Quarterly Activities and Cash Flow Reports
September 2023 Quarterly Report | 31 October 2023
Variscan Mines Limited (ASX:VAR)
Variscan confirms continuity of mineralisation in San Jose; works on
near-term delivery of key Novales-Udias development milestones
Investment highlights
•
•
•
•
Further exploration activities within the Novales-Udias Project confirm south-west extension
and continuity of mineralisation from the San Jose Mine, along the >9km Novales-Udias Trend
After quarter’s end, Variscan Mines announced early results from the current Phase 3
underground drilling campaign
These Phase 3 drill results have defined a new lower lens of high-grade zinc mineralisation
below the La Catedral stope in the San Jose Mine
Variscan Mines reiterates its intention to deliver on a host of additional San Jose Mine
development milestones over the coming months. These include:
Completion of a new 3D mineralisation model
A structural geological assessment and exploration targeting study
Delineation of a maiden Mineral Resource Estimate
Preparation of a concept study for re-opening the San Jose Mine.
Variscan Mines Limited (ASX:VAR) (“Variscan” or “the Company”) is pleased to announce its Appendix 5B
for the quarter ended 30 September 2023 and an accompanying operational update for this period.
Variscan’s Managing Director & CEO, Stewart Dickson said, "The Novales-Udias Project continued to be our
major priority in the September 2023 quarter, exploration work within this Project provided further
confirmation of the scale, continuity and quality of the zinc mineralisation beyond the immediate workings of
the former producing San Jose Mine. Initial results coming out of our Phase 3 underground drilling campaign,
announced to the market just after quarter’s end, defined a new lower lens of high-grade zinc mineralisation
below La Catedral stope in the San Jose Mine – and there is ample scope for more positive news to come
through this campaign, which will continue through to calendar end 2023.
With our exploration activities continuing to show positive results, we are now moving to materially progress
some key milestones in our stated development plan for the Project and advance this high-grade zinc project
towards production. We look forward to announcing the delivery of these milestones, including the
delineation of a maiden JORC compliant Mineral Resource Estimate for the San Jose Mine, shortly.”
OPERATIONS REVIEW
Variscan’s exploration/development strategy for the Novales-Udias Project continued to advance well during
the September 2023 quarter.
Spain – Novales-Udias Zinc Project
The Novales-Udias Project is located in the Basque-Cantabrian Basin, some 30km southwest from the
regional capital, Santander. The project is centred around the former producing San Jose underground mine
with a large surrounding area of exploration opportunities over the 9km Novales Trend, which includes a
number of satellite underground and surface workings.
This project, which is highly prospective across multiple fronts and located in close proximity to both major
infrastructure requirements and zinc consumers, continued to be the major focus of Variscan’s exploration
activities over the three months to 30 September 2023.
South-west extension and continuity of mineralisation from the San Jose Mine confirmed
In early August 2023, Variscan Mines released the results of further exploration activities within its NovalesUdias Project that confirmed south-west extension and continuity of mineralisation from the San Jose Mine,
on the 9km Novales-Udias Trend (see ASX announcement dated 7 August 2023, Figure 1). This extension of
mineralisation, along strike, was revealed from new data collated by Variscan Mines and which comprised
131 historical drillholes for 7,398 metres. These additional results grew the Company’s drillhole database at
San Jose Mine to 1,114 drill-holes for 95,553 metres.
This work gave Variscan Mines a clear and more robust picture of the scale, continuity and quality of the zinc
mineralisation beyond the immediate workings of the San Jose Mine. Specifically, the new data indicates
significant exploration potential to the south west of the San Jose Mine. This follow on from the confirmed
significant strike potential of the San Jose mineralised system to the north east, as demonstrated by
previously reported high grade drilling results from Variscan’s step-out drilling (see ASX announcement dated
2 March 2023) and additional data (see ASX announcement dated 25 May 2023).
These data and the new findings will be incorporated in the ongoing work-streams and delineation of a JORC
compliant Mineral Resource Estimate, which is underway.
2
Figure 1. Plan view of drill-hole data illustrating significant exploration potential, as mineralisation extends
on strike to the south west of San Jose Mine (ASX announcement 7 August 2023)
New thick lower lens of high-grade zinc defined at San Jose Mine
Just after the end of the September 2023 quarter, Variscan Mines released high grade zinc assay results from
its Novales-Udias Phase 3 underground drilling campaign (see ASX announcement dated 5 October 2023).
3
This drilling programme (Figures 2, 3) has focussed on prospective zones identified from the development of
the Company’s 3D model and is targeting an expansion of current known zones of mineralisation. The latter
objective is now being realised, with these results defining a new lower lens of high-grade zinc mineralisation
below La Catedral stope in the San Jose Mine. This work also identified that the La Catedral area hosted
extensive mining of high-grade ore zones above this newly defined lower lens.
