New Licences Awarded Increase Size of Novales-Udias Project
Released
Released
Announcement PDF
ASX Announcement | 08 April 2024
Variscan Mines Limited (ASX:VAR)
AWARD OF NEW LICENCES SUBSTANTIALLY INCREASES SIZE OF
NOVALES-UDIAS PROJECT
Highlights
•
•
•
•
•
•
•
•
70% increase to the land package of the newly enlarged Novales-Udias Project
5 new licences awarded, with an area of 36.66 km2, are immediately adjacent to the existing San Jose
and Buenahora tenements
New areas extend the Novales Trend to NE to approximately 12 km in strike length
De-risked exploration opportunity over very prospective areas to increase scale of the Novales-Udias
Project
Historical drill intercepts over the licence areas include:
o DDH S-21: 6.0m @ 9.62% Zn
o DDH S-163: 7.3m @ 6.50% Zn
o DDH S-162: 3.2m @ 9.57% Zn
o DDH S-162: 3.3m @ 6.33% Zn
o DDH S-162: 2.0m @ 6.73% Zn
o DDH S-100: 1.0m @ 6.28% Zn
Estela licence hosts the main shaft of the Udias Mine (Pozo Madroño) and some major underground
developments & infills a previous gap in the San Jose licence
Collation of additional archive information underway with further historical drilling results expected
to be reported
Future workplan includes drilling with applications already submitted
Variscan Mines Limited (ASX:VAR) (“Variscan” or “the Company”) is pleased to report the conditional award
of 5 new exploration licences comprising 36.66 km2 in aggregate, from the Consejería de Innovación,
Industria, Turismo y Comercio - del Gobierno de Cantabria (the Government of Cantabria) in northern Spain.
Variscan’s Managing Director & CEO, Stewart Dickson said,
”The award of 5 new licence areas is an excellent step forward in the growth of the Novales-Udias project
offering the realistic potential to increase scale and tonnage in this proven, high grade zinc district. The licence
areas infill and expand our project tenement area by some 70%. The new licences are contiguous and highly
prospective. After working to secure these licences over a number of years it is personally satisfying to achieve
this objective. Further, it demonstrates the strength of our relationships with the regional government as well
as reflecting the high regard of our local team with authorities and communities.
We have already submitted drilling permit applications and are looking forward to reporting on the progress
of exploring these new licence areas”
New Licences Awarded
The 5 new licences, together termed as the ‘Caborredondo’ licences, (see Figure 1 and Table 1) are for a three
year period and can be extended for an additional three years by the Ministry of Industry subject to
compliance by filing a report of results of the exploration program.
Formal ratification of the licences will be made following the review of certain supplementary information to
be supplied by Variscan, including annual work plans, to the satisfaction of the Government of Cantabria. The
award of the licences does not carry a minimum financial spending commitment.
Figure 1. Map of enlarged licence areas including the Caborredondo licences
Table 1. Licence areas awarded comprising the Caborredondo Licences
Licence Area
Size (km2)
Esperanza
34.44
Estela
0.56
Elena
0.28
Candela
1.11
Valeria
0.28
Total
36.66
2
Geology and Mineralization
The principal geological feature is a wide synclinal structure that characterizes the western end of the BasqueCantabrian Basin, named the Santillana syncline, striking NE-SW. The Caborredondo Licences cover a
significant part of the Santillana syncline, where multiple zinc ore deposits occur. The former producing
world-class Reocín Mine is located on the southeast flank of the syncline, whereas the newly gained ground
occupies a symmetrical position on the northwest flank of the syncline, where dolomitic alteration and zinc
mineralization are well developed in the same Gargasian (Upper Aptian) carbonate beds as found at the
nearby Reocín Mine.
The Reocín deposit is one of the largest known stratabound, carbonate-hosted, zinc-lead deposits in Europe.
The total metal endowment of the deposit, including past production and remaining reserves, is c. 87 Mt of
ore grading 11 percent Zn and 1 percent Pb. (Velasco, 2003). 1
Figure 2. Map of enlarged licence areas and underlying geology
1
Velasco, F., Herrero, J.M., Yusta, I., Alonso, J.A., Seebold, I. and Leach, D., (2003) ‘Geology and Geochemistry of the
Reocin Zinc-Lead Deposit, Basque-Cantabrian Basin, Northern Spain’ Econ. Geol. v.98, pp. 1371-1396.
