ASX Announcement | 31 October 2024
Variscan Mines Limited (ASX:VAR)
2024 Annual Report
Variscan Mines Limited (“Variscan” or the “Company”) encloses its annual report for the year ended 30 June
2024.
This announcement has been approved for release by Mr Mark Pitts, Company Secretary, Variscan Mines Limited.
For further information, please contact:
Variscan Mines Limited (ASX:VAR)
Stewart Dickson
Managing Director & CEO
E: stewart.dickson@variscan.com.au
T: +44 (0) 7799 694195
Media & Investor Enquiries
The Capital Network
Julia Maguire
E: julia@thecapitalnetwork.com.au
P: +61 2 8999 3699
About Variscan Mines Limited (ASX:VAR)
Variscan Mines Limited (ASX:VAR) is a growth oriented, natural resources company focused on the acquisition,
exploration and development of high-quality strategic mineral projects. The Company has compiled a portfolio of highimpact base-metal interests in Spain, Chile and Australia. Its primary focus is the development of its advanced zinc projects
in Spain. The Company’s name is derived from the Variscan orogeny, which was a geologic mountain building event caused
by Late Paleozoic continental collision between Euramerica (Laurussia) and Gondwana to form the supercontinent of
Pangea.
To learn more, please visit: www.variscan.com.au
For more information
Follow us on LinkedIn
Follow us on X (formerly Twitter)
Visit our investor website: www.variscan.com.au
ANNUAL
REPORT
2024
Corporate Directory
ABN
REGISTERED OFFICE
87 095 092 158
5/191 St Georges Terrace
Perth, Western Australia
Australia
Telephone: +61 419 700 493
Email: info@variscan.com.au
Website: www.variscan.com.au
DIRECTORS
Mr Anthony Wehby
Non-Executive Chairman
Mr Stewart Dickson
Managing Director & CEO
Mr Nicholas Farr-Jones AM
Non-Executive Director
Dr Frank Bierlein
Non-Executive Director
COMPANY SECRETARY
Mr Mark Pitts
SHARE REGISTRY
Boardroom Pty Ltd
GPO Box 3993
Sydney NSW 2001
Australia
Telephone: +61 2 9290 9600
AUDITORS
HLB Mann Judd
Level 4, 130 Stirling Street
Perth WA 6000
Australia
Telephone: +61 8 9227 7500
SECURITIES EXCHANGE LISTING
Variscan Mines Limited’s shares are listed on
the Australian Securities Exchange (ASX: VAR)
2
VARISCAN MINES
ANNUAL REPORT 2024
Contents
Contents
Corporate Directory
2
Chairman’s Letter
4
Operational Review
6
Annual Mineral Resource Statement
25
Competant Persons Statements
26
Directors’ Report
28
Auditor’s Independence Declaration
44
Consolidated Statement of Profit or Loss and Other Comprehensive Income
45
Consolidated Statement of Financial Position
46
Consolidated Statement Of Cash Flows
47
Consolidated Statement Of Changes In Equity
48
Notes To The Consolidated Financial Statements
49
Consolidated Entity Disclosure Statement
73
Directors’ Declaration
74
Independent Auditor’s Report
76
ASX Additional Information
80
VARISCAN MINES
ANNUAL REPORT 2024
3
Chairman’s Letter
Chairman’s
Letter
We are proud of the significant progress made in executing our exploration
and development plans for our flagship Novales-Udias Zinc Project in
northern Spain during the year ended 30 June 2024 (FY24).
This period notably saw the issue of an initial high-grade Mineral
are immediately adjacent to the existing San Jose and Buenahora
Resource Estimate and secured a new lease agreement over the
tenements and contain attractive exploration targets.
San Jose mine site and facilities. All of which supports and aligns
with our rapidly evolving mine re-start strategy over the NovalesUdias Project.
While successfully executing on our plans to grow the scale of the
Project we at the same time met another objective, which was
the extend the lease on the San Jose Mine site and facilities. This
In addition, our exploration activities, led by a successful
lease extension, done at a competitive, commercial rate in line
underground drilling campaign, have yielded very exciting results.
with prevailing local norms for industrial sites, is a key enabler
Further, we significantly increased the size of the Novales-Udias
to support Variscan’s current activities and future objective
Project, via the addition of several new licence areas.
mine re-start.
