantages of existing
underground development.
• Reduced pre-production timeframe (~2.5 years), leveraging ~1.6km of existing mine
development.
• Low sustaining capital expenditure and low capital intensity, consistent with a brownfield
restart strategy.
• Low operating costs, with total cash costs of ~€63/t (A$110/t).
• Early cashflow generation, with positive cashflow expected within ~2.1 years (or ~1.6 years at
current prices).
• Only ~50% of the Mineral Resource utilised in the Study, highlighting significant potential for
future scale-up and mine life extension.
• Modular ‘starter operation’ design, providing a platform for future production growth.
• Leverages existing site infrastructure and approvals, supporting a pragmatic, low-capex
pathway to production.
• Cashflowexpected to support Mineral Resource growth,production ramp-upandbroader asset
portfolio development.
The Study outlines a clear pathway toward production, with first concentrate targeted for 2028 (subject
to funding, permitting and completion of early works). Refer ASX release 25 March 2026 for further
detail.
In parallel, Variscan has appointed Square Resources as its marketing manager and expects to
commence concentrate marketing outreach, supporting future offtake and commercialisation
pathways.
The proposed ‘starter operation’ is designed to generate early free cashflow which is expected to
support:
• Ongoing Mineral Resource growth through continued exploration
• Progressive production ramp-up
• Advancement of the wider Novales-Udías Project and asset portfolio
Importantly, the Study highlights the opportunity to scale operations over time, including potential
integration of the adjacent Udías Mine and further development of the broader project area. Following
completion of the Study, the Company is focused on advancing funding discussions, prioritising non-
dilutive financing options, while progressing early works planning and permitting pathways required to
support a Final Investment Decision (FID).
5
The delivery of the San José Mine Re-Start Study represents a significant step toward transitioning
Variscan from an explorer to a producer, while maintaining exposure to substantial exploration and
development upside across the Project.
Udías Mine
Underground diamond drilling recommenced at theUdías Mine during the Quarter,targeting extensions
to known mineralisation and testing new zones along strike toward the San José Mine as part of the
broader Novales–Udías system (see ASX release dated 21 January 2026).
Drilling was undertaken along existing underground development, with a focus on systematically
advancing into previously untested zones and progressing toward linking mineralisation at Udías with
the San José Mine in Novales. All drilling completed to date remains outside the current Mineral
Resource Estimate (MRE), reinforcing the potential for continued resource growth and highlighting the
scale of under-explored mineralisation within the Udías Mine complex (See Figures 1 and 2).
During the Quarter, the Company continued to refine drill targeting through the integration of historical
drilling data, face sampling and 3D mine modelling, together with its recent drilling results. This work is
supporting an improved understanding of the geometry and continuity of mineralisation and is being
used to delineate priority target zones along the existing mine development.
Results to date continue to demonstrate strong geological similarity between mineralisation at Udías
and the adjacent San José Mine, indicating both form part of the same continuous mineral system. The
Udías Mine hosts a large footprint of under-explored underground workings, with mineralisation
interpreted to extend beyond the current geological and MRE model and remain open along strike and
at depth.
These outcomes further support the Company’s strategy of progressing exploration in parallel with
development, with ongoing underground drilling expected to contribute to Mineral Resource growth,
extend mine life and support future production scale-up across the Novales–Udías Project.
Figure 1. Orthographic view of the Udías Mine showing current drill collars, 2025 reported results and planned
targets to link mineral resources in the north-east of the mine with the San José Mine.
6
Figure 2. Plan view of the southern part of the Udías Mine indicating areas of current drilling locations, drilling
results reported in 2025, mine development, and future drilling targets to link with zones of current mineral
resources in north-eastern part of the Udías Mine and beyond to the San José Mine
Corporate & Financial
During the quarter, Variscan implemented changes to its Board and executive leadership to support the
next phase of its development. Mr Vaughan (Tom) Kent, who was appointed to the Board as a Non-
Executive Director during 2025, has transitioned to Executive Director as part of a broader leadership
transition aligned with advancing the Company toward development and production. Mr Nicholas Farr-
Jones resigned as a Non-Executive Director during the Quarter, having made a valuable contribution to
the Company since his appointment. In addition, Mr Stewart Dickson resigned as Managing Director
7
and CEO and will step down from the Board, providing a structured transition period as Acting CEO for
up to six months. The Board has commenced an executive search process to identify a new CEO to lead
the Company’s next phase of growth following completion of the San José Mine Re-Start Study.