3
Figure 3. Geological cross-section of the Santillana syncline
Mineralization in the district consists mainly of sulphides of sphalerite (ZnS), and galena (PbS) with minor
amounts of pyrite and / or marcasite. The sphalerite (generally termed as ‘zinc blende’) is clearly dominant
in proportion to the rest of sulphides. The blende is the main ore for zinc and occurs in various forms ranging
from massive, to crystals of small size, to botryoidal texture and filling fractures, although the most frequent
texture is banded.
In terms of exploration, intensely dolomitized carbonate rocks affected by faulting/fracturing are the
preferred locations for hosting zinc mineralization and the formation of zinc mineralization. Replacement of
host dolomite, open-space filling of fractures, and cementation of breccias derived from dissolution collapse
are the principal types of ore occurrence.
New Licence areas extend the Novales-Udias Trend towards NE
Figure 4. Map of enlarged licence areas and extension of Novales Trend to the North-East
4
The large licence area (34.4km2) to the east (auspiciously named ‘Esperanza’, i.e., ‘hope’ in Spanish) has
extended the Novales-Udias Trend of zinc mineralization to approximately 12km in length. The Novales-Udias
Trend is characterised by the former producing, sizeable San Jose and Udias Mines, as well as numerous
historical small-scale mines and workings. The Esperanza licence hosts over a dozen historical small-scale
mines and workings and has multiple positive exploration data, whereas the small licence in the centre of
the already held San Jose mining licence (named ‘Estela’) hosts the main shaft of the Udias mine (Pozo
Madroño) and some major underground developments of the historical Udias Mine.
De-risked exploration opportunity to scale-up the Novales-Udias Project
The new licence areas have been explored to a limited extent by Asturiana de Zinc in the 1980's. The data
uncovered to date indicates there is an opportunity to grow the scale of the tonnage of the Novales-Udias
Project.
Historical drilling
The Variscan exploration team have identified the location of 53 drillholes over the Esperanza licence area
(see Figure 5). Early work has confirmed historical drill intercepts over the licence areas that include:
•
•
•
•
•
•
DDH S-21: 6.0m @ 9.62% Zn
DDH S-163: 7.3m @ 6.50% Zn
DDH S-162: 3.2m @ 9.57% Zn
DDH S-162: 3.3m @ 6.33% Zn
DDH S-162: 2.0m @ 6.73% Zn
DDH S-100: 1.0m @ 6.28% Zn
A large amount of regional historical archives, including drillhole data, is currently under review and will be
reported as soon as practicable.
It is very clear that the Esperanza licence area hosts the eastern part of the high-zinc-grade Novales Trend,
which is open to the north-east, and also that the favourable dolomitic strata on the western limb of the
Santillana syncline and dipping east are prime exploration ground for large-scale ‘Reocin-type’ zinc systems,
with all the tell-tale exploration vectoring signs being very encouraging for drilling this area.
5
Figure 5. Map of enlarged licence areas and historical drilling over the Esperanza Licence
Geochemistry
Limited geochemical sampling was conducted by Asturiana de Zinc in the 1980s and shows high grade zinc
results extending northeast from the area of the San Jose Mine and highlighting the extensive length and
width of the Novales Trend as it outcrops on surface (see Figure 6). The more significant zinc anomalies
typically range 4,000 – 9,000 ppm Zn (maximum 33,600 ppm Zn) and 380 – 2280 ppm Pb, making for
compelling drill targets.
6
Figure 6. Geochemistry shows continuity from San Jose eastwards into the new Esperanza Licence.
Former mine workings
The new licence areas also host numerous historical near-surface and underground workings for zinc, such
as the historical small-scale mines of Margarita, Emilia, Soberbia, Pedroso, Cualquiercosa, and a number of
unnamed ones. An area of notable significance is the Estela licence, which hosts the main shaft of the Udias
Mine (Pozo Madroño) and some major underground developments in the central part of the historical Udias
Mine. The award of this licence infills a previous gap in the San Jose mining licence.
7
Figure 7. Pozo Madroño shaft, situated in the Estela Licence, as viewed today.