We continue to generate momentum and I am pleased to say that
Late in FY24 and early in FY25 the Company undertook two
further key project development milestones have been realised
funding initiatives. The first was a small interim placement
in the early part of FY25.
which was followed by a Fully Underwritten Renounceable
On behalf of the Board of Directors of Variscan Mines, I am
Rights Issue to raise approximately $2m. These raisings saw
pleased to report on our achievements during the financial year
ended 30 June 2024 (FY24). During this year we made significant
progress towards bringing the Novales-Udias Zinc Project back
strong support from our largest shareholder and also attracted
some new sophisticated investors with experience in the natural
resources sector. At the time of writing, I am pleased to note the
into production.
early positive response of shareholders to this Rights Issue.
Midway through FY24, Variscan announced its maiden JORC
Looking ahead, it is apparent that FY25 will be a transformational
Mineral Resource Estimate (MRE) for the historically producing
San Jose Mine that lies within the Novales-Udias Project. The
Operational Review that immediately follows this Letter will
discuss the makeup of this MRE in more detail. A key take-away
year for your Company. Completion of the Rights Issue will provide
funds and impetus to accelerate project activities. Deliverables
set to be released in the near future include an updated Mineral
Resource Estimate and a Mine Re-Start Study. We are hopeful
from this initial estimate is that San Jose hosts of one of the
that both will be well received by investors and the wider market.
highest grade zinc mineral resources currently held by an ASX-
In closing, I would like to express my thanks to both our
listed company.
management team and staff for their unwavering commitment
The Operational Review also provides shareholders with detail on
the exploration successes and associated development activities
undertaken during the year. These activities included successful
underground drilling campaigns in the San Jose Mine, and a
structural geological assessment over the linked San Jose and
Udias Mines. The positive results of the drilling and study work
have given us confidence that the mineral resources contained in
our Novales-Udias asset have significant growth potential. Your
over the past year. I also want to show my appreciation to local
communities and regional authorities with whom we work, the
Government of Cantabria included, for their ongoing support,. I
also express my appreciation to our loyal shareholders for their
support during FY24 when the share price has not reflected the
achievements of the Company. Like all junior mining companies,
we have faced tough market conditions. We are well positioned
to capitalize on the substantial progress made to date and look
Board have undertaken to report an updated MRE by the close of
forward to delivering development milestones.
calendar year 2024.
Yours sincerely
Another significant development during FY24 was the realization
of our growth ambitions by substantially upsize the Project’s land
area. In April 2024, Variscan was conditionally awarded five new
exploration licences, comprising 36.66km2 in aggregate, by the
Government of Cantabria. These new licences, which boost the
Anthony Wehby
land package of Variscan’s Novales-Udias Project by around 70%,
Non-executive Chair
4
VARISCAN MINES
ANNUAL REPORT 2024
VARISCAN MINES
ANNUAL REPORT 2024
5
Operational Review
Operational
Review
f Group Highlights – Year in Review
Variscan has made great strides in executing its development plan for the
Company’s exciting Novales-Udias Zinc Project in northern Spain over the
course of the financial year ended 30 June 2024 (FY24).
All of our exploration and development activities show demonstrable progress as we continue to advance one of the highest-grade
zinc deposits in Europe towards re-starting production.
