Half Year Financial Report
Released
Released
Announcement PDF
ASX Announcement | 15 March 2024
Variscan Mines Limited (ASX:VAR)
FINANCIAL REPORT – HALF-YEAR ENDED 31 December 2023
Variscan Mines Limited (“Variscan” or the “Company”) encloses its half-year financial report for the period
ended 31 December 2023.
Yours faithfully
Mark Pitts
Company Secretary
This announcement has been approved for release by Mr Mark Pitts, Company Secretary, Variscan Mines Limited.
For further information, please contact:
Variscan Mines Limited (ASX:VAR)
Stewart Dickson
Managing Director & CEO
E: stewart.dickson@variscan.com.au
T: +44 (0) 7799 694195
Media & Investor Enquiries
The Capital Network
Julia Maguire
E: julia@thecapitalnetwork.com.au
P: +61 2 8999 3699
About Variscan Mines Limited (ASX:VAR)
Variscan Mines Limited (ASX:VAR) is a growth oriented, natural resources company focused on the acquisition,
exploration and development of high-quality strategic mineral projects. The Company has compiled a portfolio of highimpact base-metal interests in Spain, Chile and Australia. Its primary focus is the development of its advanced zinc projects
in Spain. The Company’s name is derived from the Variscan orogeny, which was a geologic mountain building event caused
by Late Paleozoic continental collision between Euramerica (Laurussia) and Gondwana to form the supercontinent of
Pangea.
To learn more, please visit: www.variscan.com.au
For more information
Follow us on LinkedIn
Follow us on Twitter
Visit our investor website: www.variscan.com.au
Interim Financial Report
for the half-year ended
31 December 2023
Contents
Corporate Information
3
Directors’ Report
4
Auditor’s Independence Declaration
11
Condensed Consolidated Statement of Profit or Loss and Other Comprehensive Income
12
Condensed Consolidated Statement of Financial Position
13
Condensed Consolidated Statement of Changes in Equity
14
Condensed Consolidated Statement of Cash Flows
15
Notes to the Condensed Interim Financial Statements
16
Directors’ Declaration
28
Independent Auditor’s Review Report
29
Corporate Information
Directors
Mr Anthony Wehby
Non-executive Chairman
Mr Stewart Dickson
Managing Director & CEO
Mr Nick Farr-Jones
Non-executive Director
Dr Frank Bierlein
Non-executive Director
Company Secretary
Mr Mark Pitts
Registered Office
Level 5/191 St Georges Terrace
Perth WA 6000
Australia
P: +61 8 9316 9100
E: info@variscan.com.au
Share Registry
Boardroom Pty Ltd
GPO Box 3993
Sydney NSW 2001
Australia
P: +61 2 9290 9600
Auditors
HLB Mann Judd (WA Partnership)
Level 4, 130 Stirling Street
Perth WA 6000
Australia
+61 8 9227 7500
Securities Exchange Listing
Variscan Mines Limited’s shares are listed on the Australian Securities
Exchange (ASX: VAR)
Competent Persons Statements
The information in this document that relates to the Exploration Target, Exploration results and technical information about the NovalesUdias project is based on, and fairly represents information and supporting documentation reviewed by by Dr. Mike Mlynarczyk, Principal
of Redstone Exploration Services, a geological consultancy acting as an external consultant for Variscan Mines. Dr. Mlynarczyk is a
Professional Geologist (PGeo) of the Institute of Geologists of Ireland, and European Geologist (EurGeol) of the European Federation of
Geologists, as well as Fellow of the Society of Economic Geologists (SEG). With over 10 years of full-time exploration experience in MVTstyle zinc-lead systems in several of the world’s leading MVT provinces, Dr. Mlynarczyk has sufficient experience which is relevant to the
style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the December 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (‘JORC Code’). Dr. Mlynarczyk consents to the inclusion in the report of the matters based upon the information in the form and
context in which it appears.