First class regional infrastructure
The enlarged Novales-Udias Project is located in the Cantabria Region, Northern Spain. The Cantabria region
is characterized by first world infrastructure including an industrial port and international airport in Santander
(less than ~40km from project). There is excellent rail and road network across the region (see Figure 8).
Glencore has its "San Juan de la Nieva" zinc smelter in the adjacent region, Asturias, about 170 km by highway
to the west.
8
Figure 8. Map of project areas and regional infrastructure
Next Steps and Way Forward
Variscan continues to deliver on its stated drilling plan and is pleased to confirm that its upscaled
underground drilling program will continue well in 2024. Together with a planned surface drilling campaign
later in 2024, the objective of delivering a MRE upgrade later this year remains extant.
ENDS
This ASX announcement has been approved by the Board and authorised for issue by Mr Stewart Dickson, Managing
Director and CEO, Variscan Mines Limited
For further information, please contact:
Variscan Mines Limited (ASX:VAR)
Stewart Dickson
Managing Director & CEO
E: stewart.dickson@variscan.com.au
T: +44 (0) 7799 694195
Media & Investor Enquiries
The Capital Network
Julia Maguire
E: julia@thecapitalnetwork.com.au
P: +61 2 8999 3699
9
About Variscan Mines Limited (ASX:VAR)
Variscan Mines Limited (ASX:VAR) is a growth oriented, natural resources company focused on the acquisition,
exploration and development of high-quality strategic mineral projects. The Company has compiled a portfolio of highimpact base-metal interests in Spain, Chile and Australia. Its primary focus is the development of its advanced zinc
projects in Spain. The Company’s name is derived from the Variscan orogeny, which was a geologic mountain building
event caused by Late Paleozoic continental collision between Euramerica (Laurussia) and Gondwana to form the
supercontinent of Pangea.
To learn more, please visit: www.variscan.com.au
For more information
Follow us on LinkedIn
Follow us on Twitter
Visit our investor website: www.variscan.com.au
Competent Person Statement
The information in this document that relates to technical information about the Novales-Udias project is based on, and
fairly represents information and supporting documentation compiled and reviewed by Dr. Mike Mlynarczyk, Principal
of the Redstone Exploration Services, a geological consultancy acting as an external consultant for Variscan Mines. Dr.
Mlynarczyk is a Professional Geologist (PGeo) of the Institute of Geologists of Ireland, and European Geologist (EurGeol)
of the European Federation of Geologists, as well as Fellow of the Society of Economic Geologists (SEG). With over 10
years of full-time exploration experience in MVT-style zinc-lead systems in several of the world’s leading MVT provinces,
Dr. Mlynarczyk has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the December
2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (‘JORC Code’). Dr. Mlynarczyk consents to the inclusion in the report of the matters based upon the
information in the form and context in which it appears.
The information in this document that relates to previous exploration results was prepared pre-2012 JORC code. It is
the opinion of Variscan that the exploration data is reliable. Although some of the data is incomplete, nothing has come
to the attention of Variscan that causes it to question the accuracy or reliability of the historic exploration.
Forward Looking Statements
Forward-looking statements are only predictions and are not guaranteed. They are subject to known and unknown risks,
uncertainties and assumptions, some of which are outside the control of the Company. Past performance is not
necessarily a guide to future performance and no representation or warranty is made as to the likelihood of
achievement or reasonableness of any forward-looking statements or other forecast. The occurrence of events in the
future are subject to risks, uncertainties and other factors that may cause the Company’s actual results, performance
or achievements to differ from those referred to in this announcement. Given these uncertainties, recipients are
cautioned not to place reliance on forward looking statements. Any forward-looking statements in this announcement
speak only at the date of issue of this announcement. Subject to any continuing obligations under applicable law and
the ASX Listing Rules, the Company, its directors, officers, employees and agents do not give any assurance or guarantee
that the occurrence of the events referred to in this announcement will occur as contemplated.
10
Project Summary
The Novales-Udias Project is located in the Basque-Cantabrian Basin, some 30km southwest from the regional
capital, Santander. The project is centred around the former producing San Jose underground mine with a large
surrounding area of exploration opportunities which include a number of satellite underground and surface
workings and areas of zinc anomalism identified from recent and historic geochemical surveys. Variscan has
delineated a significant 9km mineralised trend and a sub-parallel 3km trend from contemporary and historical
data across both the Buenahora exploration and Novales mining permits.