Furthermore, Variscan maintained its 49% interest in Exploration Licence EL6318 at the Callabonna
Project, following the execution of an earn-in agreement between Red Metal Limited (ASX: RDM) and
Chalice Mining Limited. Under the proposed arrangement, Chalice may earn into Red Metal’s interest
through exploration expenditure, including a minimum commitment of basement drilling within the first
12 months. Variscan’s interest and rights under the existing agreement remain unchanged, with
Chalice’s involvement expected to accelerate exploration activities targeting large-scale IOCG
mineralisation.
During the Quarter, the proposed Earn-In and Joint Venture Agreement ("Definitive Agreement") with
MDF Global Limited ("MDF"), Zinc GroupCo Pty Ltd ("ZincCo") (together, the "Vendors") and BMex Pty
Ltd ("BMex") over the Midlands and Waterford zinc projects in Ireland was not executed as certain
conditions precedent, including a subscription by ZincCo were not satisfied within the prescribed
timeframe and therefore the Definitive Agreement was not executed. The Company is seeking to
negotiate a revised date by which the conditions precedent to execution of the Definitive Agreement
may be satisfied with the Vendors and BMex.
Financial liquidity
In addition to cash at bank, the Company has recently entered into a binding term sheet for an
unsecured, A$1 million convertible loan note facility (the “Facility”) to support the exploration and
development of its 100% owned Novales-Udías Zinc Project in Cantabria, northern Spain.
The Facility is being provided by a small syndicate of professional and sophisticated mining sector
focused investors who are supportive of the Company’s development plans and progression towards
recommencing production at the San José Mine
The key terms of the Facility are set out the Company’s ASX announcement of 30 January 2026.
Summary of Expenditure on Exploration Activities
For the Quarter, the Group spent $311,000 on exploration activities, substantively all of which related
to the Group’s Spanish zinc projects. These exploration activities related to:
• Underground drilling;
• Geological modelling;
• Technical consulting fees;
• Tenement administration, reporting and management; and
• Directly-attributable corporate overheads and administration costs.
In accordance with ASX Listing Rule 5.3.2, the Company advises that no Mining Development or
Production activities were conducted during the quarter.
8
Deferred Settlement Shares
In accordance with the acquisition agreements, the Company must issue additional shares upon the
satisfaction of certain exploration milestones. These milestones are for the definition, in accordance
with JORC 2012, of an Inferred Mineral Resource (or greater) of:
• Milestone 1: 4 million tonnes at 7% Zn
• Milestone 2: 8 million tonnes at 7% Zn
Upon satisfaction of each of these milestones, the Company must issue 27,500,000 ordinary shares to
the vendors of Slipstream Spain Pty Ltd and Slipstream Spain 2 Pty Ltd, and 2,426,471 shares to
Hispanibal S.L. as the vendor of the “Hispanibal Option”, for a total of 59,852,941 Ordinary Shares if
both milestones are met. Pursuant to the Hispanibal Option being settled, a deferred cash payment of
€200,000 is payable upon the publication of a JORC compliant mineral resource. This is expected to be
payable upon achievement of Milestone 1 as set out above.
As at the date of this report neither of these milestones have been reached.
Other
During the quarter, the Company made payments to related parties of $47,000 represented by
remuneration paid to Directors.
ENDS
This ASX announcement has been approved by the Board and authorised for issue by the Board, Variscan Mines
Limited
For further information, please contact:
Variscan Mines Limited (ASX:VAR)
Tom Kent
Executive Director
E: info@variscanmines.com
Media & Investor Enquiries
Jane Morgan Management
Chloe Hayes
E: chloe@janemorganmanagement.com.au
P: + 61 (0) 458 619317
9
About Variscan Mines Limited (ASX:VAR)
For more information
Follow us on LinkedIn
Follow us on Twitter
Visit our investor website: www.variscan.com.au
We encourage all investors to share questions on this announcement via our interactive
investor hub: https://variscan.com.au/announcements
Or scan the QR code.
Subscribe to our news alert service: https://variscan.com.au/s/8d46e7
10
Novales- Udías Project Summary
The Novales-Udías Project is an advanced zinc-lead project located in the Basque-Cantabrian Basin,
approximately 30km southwest of the regional capital, Santander. The Project is centred around the
former producing San José and Udías underground mines and encompasses a large, de-risked, district-
scale exploration and development area. This includes a number of satellite underground and surface
workings and areas of zinc anomalism. Variscan has delineated a significant ~12km mineralised
Novales Trend, the majority of which is covered by valid, granted mining tenements.
The San José Mine is located approximately 9km from the world-class Reocín Mine, the largest known
strata-bound carbonate-hosted Zn-Pb deposit in Spain and one of the world’s richest MVT deposits.
The Project is within trucking distance (~80km) of the San Juan de Nieva zinc smelter operated by
Asturiana de Zinc (a subsidiary of Glencore).