Where Company refers to exploration results, historical data and mineral resource estimates previously advised to the ASX it confirms that
it is not aware of any new information or data that materially affects the information included in previous announcements and all material
assumptions and technical parameters disclosed in those announcements continue to apply and have not materially changed.
Variscan Mines Limited
Page 3
Directors’ Report
Your Directors of Variscan Mines Limited (the “Company”) submit the Interim Financial Report of the Group, being the Company and its
controlled entities (“Variscan” or the “Group”), for the half year ended 31 December 2023. In order to comply with the provisions of the
Corporations Act 2001, the Directors report as follows:
Directors
The names of Directors who held office during or since the end of the interim period and until the date of this report are noted below.
Directors were in office for the entire period unless otherwise stated.
Mr Anthony Wehby
Non-executive Chairman
Mr Stewart Dickson
Managing Director & CEO
Mr Nicholas (Nick) Farr-Jones
Non-executive Director
Dr Frank Bierlein
Non-executive Director
Review of operations
Spain – Novales-Udias Zinc Project
Project summary and strategy
The Novales-Udias Project is located in the Basque-Cantabrian Basin, some 30km southwest from the regional capital, Santander. The project
is centred around the former producing San Jose underground mine with a large surrounding area of exploration opportunities over the 9km
Novales Trend, which includes a number of satellite underground and surface workings.
This project, which is highly prospective across multiple fronts and located in close proximity to both major infrastructure requirements and
zinc consumers, continued to be the major focus of Variscan’s exploration and development activities over the six months to 31 December
2023.
Figure 1: Novales-Udias Project Opportunities
Variscan Mines Limited
Page 4
Directors’ Report
Over the past six months, Variscan has made rapid progress towards a mine restart.
Initial, maiden JORC-compliant Mineral Resource Estimate for San Jose
In late November 2023, Variscan released an initial, maiden JORC (2012) compliant Mineral Resource Estimate (“MRE”) for the San Jose Mine,
near Novales, located in Cantabria, northern Spain. (see ASX announcement dated 28 November 2023).
CSA Global (“CSA Global”), a member of the ERM Group of Companies, was engaged by Variscan to report a MRE for the San Jose deposit
and the adjacent north-eastern part of the Udías deposit. The MRE is 1.1Mt @ 9.0% Zn and 1.2%Pb at a cut-off grade of 2% Zn.
Table 1. JORC Mineral Resource Estimate for San Jose Mine and north-eastern Udías by deposit and classification reported above a 2% Zn
cut-off
Deposit
Classification
Tonnes (Kt)
Zn %
Pb %
Zn + Pb %
Indicated
490
10.0
1.7
11.7
Inferred
250
12.3
1.6
14.0
Sub-total
740
10.8
1.7
12.5
San Jose (NE)
Inferred
260
4.7
0.1
4.8
Udías (NE)
Inferred
90
6.5
0.4
6.8
Total
Indicated
490
10.0
1.7
11.7
Inferred
590
8.2
0.8
8.9
Total
1,080
9.0
1.2
10.2
San Jose
Notes:
•
•
•
•
Due to effects of rounding, the total may not represent the sum of all components.
Mineral Resource is reported from all blocks, classified as either Indicated or Inferred, where interpolated block grade is ≥2.0% Zn.
Block model is coded where blocks have been depleted by historical underground mining activities.
A density value of 3 t/m 3 is applied to all blocks.
The MRE has been estimated for the San Jose deposit as well as the adjacent north-eastern part of the Udías deposits, both of which were
previously mined for zinc during the 20th century. The Project is centred around the historically mined San Jose underground zinc-lead project
with a large surrounding area of exploration opportunities over the 9km Novales Trend, which includes a number of satellite underground
and surface workings.
The MRE incorporates outcomes from extensive drilling campaigns undertaken in and around the Project. Underground and surface drilling
has been carried out since the 1960s, with a drill hole database now comprising 1,105 drill-holes covering approximately 94,808m. Variscan
itself carried out surface and underground drilling programs in 2022 and 2023, targeting extensions to the known zones of mineralisation as
well as targeting new zones of mineralisation.