The San Jose Mine is nearby (~9km) to the world class Reocin Mine which is the largest known strata-bound
carbonate-hosted Zn-Pb deposit in Spain 2 and one of the world’s richest MVT deposits 3. Further it is within
trucking distance (~80km) from the San Juan de Nieva zinc smelter operated by Asturiana de Zinc (100%
owned by Glencore).
Significantly, the Novales-Udias Project includes a number of granted mining tenements 4.
Novales-Udias Project Highlights
• Near term zinc production opportunity (subject to positive exploratory work)
• Large tenement holding of 68.3 km2 (including a number of granted mining tenements)
• Regional exploration potential for another discovery analogous to Reocin (total past production and
remaining resource 62Mt @ 8.7% Zn and 1.0% Pb 56)
• Novales Mine is within trucking distance (~ 80km) from the zinc smelter in Asturias
• Classic MVT carbonate hosted Zn-Pb deposits
• Historic production of high-grade zinc; average grade reported as ~7% Zn7
• Simple mineralogy of sphalerite – galena – calamine
• Mineralisation is strata-bound, epigenetic, lenticular and sub-horizontal
• Reported historic production of super high grade ‘bolsas’ (mineralised pods and lenses) commonly 1020% Zn and in some instances +30% Zn 8
• Assay results of recent targeted grab samples taken from within the underground Novales Mine
recorded 31.83% Zn and 62.3% Pb 9
• Access and infrastructure all in place
• Local community and government support due to historic mining activity
• Maiden MRE of 1.08 Mt at 9% Zn established in Q4/2023 10
2
Velasco, F., Herrero, J.M., Yusta, I., Alonso, J.A., Seebold, I. and Leach, D., (2003) ‘Geology and Geochemistry of the
Reocin Zinc-Lead Deposit, Basque-Cantabrian Basin, Northern Spain’ Econ. Geol. v.98, pp. 1371-1396.
3
Leach, D.L., Sangster, D.F., Kelley, K.D., Large, R.R., Garven, G., Allen, C.R., Gutzner, J., Walters, S., (2005) ‘Sedimenthosted lead-zinc deposits: a global perspective’. Econ. Geol. 100th Anniversary Special Paper 561 607
4 Refer to ASX announcement of 29 July 2019
5 Velasco, F., Herrero, J.M., Yusta, I., Alonso, J.A., Seebold, I. and Leach, D., 2003 - Geology and Geochemistry of the
Reocin Zinc-Lead Deposit, Basque-Cantabrian Basin, Northern Spain: in Econ. Geol. v.98, pp. 1371-1396.
6 Cautionary Statement: references in this announcement to the publicly quoted resource tonnes and grade of the Project
are historical and foreign in nature and not reported in accordance with the JORC Code 2012, or the categories of
mineralisation as defined in the JORC Code 2012. A competent person has not completed sufficient work to classify the
resource estimate as mineral resources or ore reserves in accordance with the JORC Code 2012. It is uncertain that
following evaluation and/or further exploration work that the foreign/historic resource estimates of mineralisation will be
able to be reported as mineral resources or ore reserves in accordance with the JORC Code 2012.
7 These figures have been taken from historical production data from the School of Mines in Torrelavega historical
archives.
8 Reports of the super high-grade mineralisation are supported with historical production data from the School of Mines
in Torrelavega historical archives. (Refer ASX release 29 July 2019)
9 Refer to ASX Announcement of 19 December 2020
10
Refer to ASX Announcement of 27 November 2023
11
APPENDIX 1
JORC Table 1, Sections 1 and 2
Criteria
JORC Code explanation
Commentary
Sampling
techniques
•
•
•
•
•
Nature and quality of sampling
(e.g., cut channels, random chips,
or specific specialised industry
standard measurement tools
appropriate to the minerals under
investigation, such as down hole
gamma sondes, or handheld XRF
instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken
to ensure sample representativity
and the appropriate calibration of
any measurement tools or systems
used.
Aspects of the determination of
mineralisation that are Material to
the Public News release.