Novales- Udías Project Highlights
• Near-term zinc production opportunity, underpinned by completion of the San José Mine Re-
Start Study and progression toward development
• JORC compliant Mineral Resource Estimate of 3.4Mt @ 7.6% Zn, 0.9% Pb (December 2024)
• Expanded tenement holding of 111 km2
(including a number of granted mining tenements)
• Regional exploration potential for another discovery analogous to Reocín Mine (total past
production and remaining resource 62Mt @ 8.7% Zn and 1.0% Pb1 2
)
• Trucking distance (~ 80km) from the San Juan de Nieva smelter (Glencore owned)
• Classic MVT carbonate hosted Zn-Pb district
• Historic production of high-grade zinc from San José Mine; average grade reported as ~7% Zn3
with super high grade ‘bolsas’ (mineralised pods and lenses) commonly 10-20% Zn and in some
instances +30% Zn4
• Maiden drilling at Udías Mine
• Simple mineralogy of sphalerite – galena – calamine
• Mineralisation is strata-bound, epigenetic, lenticular and sub-horizontal
• Access and infrastructure all in place
• Local community and government support due to historic mining activity
1
Velasco, F., Herrero, J.M., Yusta, I., Alonso, J.A., Seebold, I. and Leach, D., 2003 - Geology and Geochemistry of the Reocín Zinc-Lead
Deposit, Basque-Cantabrian Basin, Northern Spain: in Econ. Geol. v.98, pp. 1371-1396.
2
Cautionary Statement: references in this announcement to the publicly quoted resource tonnes and grade of the Project are historical and
foreign in nature and not reported in accordance with the JORC Code 2012, or the categories of mineralisation as defined in the JORC Code
2012. A competent person has not completed sufficient work to classify the resource estimate as mineral resources or ore reserves in
accordance with the JORC Code 2012. It is uncertain that following evaluation and/or further exploration work that the foreign/historic
resource estimates of mineralisation will be able to be reported as mineral resources or ore reserves in accordance with the JORC Code
2012.
3
These figures have been taken from historical production data from the School of Mines in Torrelavega historical archives.
4
Reports of the super high-grade mineralisation are supported with historical production data from the School of Mines in Torrelavega
historical archives. (Refer ASX release 29 July 2019)
11
Mineral Resource Estimate for Novales-Udías Project
JORC Mineral Resource Estimate for San José Mine and north-eastern Udías by deposit and
classification reported above at 2% Zn+Pb cut-off (ASX announcement 9 December 2024)
Competent Person Statement
The information in this document that relates to exploration results and technical information about the Novales-Udías project
is based on, and fairly represents information and supporting documentation compiled and reviewed by Dr. Mike Mlynarczyk,
Principal of the Redstone Exploration Services, a geological consultancy acting as an external consultant for Variscan Mines.
Dr. Mlynarczyk is a Professional Geologist (PGeo) of the Institute of Geologists of Ireland, and European Geologist (EurGeol) of
the European Federation of Geologists, as well as Fellow of the Society of Economic Geologists (SEG). With over 14 years of
full-time exploration experience in MVT-style zinc-lead systems in several of the world’s leading MVT provinces, Dr. Mlynarczyk
has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person as defined in the December 2012 edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (‘JORC Code’). Dr. Mlynarczyk consents to
the inclusion in the report of the matters based upon the information in the form and context in which it appears.
Where reference is made to previous releases of exploration results and mineral resource estimates and including the results
of the Mine Re-start Study released on 25 March 2026, in this announcement, the Company confirms that it is not aware of any
new information or data that materially affects the information included in those announcements and all material
assumptions and technical parameters underpinning the exploration results and mineral resource estimates included in those
announcements continue to apply and have not materially changed.
The information in this document that relates to previous exploration results was prepared pre-2012 JORC code. It is the
opinion of Variscan that the exploration data is reliable. Although some of the data is incomplete, nothing has come to the
attention of Variscan that causes it to question the accuracy or reliability of the historic exploration.
Forward Looking Statements
Forward-looking statements are only predictions and are not guaranteed. They are subject to known and unknown risks,
uncertainties and assumptions, some of which are outside the control of the Company. Past performance is not necessarily a
guide to future performance and no representation or warranty is made as to the likelihood of achievement or reasonableness
of any forward-looking statements or other forecast. The occurrence of events in the future are subject to risks, uncertainties
and other factors that may cause the Company’s actual results, performance or achievements to differ from those referred to
in this announcement. Given these uncertainties, recipients are cautioned not to place reliance on forward looking
statements. Any forward-looking statements in this announcement speak only at the date of issue of this announcement.