The mineralisation is classified as Mississippi Valley-type (“MVT”), hosted within a stratiform dolomitic unit. The MRE is classified as a
combination of Indicated and Inferred categories and has been reported in accordance with the JORC Code (2012) 1, with geological and
sampling evidence sufficient to assume geological and grade continuity within the volumes classified as Indicated. The MRE classification
levels were based upon an assessment of geological understanding of the deposit, geological and grade continuity, drillhole spacing, quality
control results, search and interpolation parameters, and an analysis of available density information.
The deposit is considered to be of sufficient grade, quantity, and continuity to have reasonable prospects for eventual economic extraction.
1 Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The JORC Code, 2012 Edition. Prepared by: The Joint
Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of
Australia (JORC)
Variscan Mines Limited
Page 5
Directors’ Report
Figure 1. Mineral Resource Estimate categories in 3D View
Additional JORC Exploration Target indicates the potential scale and grade of the San Jose Mine
The abovementioned reported MRE sits within a larger JORC Exploration Target of 3Mt - 6Mt, with grade ranges of 7 - 11% Zn and 0.3 - 1.6%
Pb 2.
Table 2. JORC Exploration Target Tonnage and Grade Estimate Ranges
Range
Tonnes (Mt)
Zn %
Pb %
Lower Estimate
3.0
7.0
0.3
Upper Estimate
6.0
11.0
1.6
2 The potential quantity and grade of this exploration target is conceptual in nature, there is currently insufficient exploration completed to support a
mineral resource of this size and it is uncertain whether continued exploration will result in the estimation of a Mineral Resource. The Exploration
Target has been prepared in accordance with the JORC Code (2012).
Variscan Mines Limited
Page 6
Directors’ Report
Figure 2. JORC Exploration Target indicates scope for Mineral Resource to grow
Phase 3 Underground Drilling at San Jose Mine defines a new thick lower lens of high-grade zinc with up to 25% zinc intersected
In early October 2023, Variscan Mines released high grade zinc assay results from the Phase 3 underground diamond drilling campaign at
the San Jose Mine (see ASX announcement dated 5 October 2023). This drilling programme has been focussed on prospective zones
identified from the development of the Company’s 3D model and is targeting an expansion of zones of mineralisation. These drill results
achieve both objectives by defining a new lower lens beneath the La Catedral in the Central Zone and expanding the mineralisation
footprint with continuity as the new lens links up with the La Caseta trend. The La Catedral lower lens is immediately accessible from main
gallery level of the mine.
Selected drilling results:
•
•
•
•
•
•
NDDT007B 21.85m @ 8.50% Zn, 0.38% Pb
o including 18.05m @ 10.22% Zn, 0.46% Pb
NDDT007 23.35m @ 7.09% Zn, 1.72% Pb
o including 11.0m @ 11.58% Zn, 3.35% Pb
NDDT014 14.55m @ 5.81% Zn, 0.90% Pb
NDDT012 10.30m @ 5.09% Zn, 0.19% Pb
NDDT010 3.80m @ 24.58% Zn, 3.13% Pb
NDDT008 9.30m @ 5.18% Zn, 0.13% Pb
Variscan Mines Limited
Page 7
Directors’ Report
Figure 3. Cross-section of newly defined La Catedral Lower Lens, Central Zone, San Jose Mine
Figure 4. 3D model illustrating newly defined La Catedral Lower Lens, Central Zone, San Jose Mine
Variscan Mines Limited
Page 8
Directors’ Report
Figure 5: Diamond Drill Core from NDDT014 (14.55m @ 5.81% Zn, 0.90% Pb) illustrating massive sphalerite hosted in dolostone
Further critical milestones in development of San Jose are currently a work-in-progress
With delineation of a maiden Mineral Resource Estimate for San Jose now complete, Variscan’s next focus is the delivery of other
milestones critical to San Jose again becoming a producing mine. San Jose-related tasks that Variscan plans to deliver over the first half of
Calendar Year 2024 include:
•
•
•
•
•
Preparation of a mine-restart concept study for the San Jose Mine.