FY24 Highlights
▯
Delivery of an initial maiden high-grade Mineral Resource Estimate
▯
Reporting multiple sets of positive drilling results from a successful, extended, infill and expansion
underground drilling campaign defining new zones of high-grade mineralisation
▯
Comprehensive geological assessment and structural targeting study completed by world-renowned
expert, Dr. Brett Davis
▯
70% expansion of the tenure area to +100km2 via the addition of five new licences → new target areas with
the potential to increase project scale
▯
New Lease Agreement over the San Jose Mine site and facilities secured
Post Period Achievements
▯
Marketing Agreement executed with Square Resources
▯
Newly compiled, assays from historic underground face-sampling and drilling results at the Udias
Mine show very high-grade zinc-lead results, confirming mineralization outside of the current Mineral
Resource Estimate footprint
▯
Launched fully underwritten Rights Issue to raise ~$2.067m with significant support from Variscan’s
major shareholder and attracting new sophisticated and professional investors
Future Milestones & Activities in FY25
6
▯
Maiden underground drilling campaign at Udias Mine
▯
Updated Mineral Resources Estimate
▯
Publication of Mine Re-Start Study
▯
Evaluation of additional assets
VARISCAN MINES
ANNUAL REPORT 2024
Operational Review
f Spain
Variscan holds two very attractive zinc-rich, proven producing assets in Spain.
Figure 1. Variscan’s Spanish Zinc Projects
Novales-Udias Project
Variscan Mines’ FY24 exploration and development activities were again focussed on the Company’s flagship Novales-Udias
Project, located in the Basque-Cantabrian Basin approximately 30km from the regional capital, Santander in northern Spain.
Our work has significantly advanced the project and builds on the compound progress made over preceding years. The results from
our exploration activities, especially drilling, and study work, notably the initial Mineral Resource Estimate and structural geology
review, have reinforced our confident view that Novales-Udias Project has a realistic prospect of recommencing mining once again.
This remains our primary focus and our future work plans align to deliver one of the highest-grade, development stage zinc deposits
in Europe towards re-starting production.
Key advantages and attributes of the Novales-Udias Project.
▯
A near term zinc production opportunity (subject to further positive exploration and development work)
▯
A maiden JORC compliant Mineral Resource Estimate of 1.08 Mt at 9% Zn defined in FY24
▯
A large tenement holding of +100 km2 (including a number of granted mining tenements)
▯
Regional exploration potential for further discoveries analogous to Reocin (total past production and
remaining resource 62Mt @ 8.7% Zn and 1.0% Pb) 1,2
VARISCAN MINES
ANNUAL REPORT 2024
7
Operational Review
▯
Novales Mine is within trucking distance (~ 80km) from the zinc smelter in Asturias
▯
Classic MVT carbonate hosted zinc-lead deposits
▯
Historic production of high-grade zinc; average grade reported as ~7% Zn3
▯
Simple mineralogy of sphalerite-galena-calamine
▯
Mineralisation is strata-bound, epigenetic, lenticular and sub-horizontal
▯
Reported historic production of super high grade ‘bolsas’ (mineralised pods and lenses) commonly 10-20%
Zn and in some instances +30% Zn
▯
Assay results of targeted grab samples taken from within the underground Novales Mine recorded 31.83%
Zn and 62.3% Pb4
▯
Access and infrastructure all in place
▯
Local community and government support due to historic mining activity
Note: (1) Velasco, F., Herrero, J.M., Yusta, I., Alonso, J.A., Seebold, I. and Leach, D., 2003 - Geology and Geochemistry of the Reocin Zinc
Note: (2) Cautionary statement: references in this report to the publicly stated resource tonnes and grade of the Project (Reocin)
are historical and foreign in nature and not reported in accordance with the JORC Code 2012, or the categories of
mineralisation as defined in the JORC Code 2012. A competent person has not completed sufficient work to classify the
resource estimate as mineral resources or ore reserves in accordance with the JORC Code 2012. It is uncertain that
following evaluation and/or further exploration work that following evaluation and/or further exploration work that the
foreign/historic resource estimates of mineralisation will be able to be reported as mineral resources or ore reserves in
accordance with the JORC Code 2012.