In cases where ‘industry standard’
work has been done this would be
relatively simple (e.g., ‘reverse
circulation drilling was used to
obtain 1 m samples from which 3
kg was pulverised to produce a 30
g charge for fire assay’). In other
cases more explanation may be
required, such as where there is
coarse gold that has inherent
sampling problems. Unusual
commodities or mineralisation types
(e.g., submarine nodules) may
warrant disclosure of detailed
information.
•
•
•
•
Drilling
techniques
•
Drill type (e.g., core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (e.g., core
diameter, triple or standard tube,
depth of diamond tails, facesampling bit or other type, whether
core is oriented and if so, by what
method, etc).
•
•
•
The data referred to in this report relates to exploration
undertaken by mining companies operating in the Project area
from the 1950’s to the late 1980’s, namely Asturiana de Zinc
Sociedad Anonima (AZSA), formerly known as Real Compania
Asturiana de Minas (RCAM).
This historical data consists of surface core drilling, of which the
paper-format core logs and location maps are held at the School
of Mines and Energy Engineering at Torrelavega, a faculty of
the University of Cantabria. The details of all available historical
drill hole collars and orientations are listed in Appendix 1.
Due to the incomplete nature of the historical drill data and
records, including procedures, a comment on the sample
representativity or calibration of measurement tools or systems
used by historical workers cannot be made. Further comments
regarding specific components of the historical drilling are
provided in subsequent sections of this table. The historical data
cannot be considered ‘industry standard’ by modern standards.
It has been assumed that the assays are representative of
technology available at the time, but no reliance has been put
on it. It is understood that most if not all assaying carried out by
Asturiana de Zinc Sociedad Anonima / Real Compania Asturiana
de Minas (the main historical operators of the project) was
carried out at their own laboratory (Laboratorio Central) in
Torres, and that the practice of assaying half-core was the
general rule.
The data referred to in this report also include records of
historical geochemical soil sampling conducted in the Project area
by Asturiana de Zinc Sociedad Anonima (AZSA) between 198385, with zinc and lead assay determinations realized at their own
laboratory (Laboratorio Central) in Torres. Again, the paper
records are held at the School of Mines and Energy Engineering
at Torrelavega, a faculty of the University of Cantabria, and the
data cannot be considered ‘industry standard’ by modern
standards, with the assays being representative of technology
available at the time, however, no reliance has been put on it.
The geochemical soil sampling lines were typically spaced 100250m apart, with the distance between sampling stations being
25m. The depth of sampling varied between 25 and 200cm, and
no information on the actual sample size was recorded.
The historical surface drilling referred to in this report is
understood to be all core drilling. No details of the drilling
techniques employed have been identified in the historic data.
This includes reference to core diameter(s), core orientation
methods, nor down hole survey data.
This release refers to 51 historical surface drillholes, only 48 of
which have sufficient data to be projected in 3D. These holes
consist of 24 vertical, 24 inclined and 3 holes with no azimuth
and dip indicated.
No records of the type of drill rig used have been identified.
12
Criteria
JORC Code explanation
Commentary
Drill sample
recovery
•
• No records of core recovery have been identified from the
historic data so far, however, the review of the archival datafiles
is still ongoing and has not been completed yet.
• Given the absence of core recovery data, it is not possible to
assess the potential of a relationship between sample recovery
and grade, and reported grades may be subject to either over
or underreporting.
•
•
Logging
•
•
•
Sub-sampling
techniques and
sample
preparation
•
•
•
•
•
•
Quality of assay
data and
laboratory tests
•
•
Method of recording and assessing
core and chip sample recoveries
and results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists
between sample recovery and
grade and whether sample bias
may have occurred due to
preferential loss/gain of
fine/coarse material.
Whether core and chip samples have
been geologically and
geotechnically logged to a level of
detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of
the relevant intersections logged.
If core, whether cut or sawn and
whether quarter, half or all core
taken.
If non-core, whether riffled, tube
sampled, rotary split, etc. and
whether sampled wet or dry.
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted
for all sub-sampling stages to
maximise representativity of
samples.
Measures taken to ensure that the
sampling is representative of the insitu material collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are
appropriate to the grain size of the
material being sampled.
The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the parameters used
in determining the analysis including
• Hardcopy geological logs for the 51 historical surface drillholes
are presently in the process of being reviewed and digitized.
No geotechnical logs have been identified yet. The drill hole
information reported here is not of a sufficient level of detail to
support a Mineral Resource Estimation, mining, or metallurgical
study.