A Phase 4 underground drilling campaign
A potential surface drilling campaign at San Jose along strike
A potential MRE upgrade
The potential actioning of recommendations coming out of the now-being-prepared mine re-start study
Spain – Guajaraz Zinc Project
The Guajaraz Project is a prospective brown-field zinc-rich polymetallic opportunity with known mineral occurrences. The project is located
in the highly mineralised Central Zone of the Iberian Massif, which ranks as one of the most mineralised geological units globally and
represents the internal zone of the prolific European Variscan Orogenic belt.
The project area lies within a primary igneous and metamorphic crystalline plateau that hosts abundant hydrothermal vein networks that
have a long history of exploration. Brittle-fault related vein and silicified breccia ore deposits are of the BPGC type (zinc-galena-pyritechalcopyrite).
While the main focus over the half-year was again the exploration and eventual development of the Novales-Udias project, Guajaraz
remains a core asset in Variscan’s portfolio.
Three-year extension of Guajaraz exploration license delivered
In late October 2023, Variscan announced that the Consejería de Desarrollo Sostenible (Department of Sustainable Development) of the
Junta de Comunidades de CastillaLa Mancha (the regional Government of Castile-La Mancha) had approved a 3-year extension of the
“Guajaraz” Permiso de Investigación (Exploration License), located in central Spain (see ASX announcement dated 26 October 2023).
A long-term exploration program for Guajaraz is now taking shape
The design of a future long-term work program for the Guajaraz Project, which will extend across the 2023 through 2026 lifespan of the
now renewed Exploration License, includes:
•
•
•
Soil geochemistry.
Geophysical survey.
Initial drilling campaign.
Variscan Mines Limited
Page 9
Directors’ Report
A geophysical campaign will be carried out, covering the same areas included in the already undertaken geochemical prospecting campaign
with assay results pending. The main objective will be to discover polymetallic (Zn-Pb-Ag-Cu), deposits by recording anomalous
chargeability and resistivity values utilising Direct Current Induced Polarization (DCIP). Initial planning anticipates the acquisition of
chargeability and resistivity data along six profiles between 1.3-1.7km in length. The total length of the campaign will be approximately
8,500 metres.
Depending on the results obtained in the proposed geochemical and geophysical surveys, capital allocation and permitting, a surface
drilling campaign is anticipated be conducted to drill-test targets identified. The objective of the drilling would be to seek extensions of (ZnPb-Ag-Cu) mineralization stepping out from the La Unión Mine.
Initial drill hole planning has been conducted based on the geological knowledge acquired to date. The final location of drill-holes will be
refined by the results of the preceding geochemical and geophysical surveys.
Figure 7. Guajaraz Project location
Significant events after balance date
On 19 January 2024, the Company issued 14,555,556 shares at $0.018 each pursuant to a placement originally announced on 9 March 2023.
The Company also issued 7,277,778 unlisted free attaching options exercisable at 2.75 cents ($0.0275) each on or before 15 March 2025.
Other than the above, there has been no additional matter or circumstance that has arisen after balance date that has significantly affected,
or may significantly affect, the operations of the Group, the results of those operations, or the state of affairs of the Group in future financial
periods.
Auditor Independence and Non-Audit Services
Section 307C of the Corporations Act 2001 requires our auditors, HLB Mann Judd, to provide the Directors of the Company with an
Independence Declaration in relation to the review of the half-year report. This Independence Declaration is set out on page 11 and forms
part of this Directors’ Report for the half year ended 31 December 2023.
Signed in accordance with a resolution of the Directors.