Note: (3) These figures have been taken from historical production data from the School of Mines in Torrelavega historical archives
Note: (4) Refer to ASX announcement dated 19 December 2019
Award of new licences substantially increases size of the Novales-Udias Project
In early April 2024, Variscan’s Novales-Udias Project was significantly increased, after the Company was conditionally awarded
five new exploration licences, comprising 36.66km2 in aggregate, by the Government of Cantabria (see ASX announcement dated
8 April 2024).
Figure 2. Map of enlarged licence areas and extension of Novales Trend to the North-East
8
VARISCAN MINES
ANNUAL REPORT 2024
Operational Review
Licence Area
Size (km2)
Esperanza
34.44
Estela
0.56
Elena
0.28
Candela
1.11
Valeria
0.28
TOTAL
36.66
Table 1. Map of enlarged licence areas and extension of Novales Trend to the North-East
These new licences, which have increased the land package of Variscan’s Novales-Udias Project by around 70%, are immediately
adjacent to the existing San Jose and Buenahora tenements. They extend the Novales Trend to the northeast to approximately 12
km in strike length. These additional tenements represent a de-risked exploration opportunity for the Company, which extend over
very prospective areas, increase the scale of the Novales-Udias Project.
One of these newly acquired licences, the Estela licence, hosts the main shaft of the Udias Mine (Pozo Madroño) and some major
underground developments, and infills a previous gap in the San Jose licence.
This excellent step forward in the growth of the Novales-Udias project has the potential to increase scale and tonnage in this
proven, high grade zinc district. This is supported by the positive results from historical exploration, collated by Variscan. The
Variscan exploration team identified the location of 53 drillholes over the Esperanza licence area (see Figure 3) which include:
▯
DDH S-21:
6.0m @ 9.62% Zn
▯
DDH S-163:
7.3m @ 6.50% Zn
▯
DDH S-162:
3.2m @ 9.57% Zn.
The more significant zinc anomalies identified from historical geochemical sampling typically range 4,000 – 9,000 ppm Zn
(maximum 33,600 ppm Zn) and 380 – 2280 ppm Pb, making for compelling drill targets.
VARISCAN MINES
ANNUAL REPORT 2024
9
Operational Review
Figure 3. Map of enlarged licence areas and historical drilling over the Esperanza Licence
The future workplan for these new tenements includes drilling with applications already submitted.
FY24 Novales-Udias exploration and development activities
During the year, the Variscan team have been busy on the ground with all work-streams aligned towards the achievement of an initial
JORC-compliant Mineral Resource Estimate as well as working towards the re-start of mining operations. That has been and remains
our main effort.
Acquiring and interpreting historical data to gain operational leverage
Since we acquired the Novales-Udias project, we have sought to acquire available exploration and production data to augment our own
fieldwork and studies. Having collated a significant and valuable drilling database, as well as geological and mine plans, we have gained
operational leverage. Our extensive geological understanding has been developed efficiently and effectively, saving time and money.
In August 2023, Variscan Mines announced exploration and archival work at the San Jose Mine (see ASX announcement dated 7 August
2023) which confirmed a south-west extension and continuity of mineralisation from the San Jose Mine, on the Novales-Udias Trend.
The extension of mineralisation, along strike, revealed from new data collated by Variscan Mines, comprised, 131 historical drillholes
for 7,398 metres. Undoubtedly this shed a bright light on the upside potential to the south-west of the San Jose Mine and drew focus
onto the potential significance of the Udias Mine. This evolved with further positive sampling data reported post period (see ASX
Announcement dated 10 September 2024) and has advanced further with Variscan expecting to commence drill-testing the Udias
Mine complex for the first time in the fourth quarter of 2024.
10
VARISCAN MINES
ANNUAL REPORT 2024
Operational Review
Figure 4. Plan view of drill-hole data illustrating significant exploration
potential as mineralisation extends on strike to the south west of San Jose Mine
Revised structural and geological assessment highlights continuity and new drill targets at San
Jose Mine
Mid-February 2024 saw Variscan report the findings of a comprehensively updated, structural geological assessment and structural
targeting study at the San Jose Mine and the surrounding Novales Trend (see ASX announcement dated 19 February 2024).
The study, completed by world renowned expert, Dr. Brett Davis, resulted in a significantly improved understanding of the controls on
multi-phase Zn-Pb mineralization within the San Jose and Udias mine systems.