• In the absence of detailed data, no comment on whether the
logging, where observed, is qualitative or quantitative has be
made. No core photography has been identified.
• Historical approach to drillcore sampling appears selective,
guided by geological observation and no “apparent” waste was
sampled.
• No details of the sub-sampling or sample preparation techniques
have been identified from the historic records, and no supporting
sampling procedures have been identified. In the absence of this
data and other data related to the sub-sampling techniques and
sample preparation, no comment on the appropriateness of the
sample preparation techniques can been made.
• No evidence of Quality Control procedures nor results have
been identified for the drillcore assaying or for the geochemical
soil sampling. This includes evidence of field duplicates or other
current industry standard quality control procedures, such as
Certified Reference Materials and blanks.
• In the absence of sample size data for both drillcore assaying
and geochemical soil sampling, no comment on whether the
sample size is appropriate to the grain size of the sampled
material has been made.
• No descriptions of the assaying and laboratory procedures used
have been found. It is unknown whether the techniques used
were partial or total.
• No descriptions of quality control procedures adopted by the
laboratory, nor any results of any related Quality Control data,
has been identified. No comment can be made on whether
acceptable accuracy or precision of results has been established.
13
Criteria
JORC Code explanation
•
Verification of
sampling and
assaying
•
•
•
•
instrument make and model, reading
times, calibrations factors applied
and their derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (ie lack of bias)
and precision have been established.
The verification of significant
intersections by either independent
or alternative company personnel.
The use of twinned holes.
Documentation of primary data,
data entry procedures, data
verification, data storage (physical
and electronic) protocols.
Discuss any adjustment to assay
data.
Location of data
points
• Accuracy and quality of surveys used
to locate drill holes (collar and
down-hole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation.
• Specification of the grid system
used.
• Quality and adequacy of
topographic control.
Data spacing
and distribution
• Data spacing for reporting of
Exploration Results.
• Whether the data spacing and
distribution is sufficient to establish
Commentary
• Due to the historic nature of the results reported, it has not been
possible to verify significant intersections. It is not known
whether verification of intersections was undertaken by previous
operators at the time of drilling. No remaining core from these
programmes have been identified to date, however
investigations are ongoing.
• The historic data does not include any twinned holes. It is
understood that Variscan may consider twinning historic drill
holes as part of the company’s upcoming exploration plans.
• No documentation or records of primary data, data entry
procedures, data verification, data storage (physical and
electronic) protocols have been identified.
• Historic records consist largely of paper-format drill hole and
soil geochemistry summaries. Variscan is in the process of
transferring this data to an industry standard drill hole /
geochemistry database during the ongoing exploration of the
project.
• Given the absence of detailed historical information relating to
the assay data, no adjustment to the assay data has been made.
Variscan have no reason to disbelieve the data as presented in
the historical logs, however, they understand the limitations of
the data for use in reliable and classified mineral resource
estimations going forward until assay verification has been
achieved to a satisfactory standard.
• The method of recording collar coordinates by the historic
operating companies has not been identified. It is noted that
much of the drilling was undertaken prior to the ubiquitous use of
modern GPS by industry. The accuracy of reported drill hole
collars has not been determined.
• Collar coordinates relating to the historic drill holes reported
were identified in a local grid and transformed to the European
Terrestrial Reference System 1989 (ETRS89), an earth-centre,
earth-fixed geodetic Cartesian reference frame for GIS work.
Thus, 2D maps (Figures) used in this report have been made with
ETRS89.
• The quality and adequacy of the topographic control on the
location of collar points has not been assessed. Collation and
cross-reference of historic map, level plan and log/tabular
hardcopy datasets show a reasonable degree of relative
geospatial correlation.
• The surface diamond drilling referred to in this news release was
drilled downward from drill pads duly prepared on the surface,
either vertically or as inclined drill holes. The surface drill holes
are not located in a grid pattern, and it is believed that many
14
Criteria
Orientation of
data in relation
to geological
structure
Sample security
Audits or
reviews
JORC Code explanation
the degree of geological and grade
continuity appropriate for the
Mineral Resource and Ore Reserve
estimation procedure(s) and
classifications applied.
• Whether sample compositing has
been a
Share your feedback
Discover