Stewart Dickson
Managing Director
Dated this 15th day of March 2024
Variscan Mines Limited
Page 10
AUDITOR’S INDEPENDENCE DECLARATION
As lead auditor for the review of the consolidated financial report of Variscan Mines Limited for the
half-year ended 31 December 2023, I declare that to the best of my knowledge and belief, there
have been no contraventions of:
a)
the auditor independence requirements of the Corporations Act 2001 in relation to the review;
and
b)
any applicable code of professional conduct in relation to the review.
Perth, Western Australia
15 March 2024
D B Healy
Partner
Page 11
Condensed Consolidated Statement of Profit or Loss and Other Comprehensive Income
For the half-year ended 31 December 2023
Consolidated
Notes
Six months to
Six months to
31 December
31 December
2023
2022
$
$
Continuing operations
Interest income
6,726
3,829
Other income
1,078
-
Total income
7,804
3,829
Compliance expenses
(34,483)
(40,495)
Professional services expenses
(114,511)
(143,439)
(156)
(31)
Directors’ expenses
(121,000)
(150,520)
Travel and accommodation expenses
(23,181)
-
-
(108,744)
Other expenses
(46,136)
(47,281)
Total expenses
(339,467)
(490,510)
Realised gain/(loss) on foreign exchange
(1,509)
1,619
Unrealised gain/(loss) on foreign exchange
2,032
46
523
1,665
(331,140)
(485,016)
-
-
(331,140)
(485,016)
Exchange differences on translation of foreign operations
(53,795)
20,183
Other comprehensive (loss) / income for the period, net of tax
(53,795)
20,183
Total comprehensive loss for the period
(384,935)
(464,833)
(0.09)
(0.18)
Finance expenses
Share based payments
6
Total foreign exchange gain/(loss)
Loss before income tax
Income tax expense
Loss for the period after income tax
Other comprehensive income, net of income tax
Items that may be reclassified subsequently to profit or loss
Loss per share
Basic and diluted loss per share (cents per share)
3
The accompanying notes form part of these financial statements
Variscan Mines Limited
Page 12
Condensed Consolidated Statement of Financial Position
As at 31 December 2023
Consolidated
Notes
31 December
30 June
2023
2023
$
$
Assets
Current assets
Cash and cash equivalents
778,915
1,017,571
Trade and other receivables
140,446
375,680
Total current assets
919,361
1,393,251
66,851
71,158
8,702,779
8,097,650
Other non-current assets
66,899
67,798
Total non-current assets
8,836,529
8,236,606
Total assets
9,755,890
9,629,857
Trade and other payables
386,519
254,179
Total current liabilities
386,519
254,179
Total liabilities
386,519
254,179
9,369,371
9,375,678
Non-current assets
Property, plant and equipment
Deferred exploration and evaluation expenditure
4
Liabilities
Current liabilities
Net assets
Equity
Issued capital
5
35,792,871
35,344,243
Reserves
5
302,697
875,774
(26,726,197)
(26,844,339)
9,369,371
9,375,678
Accumulated losses
Total equity
The accompanying notes form part of these financial statements
Variscan Mines Limited
Page 13
Condensed Consolidated Statement of Changes in Equity
For the half-year ended 31 December 2023
Consolidated
Share-based
payment
reserve
Issued capital
1 July 2022
Foreign currency
translation
reserve
Accumulated
losses
Total
34,018,303
636,838
85,649
(25,977,099)
8,763,691
Loss for the period
-
-
-
(485,016)
(485,016)
Other comprehensive income for
the period, net of income tax
-
-
20,183
-
20,183
Total comprehensive loss for the
period
-
-
20,183
(485,016)
(464,833)
Share based payments
-
108,744
-
-
108,744
Lapse of options
-
(19,000)
-
19,000
-
31 December 2022
34,018,303
726,582
105,832
(26,443,115)
8,407,602
1 July 2023
35,344,243
726,582
149,192
(26,844,339)
9,375,678
Loss for the period
-
-
-
(331,140)
(331,140)
Other comprehensive loss for the
period, net of income tax
-
-
(53,795)
-
(53,795)
Total comprehensive loss for the
period
-
-
(53,795)
(331,140)
(384,935)
Issue of shares for cash
333,000
-
-
-
333,000
Issue of shares in lieu of fees
45,628
-
-
-
45,628
Exercise of performance rights
70,000
(70,000)
-
-
-
-
(449,282)
-
449,282
-
35,792,871
207,300
95,397
(26,726,197)
9,369,371
Lapse of options
31 December 2023
The accompanying notes form part of these financial statements
Variscan Mines Limited
Page 14