Its outcomes confirm the orientation of the dominant structural trends as a highly effective vectoring tool for drilling and future
exploration. The study identified new targets within the San Jose Mine for immediate drill-testing and highlighted numerous target
zones within the broader Novales – San Jose – Udias corridor.
VARISCAN MINES
ANNUAL REPORT 2024
11
Operational Review
Figure 5. Approximate orientation of the dominant D1 and D2 structures overlaid with existing mine development at the San Jose Mine
Figure 6. Interpreted tectonic evolution of the structurally controlled -mineralization-fluid flow system at San Jose
12
VARISCAN MINES
ANNUAL REPORT 2024
Operational Review
Figure 7. Regional-scale structures overlaid on JORC Exploration Target and proposed surface
drillhole locations proximal and further afield to the Udias – San Jose – Novales mine system and Zinc Trend.
Variscan quickly started to drill test some of the newly identified targets within the San Jose Mine as part of the ongoing underground
drilling campaign at the time.
Successful underground drilling campaign yields excellent high grade zinc results and is
expanded
Drilling is at the centre of our exploration activities and during the reporting period Variscan has been pleased to report multiple sets
of positive drilling results.
In recent years, the Variscan management team made the decision to acquire its own portable drill rig which means that by using our
trained staff, we are able to conduct underground drilling programs efficiently, cost effectively and with a high degree of flexibility.
Throughout the reporting period and beyond, having this in-house capability has allowed Variscan to continue drilling in contrast to
the wider junior mining sector which signalled reduced drilling activity amid challenging capital market conditions. This strategy has
proved highly successful.
In October 2023 (see ASX announcement dated 5 October 2023), high grade zinc assay results from underground drilling defined a
new lower lens of high-grade zinc mineralization below La Catedral stope in the San Jose Mine. Selected drilling results included:
▯
NDDT007B: 21.85m @ 8.50% Zn, 0.38% Pb
▯
NDDT012: 10.30m @ 5.09% Zn, 0.19% Pb
▯
NDDT007: 23.35m @ 7.09% Zn, 1.72% Pb
▯
NDDT010: 3.80m @ 24.58% Zn, 3.13% Pb
▯
NDDT014: 14.55m @ 5.81% Zn, 0.90% Pb
▯
NDDT008: 9.30m @ 5.18% Zn, 0.13% Pb
VARISCAN MINES
ANNUAL REPORT 2024
13
Operational Review
Figure 8. Plan view of drill-hole data illustrating newly defined La Catedral Lower Lens, Central Zone, San Jose Mine
Figure 9. Cross-section of newly defined La Catedral Lower Lens, Central Zone, San Jose Mine
14
VARISCAN MINES
ANNUAL REPORT 2024
Operational Review
Early March 2024 saw Variscan report the discovery of further high-grade zinc intercepts from its underground diamond drilling program at
the San Jose Mine (see ASX announcement dated 4 March 2024). Selected drilling results included:
▯
NDDT027 14.5 m @ 8.93% Zn, 0.50% Pb
▯
NDDT028 6.0 m @ 6.59% Zn, 0.62% Pb
▯
NDDT029 11.6 m @ 8.43% Zn, 1.61% Pb
▯
NDDT020
▯
NDDT026 7.0 m @ 5.30% Zn, 0.04% Pb
3.0 m @ 5.55% Zn, 0.41% Pb
Figure 10. Plan view of new drill-hole data over the Central Zone, San Jose Mine
This round of drilling results supported the Mineral Resource Estimate model (having been published in November 2023 – see below for
further discussion) with positive infill drill intercepts. It also confirmed the potential for additional lenses below the existing model and
further extensions.
To follow-up success, the Variscan management team upscaled and extended the drilling campaign, further details of which are set out in
post-period exploration results set out below.
An initial, maiden high-grade Mineral Resource Estimate published
In late November 2023, Variscan announced an initial, maiden JORC Mineral Resource Estimate (MRE) for the historically producing San Jose
Mine of 1.1Mt @ 9.0% Zn and 1.2%Pb at a cut-off grade of 2% Zn (see ASX announcement dated 28 November 2023). The maiden MRE for the
San Jose Mine is one of the highest grade zinc mineral resources currently owned by an ASX-listed company.