Subject to any continuing obligations under applicable law and the ASX Listing Rules, the Company, its directors, officers,
employees and agents do not give any assurance or guarantee that the occurrence of the events referred to in this
announcement will occur as contemplated.
12
LISTING OF TENEMENTS HELD AT 31 MARCH 2026
Tenement Tenement No. Interest Joint Venture Details
SPAIN
Cantabria
Buenahora Fraction 1
Buenahora Fraction 2
San José
La Torra
Tres Amigos
Torpeza
Andrea
Andrea-demasía a
Es
Dudosa
Cargadoiro
Tres amigos-demasía a
Flor del pueblo
Torpeza-demasía a
Torpeza-3ª demasía a
Torpeza-2ª demasía a
Flor del pueblo-demasía a
Dudosa-demasía a
Andrea-3ª demasía a
Andrea-2ª demasía a
Cargadoiro-demasía a
Ampliación a Matilde
Aumentada
Campitos
Campitos-demasía a
Carmenchu
Amelita
Eloísa
Ampliación a Matilde-demasía a
Cargadoiro 2
Amelita-demasía a
Carmenchu-demasía a
Eloísa-demasía a
Carmenchu-2ª demasía a
6º Aumento a porvenir
Ampliación a Matilde-demasía a
Campitos-segunda demasía a
Cargadoiro 2- demasía a
Carmenchu-tercera demasía a
6º Aumento a porvenir-demasía a
Torpeza-tercera demasía a
Esperanza
IP 16.662-01
IP 16.662-02
EC 94
EC 512
EC 1565
EC 2557
EC5220
EC5374
EC8049
EC8165
EC11589
EC11594
EC12942
EC12952
EC13079
EC13080
EC13154
EC13170
EC13175
EC13176
EC13260
EC13641
EC14238
EC14554
EC14640
EC14945
EC14949
EC14947
EC14948
EC14954
EC14979
EC14980
EC14981
EC14982
EC15672
EC13641-10
EC14554-20
EC14954-10
EC14980-30
EC15672-10
EC2557-30
IP 16674
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
13
Tenement Tenement No. Interest Joint Venture Details
Estela
Elena
Candela
Valeria
Hipolita (Reocin)
Ana Isabel
Toledo
Guajaraz
IP 16672
IP 16673
IP 16676
IP 16675
IP 16680
IP 16679
IP 4.203
100%
100%
100%
100%
100%
100%
100%
NEW SOUTH WALES
Willyama EL 8075 0% Note 1
Hillston EL 6363 39.2% Perilya can earn 80%, Eaglehawk
9.8%
Native Dog EL 8236 0% Note 1
Woodlawn South ELs 7257 and 7469 0% Royalty interest only
SOUTH AUSTRALIA
Junction Dam EL 5682 0% Marmota acquired 100% ownership.
See Note 2
Callabonna EL 5360 49% Red Metal 51%, can earn 70% - Note
3
EL = Exploration License
PER = Permis Exclusif de Recherche (France)
IP = Investigation Permit (Spain)
EC = Exploration Concession (Spain)
Note 1: Under an agreement with Silver City Minerals Limited, Broken Hill Operations and Eaglehawk
Geological Consulting Pty Ltd Variscan has converted its interest in parts of these tenements to a
NSR (Net Smelter Return).
Note 2: Marmota has earned 100% of the uranium rights only in EL 5682. Variscan has a 0.5% net profits
royalty on production from a uranium mine.
Note 3: Chalice Mines Limited is currently earning into Red Metal’s interest in the Callabonna project.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Variscan Mines Limited
ABN Quarter ended (“current quarter”)
16 003 254 395 31 March 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (36) (202)
(e) administration and corporate costs
(including one-off legal and other
associated costs)
(66) (458)
1.3 Dividends received (see note 3) - -
1.4 Interest received - -
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material) - -
- Costs related to proposed
acquisition of Irish Zinc Projects
- (112)
1.9 Net cash from / (used in) operating
activities
(102) (772)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) exploration & evaluation (311) (1,309)
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
(e) investments - -
(f) other non-current assets - -
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(311) (1,309)
3. Cash flows from financing activities
- 2,000
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities - -
3.3 Proceeds from exercise of options 6 6
3.4 Transaction costs related to issues of equity
securities or convertible debt securities - (149)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings - -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing
activities 6 1,857
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period 634 452
4.2 Net cash from / (used in) operating
activities (item 1.9 above) (102) (772)
4.3 Net cash from / (used in) investing activities
(item 2.6 above) (311) (1,309)
Appendix 5B
Mining explorati
Share your feedback
Discover