Condensed Consolidated Statement of Cash Flows
For the half-year ended 31 December 2023
Consolidated
Six months to
Six months to
31 December
31 December
2023
2022
$
$
(384,639)
(361,349)
Interest received
6,726
3,829
Finance costs
(156)
(31)
(378,069)
(357,551)
(191,925)
(933,320)
Purchase of property, plant and equipment
(640)
(2,997)
Net cash outflow from investing activities
(192,565)
(936,317)
333,000
-
Net cash inflow from financing activities
333,000
-
Net (decrease) in cash and cash equivalents
(237,634)
(1,293,868)
Cash and cash equivalents at the beginning of the period
1,017,571
1,945,935
Effect of foreign exchange rate fluctuations on cash held
(1,022)
9,763
Cash and cash equivalents at the end of the period
778,915
661,830
Notes
Cash flows from operating activities
Payments to suppliers and employees
Net cash outflow from operating activities
Cash flows from investing activities
Exploration and evaluation expenditure
Cash flows from financing activities
Proceeds from issue of shares
5
The accompanying notes form part of these financial statements
Variscan Mines Limited
Page 15
Notes to the Condensed Interim Financial Statements
For the half-year ended 31 December 2023
Note 1: Basis of Preparation
These condensed interim financial statements are general purpose financial statements, which have been prepared in accordance with the
requirements of the Corporations Act 2001, Australian Accounting Standards including AASB 134 Interim Financial Reporting, Accounting
Interpretations and other authoritative pronouncements of the Australian Accounting Standards Board.
The financial statements comprise the consolidated condensed interim financial statements for the Group. For the purposes of preparing the
consolidated financial statements, the Group is a for-profit entity. The interim financial statements do not include full disclosures of the type
normally included in the annual financial report. Therefore, it cannot be expected to provide as full an understanding of the financial
performance, financial position and cash flows of the Group as the annual financial report. It is recommended these interim financial
statements be read in conjunction with the annual financial report for the year ended 30 June 2023 and any public announcements made by
Variscan Mines Limited and its subsidiaries during the half year in accordance with continuous disclosure requirements arising under the
Corporations Act 2001 and the ASX Listing Rules.
The accounting policies and methods of computation adopted are consistent with those of the previous financial year and corresponding
half year. These accounting policies are consistent with Australian Accounting Standards and with International Financial Reporting
Standards. The financial statements have been prepared on a historical cost basis, except for financial assets carried at fair value. Historical
cost is based on the fair values of the consideration given in exchange for assets, goods and services. The company is domiciled in Australia
and all amounts are presented in Australian dollars, unless otherwise noted. For the purpose of preparing the interim financial statements,
the half year has been treated as a discrete reporting period.
(a) Statement of compliance
The financial report was authorised for issue on 15 March 2024.
The interim financial statements comply with Australian Accounting Standards, which include Australian equivalents to International
Financial Reporting Standards (AIFRS). Compliance with AIFRS ensures that the financial report, comprising the interim financial statements
and notes thereto, complies with International Financial Reporting Standards (IFRS).
New Standards and Interpretations applicable for the half year ended 31 December 2023
In the period ended 31 December 2023, the Directors have reviewed all of the new and revised Standards and Interpretations issued by the
AASB that are relevant to the Group and effective for the current reporting period. As a result of this review, the Directors have determined
that there is no material impact of the new and revised Standards and Interpretations on the Group and, therefore, no material change is
necessary to Group accounting policies.