VARISCAN MINES
ANNUAL REPORT 2024
15
Operational Review
Deposit
Classification
Tonnes (Kt)
Zn %
Pb %
Zn + Pb %
Indicated
490
10.0
1.7
11.7
Inferred
250
12.3
1.6
14.0
Sub-total
740
10.8
1.7
12.5
San Jose (NE)
Inferred
260
4.7
0.1
4.8
Udîas (NE)
Inferred
90
6.5
0.4
6.8
Total
Indicated
490
10.0
1.7
11.7
Inferred
590
8.2
0.8
8.9
1,080
9.0
1.2
10.2
San Jose
TOTAL
Table 2. JORC Mineral Resource Estimate for San Jose Mine and
north-eastern Udías by deposit and classification reported above a 2% Zn cut-off
Notes:
▯
Due to effects of rounding, the total may not represent the sum of all components.
▯
Mineral resource is reported from all blocks, classified as either Indicated or Inferred, where interpolated block grade is ≥2.0% Zn.
▯
Block model is coded where blocks have been depleted by historical underground mining activities.
▯
A density value of 3 t/m3 is applied to all blocks.
Table 11. JORC Mineral Resource Estimate for San Jose Mine and north-eastern Udías by deposit
16
VARISCAN MINES
ANNUAL REPORT 2024
Operational Review
Resources in the Indicated category represent 45% of the MRE, with grades notably higher (10% Zn) than those in the Inferred category
(8.2% Zn), providing potential for significant grade and tonnage increases with infill drilling.
Figure 12. Mineral Resource Estimate categories in 3D View
Importantly, the deposit is already considered to be of sufficient grade, quantity, and continuity to have reasonable prospects for
eventual economic extraction. This initial, maiden resource for the San Jose Mine is a significant milestone for the Company. It
validates the success of our exploration activities to date and establishing a platform upon which we can continue to build a resource
inventory as well as advance mine re-start assessments.
Mineralization remains open along strike, and at depth. Subsequent drilling and exploration work undertaken by VAR has confirmed
the potential to grow the MRE. Variscan expect to publish an updated MRE before the end of calendar year 2024.
Lease San Jose Mine site & facilities extended; a key enabler supporting our mine re-start strategy
In early calendar year 2024, Variscan signed a new agreement to lease the San Jose Mine site and facilities for a period of three
years, extendable up to six years, at the option of Variscan, at a competitive, commercial rate in line with prevailing local norms for
industrial sites (see ASX announcement dated 29 January 2024). The site owners, Groupo Anibal are a supportive local partner and
Variscan shareholder. As this site is already permitted for mineral exploration, development and mining activities, with extensive insitu facilities and infrastructure already in place, the signing of the extended lease is a key enabler to support Variscan’s stated mine
re-start strategy. By leveraging these facilities, we can hopefully lower our re-start capex requirements and timeframes.
The site confers a number of advantages to Variscan:
▯
31,199m2 site adjacent to the village of Novales is
already permitted for use for mineral exploration,
development and mining activities;
▯
Access to the main portal of the underground San
Jose Mine;
▯
The site comprises 5 permanent buildings. The total
area of constructed buildings is 1,157m2 with the
ability add more warehouse area if required;
▯
The property has existing water supply, which is
being upgraded and single-phase power. The site was
previously supplied with overhead 3-phase power,
re-connection will be assessed during Mine Re-Start
Study work;
▯
Excellent core logging and storage facilities
established (see Figures 14 & 15);
▯
Direct access via sealed roads capable of taking
heavy goods vehicles;
▯
Site is within trucking distance (~145km) from the San
Juan de Nieva zinc smelter operated by Asturiana de
Zinc (100% owned by Glencore).
▯
Site is ~30km southwest from the regional capital,
Santander which has an international airport and a
deep water port with freight terminals.