Figure 2: Plan view of drill-hole data illustrating newly defined La Catedral Lower Lens, Central Zone, San Jose
Mine
4
Figure 3: . Diamond Drill Core from NDDT014 illustrating massive sphalerite hosted in dolostone
Further key milestones in development of Novales-Udias Project will soon be realised
The September 2023 quarter saw Variscan Mines provide a detailed update on the Company’s progress
towards delivering the development plan for its Novales-Udias Project which includes the San Jose Mine (see
ASX announcement dated 28 September 2023).
The Company reiterates its intention to deliver on a host of additional development milestones over coming
months (Figure 4). These include:
•
•
•
•
Completion of a new 3D mineralisation model
Structural geological assessment and targeting study, to be completed by world-renowned expert
Dr. Brett Davis, and expected to be delivered in the December 2023 quarter
Delineation of a maiden Mineral Resource Estimate, with ERM (formerly CSA Global) commissioned
to complete this task
Engagement of Piran Mining to prepare a concept study for re-opening the San Jose Mine.
5
Figure 4: Variscan’s pathway to development for its San Jose asset
Spain – Guajaraz Zinc Project
With the main focus being the exploration and eventual development of the Novales-Udias project, limited
activities were undertaken by the Company in connection with Guajaraz over the September 2023 quarter.
Variscan remains excited by the potential in the Guajaraz Project and subsequent to the end of the quarter
received a three-year extension of its exploration licence.
PROJECT SUMMARIES
Spain – Zinc-rich Novales-Udias Project
The Novales-Udias Project is located in the Basque-Cantabrian Basin, some 30 kilometres southwest from
the regional capital, Santander. The project is centred around the former producing San Jose underground
mine with a large surrounding area of exploration opportunities for a number of satellite deposits based on
underground and surface workings, our substantial database of some 88,000m of historic drilling and
multiple areas of zinc anomalism identified from recent and historic geochemical surveys. Variscan has
defined the NE-SW Novales Trend over 9 kilometres with a parallel mineralised trend over at least 3
kilometres of strike.
6
Key highlights of the Novales-Udias Project:
•
•
•
•
•
•
•
•
•
•
•
•
Near term zinc production opportunity (subject to positive exploratory work)
Large tenement holding of 68.3 km2 (including several granted mining tenements)
Regional exploration potential for another discovery analogous to Reocin (total past production
and remaining resource 62Mt @ 8.7% Zn and 1.0% Pb 1,2)
Novales Mine is within trucking distance (around 80km) of the Asturias zinc smelter
Classic MVT carbonate hosted Zn-Pb deposits
Historic production of high-grade zinc; average grade reported as around 7% Zn 3
Simple mineralogy of sphalerite – galena – calamine
Ore is strata-bound, epigenetic, lenticular and sub-horizontal
Reported historic production of super high grade ‘bolsas’ (ore bags) commonly 10-20% Zn and in
some instances +30% Zn 4
Assay results of recent targeted grab samples taken from within the underground Novales Mine
recorded 31.83% Zn and 62.3% Pb 5
Access and infrastructure all in place
Local community and government support due to historic mining activity
Spain – Guajaraz Zinc-rich Polymetallic Project
The Guajaraz Project is a prospective brown-field zinc-rich polymetallic opportunity with known mineral
occurrences. The project is located in the highly mineralised Central Zone of the Iberian Massif, which ranks
as one of the most mineralised geological units globally and represents the internal zone of the prolific
European Variscan Orogenic belt. Variscan believes Guajaraz represents an excellent, de-risked brownfield
polymetallic project.
FINANCIAL & CORPORATE
CASH
Cash at bank at the end of the quarter was $1.13 million.
During the quarter, Variscan Mines Cantabria (being the local subsidiary for the Novales-Udias project)
received a tax refund of €162.230,55 (~A$265,055) from the Spanish Tax Authorities.
1 Velasco, F., Herrero, J.M., Yusta, I., Alonso, J.A., Seebold, I. and Leach, D., 2003 - Geology and Geochemistry of the
Reocin Zinc-Lead Deposit, BasqueCantabrian Basin, Northern Spain: in Econ. Geol. v.98, pp. 1371-1396.
2
Cautionary Statement: references in this announcement to the publicly quoted resource tonnes and grade of the
Project are historical and foreign in nature and not reported in accordance with the JORC Code 2012, or the categories
of mineralisation as defined in the JORC Code 2012. A competent person has not completed sufficient work to classify
the resource estimate as mineral resources or ore reserves in accordance with the JORC Code 2012. It is uncertain that
following evaluation and/or further exploration work that the foreign/historic resource estimates of mineralisation
will be able to be reported as mineral resources or ore reserves in accordance with the JORC Code 2012.