Standards and Interpretations in issue not yet adopted
The Directors have also reviewed all of the new and revised Standards and Interpretations on issue not yet adopted for the period ended 31
December 2023. As a result of this review the Directors have determined that there is no material impact of the Standards and
Interpretations in issue not yet adopted on the Group and, therefore, no change is necessary to Group accounting policies.
(b) Going concern
The financial report has been prepared on the going concern basis, which contemplates continuity of normal business activities and the
realisation of assets and settlements of liabilities in the ordinary course of business. For the half-year ended 31 December 2023, the Group
recorded a net loss after tax of $331,140 (2022: $485,016), and net cash outflows from operating and investment activities of $570,634
(2022: $1,293,868). At 31 December 2023, the Group had $778,915 in cash and cash equivalents (30 June 2023: $1,017,571) and net working
capital of $532,842 (30 June 2023: $1,139,072).
Furthermore, as noted in Note 9, subsequent to the end of the year the Company issued 14,555,556 shares at $0.018 each pursuant to a
placement originally announced on 9 March 2023.
Notwithstanding the above, and whilst not immediately required, the Group will need to raise further funds into the future to meet its
budgeted and planned exploration expenditure as well as corporate overheads. The Group’s ability to raise additional funds into the future
will be impacted by the success of exploration activities and market conditions. The Directors have reviewed the Group’s overall financial
position and are of the opinion that the use of the going concern basis of accounting is appropriate as they believe the Group will have
sufficient funds available for at least 12 months to achieve its objectives and noting that it will be able to raise further funding or reduce or
delay expenditures. Should these planned activities to raise or conserve capital not be successful, there exists a material uncertainty that
may cast significant doubt upon the Group’s ability to continue as a going concern and, therefore, to realise its assets and extinguish its
liabilities in the normal course of business and at the amounts stated in the financial report.
Variscan Mines Limited
Page 16
Notes to the Condensed Interim Financial Statements
For the half-year ended 31 December 2023
Note 2: Segment Reporting
AASB 8 Operating Segments requires operating segments to be identified on the basis of internal reports about components of the Group
that are regularly reviewed by the Chief Operating Decision Maker in order to allocate resources to the segment and to assess its
performance.
The Group’s operating segments have been determined with reference to the monthly management accounts used by the Chief Operating
Decision maker to make decisions regarding the Group’s operations and allocation of working capital. Due to the size and nature of the
Group, the Board as a whole has been determined as the Chief Operating Decision Maker.
Based on the quantitative thresholds included in AASB 8, there are currently two geographical segments, being Australia and Spain, which
are considered for management purposes to form part of the single reportable segment of mineral exploration.
Segment information
The following tables present revenue and profit information and certain asset and liability information regarding geographical segments:
As at
Segment assets
Segment liabilities
Segment loss before income tax
expense
Variscan Mines Limited
Spain
Total
$
$
$
31 December 2023
797,735
8,958,155
9,755,890
30 June 2023
974,554
8,655,303
9,629,857
31 December 2023
(330,683)
(55,836)
(386,519)
30 June 2023
(206,655)
(47,524)
(254,179)
For the half year
ended
Segment income
Australia
Australia
Spain
Total
$
$
$
31 December 2023
7,804
-
7,804
31 December 2022
3,829
-
3,829
31 December 2023
(332,218)
1,078
(331,140)
31 December 2022
(495,356)
10,340
(485,016)
Page 17
Notes to the Condensed Interim Financial Statements
For the half-year ended 31 December 2023
Note 3: Loss Per Share
Basic and diluted loss per share
Consolidated
Six months to
Six months to
31 December
31 December
2023
2022
Basic and Diluted loss per share (cents per share)
(0.09)
(0.18)
Gain/(Loss)
The Gain or (Loss) used in the calculation of basic and diluted gain/(loss) per share is as follows:
Consolidated
Loss used in the calculation of basic loss per share
Six months to
Six months to
31 December
31 December
2023
2022
$
Share your feedback
Discover