VARISCAN MINES
ANNUAL REPORT 2024
17
Operational Review
Figure 13. Aerial view of San Jose Mine Site & Facilities
Figure 14. San Jose Mine Site Core Logging Area
18
VARISCAN MINES
ANNUAL REPORT 2024
Operational Review
Figure 15. San Jose Mine Site Core Storage
VARISCAN MINES
ANNUAL REPORT 2024
19
Operational Review
Guajaraz Project (central Spain).
The Guajaraz Project is a prospective brown-field zinc-rich polymetallic opportunity with known mineral occurrences. The Project
is located in the highly mineralised Central Zone of the Iberian Massif, which ranks as one of the most mineralised units globally and
represents the internal zone of the prolific European Variscan Orogenic belt. Variscan believes Guajaraz represents an excellent, derisked brownfield polymetallic project. Reflective of this belief in the prospectivity of this Project, the Company filed an application
with the authorities in Castilla-La Mancha during FY24 for a 3-year extension of the current exploration licence over the Guajaraz
tenement area. This 3-year extension, covering the period 2023 through 2026 was granted to Variscan Mines’ local Spanish subsidiary,
Variscan La Mancha in late October 2023.
f Post FY24 year end
Further exploration activities.
Subsequent to the end of Variscan’s FY24, exploration activities have continued apace.
Extended underground drilling continues to yield positive intercepts
Variscan has continued and expanded its drilling activities. In very early FY25, Variscan informed investors that drilling had intersected
significant zinc mineralisation outside of the Mineral Resource Estimate model delivering growth potential (see ASX announcement
dated 11 July 2024. The strong assay results received from this underground infill and extensional drilling campaign with significant
drilling results include:
▯
NDDT033:
14.10 m @ 5.31% Zn, 0.44% Pb
▯
NDDT034:
4.65 m @ 5.49% Zn, 0.14% Pb
▯
NDDT032:
11.00 m @ 6.66% Zn, 0.72% Pb
▯
NDDT035:
4.00 m @ 5.92% Zn, 0.26% Pb
Figure 16. Plan view of new drill-hole data over the Central Zone, San Jose Mine
20
VARISCAN MINES
ANNUAL REPORT 2024
Operational Review
Figure 17. 3D section view of drill-hole locations testing D2 structural
targets between Stope 200 and beside the La Caseta Trend in the San Jose Mine
Drilling has continued seamlessly from FY24 into FY25. The program is targeting previously untested southwest extensions of the San
Jose Mine as well as testing geologically informed potential feeder zones in the central zone of the San Jose Mine. Results are yet to
be published. All available drilling results will be incorporated into the Mineral Resource Estimate update scheduled for release in late
CY2024
Historic underground face-sampling Sampling data a positive prelude to maiden drilling in the Udias Mine
Towards the end of Q1 FY25, (ASX announcement dated, 10 September 2024) Variscan announced that newly compiled, assays from
historic underground face-sampling at the Udias Mine had revealed very high-grade zinc-lead results, further confirming mineralization
outside of the current Mineral Resource Estimate footprint (see ASX announcement dated 10 September 2024). 337 samples were
compiled over distance of 2.2km which includes the following high-grade sample results taken along development drives and faces:
▯
Sample UTS-15:
4.50m @ 26.47% Zn, 19.46% Pb
▯
Sample UTB-65L:
2.80m @ 35.87% Zn, 0.17% Pb
▯
Sample UTB-11:
4.00m @ 21.50% Zn, 0.32% Pb
▯
Sample B-20:
3.00m @ 28.20% Zn, 5.90% Pb
▯
Sample UTB-32:
2.00m @ 36.95% Zn, 0.41% Pb
▯
Sample UTB-132:
2.00m @ 35.39% Zn, 0.07 % Pb
▯
Sample UTB-86:
4.00m @ 16.39% Zn, 2.18% Pb
▯
Sample D-5:
1.55m @ 41.00% Zn, 0.22% Pb
These samples together with historic drilling results report August 2023 (see previous discussion above) have supported the definition
of exciting high-priority targets for our forthcoming, maiden underground drilling at the Udias Mine, which is due to start in H1 FY25.
VARISCAN MINES
ANNUAL REPORT 2024
21
Operational Review
Figure 18. Plan view of underground f