3
Anecdotal evidence from original Novales miners interviewed during the WAI Due Diligence supported with historical
production data from the School of Mines in Torrelavega historical archives
4
4 Anecdotal evidence from original Novales miners interviewed during the WAI Due Diligence supported with
historical production data from the School of Mines in Torrelavega historical archives.
5
Refer to ASX Announcement of 19 December 2019.
1
7
SUMMARY OF EXPENDITURE ON EXPLORATION ACTIVITIES
For the quarter, the Group spent $249,000 on exploration activities, substantively all of which related to the
Group’s Spanish zinc projects. These exploration activities related to:
•
•
•
•
•
Surface and underground drilling;
Geological mapping and modelling;
Technical consulting fees;
Tenement administration, reporting and management; and
Directly-attributable corporate overheads and administration costs.
In accordance with ASX Listing Rule 5.3.2, the Company advises that no Mining Development or Production
activities were conducted during the quarter.
SHARE CAPITAL
The total number of shares on issue at the end of the quarter was 356,614,741.
DEFERRED SETTLEMENT SHARES
In accordance with the acquisition of the Spanish Zinc projects, the Company must issue additional shares
upon the satisfaction of certain exploration milestones. These milestones are for the definition, in accordance
with JORC 2012, of an Inferred Mineral Resource (or greater) of:
a) Milestone 1: 4 million tonnes at 7% Zn
b) Milestone 2: 8 million tonnes at 7% Zn
Upon satisfaction of each of these milestones, the Company must issue 27,500,000 ordinary shares to the
vendors of Slipstream Spain Pty Ltd and Slipstream Spain 2 Pty Ltd, and 2,426,471 shares to Hispanibal S.L.
as the vendor of the “Hispanibal Option”, for a total of 59,852,941 Ordinary Shares if both milestones are
met.
There is currently no obligation to issue the milestone shares.
OTHER
During the quarter, the Company made payments to related parties of $54,000 represented by remuneration
paid to Directors.
ENDS
This ASX announcement has been authorised by the Variscan Mines Limited
For further information, please contact:
Variscan Mines Limited (ASX:VAR)
Stewart Dickson
Managing Director & CEO
E: stewart.dickson@variscan.com.au
T: +44 (0) 7799 694195
8
Media & Investor Enquiries
The Capital Network
Julia Maguire
E: julia@thecapitalnetwork.com.au
P: +61 2 8999 3699
About Variscan Mines Limited (ASX:VAR)
Variscan Mines Limited (ASX:VAR) is a growth oriented, natural resources company focused on the acquisition,
exploration and development of high-quality strategic mineral projects. The Company has compiled a portfolio of
high-impact base-metal interests in Spain, Chile and Australia. Its primary focus is the development of its advanced
zinc projects in Spain. The Company’s name is derived from the Variscan orogeny, which was a geologic mountain
building event caused by Late Paleozoic continental collision between Euramerica (Laurussia) and Gondwana to form
the supercontinent of Pangea.
To learn more, please visit: www.variscan.com.au
For more information
Follow us on LinkedIn
Follow us on Twitter
Visit our investor website: www.variscan.com.au
COMPETENT PERSONS STATEMENT
The information in this document that relates to the Exploration results and technical information is based
on, and fairly represents information and supporting documentation reviewed by Dr. Mike Mlynarczyk,
Principal of the Redstone Exploration Services, a geological consultancy acting as an external consultant for
Variscan Mines. Dr. Mlynarczyk is a Professional Geologist (PGeo) of the Institute of Geologists of Ireland,
and European Geologist (EurGeol) of the European Federation of Geologists, as well as Fellow of the Society
of Economic Geologists (SEG). With over 10 years of full-time exploration experience in MVT-style zinc-lead
systems in several of the world’s leading MVT provinces, Dr. Mlynarczyk has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he
is undertaking to qualify as a Competent Person as defined in the December 2012 edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (‘JORC Code’). Dr.
Mlynarczyk consents to the inclusion in the report of the matters based upon the information in the form
and context in which it appears.
Where Company refers to exploration results and historical data previously advised to the ASX it confirms
that it is not aware of any new information or data that materially affects the information included in previous
announcements and all material assumptions and technical parameters disclosed in those announcements
continue to apply and have not materially changed.
9
LISTING OF TENEMENTS HELD AT 30 JUNE 2023
Tenement
SPAIN – Note 5
Tenement No.
Interest
Joint Venture Details
Cantabria
Buenahora Fraction 1
IP 16.662-01
100%
Buenahora Fraction 2
IP 16.662-02
100%
San José
EC 94
100%
La Torra
EC 512
100%
Tres Amigos
EC 1565
100%
Torpeza
EC 2557
100%
Andrea
EC5220
100%
Andrea-demasía a
EC5374
100%
Es
EC8049
100%
Dudosa
EC8165
100%
Cargadoiro
EC11589
100%
Tres amigos-demasía a
EC11594
100%
Flor del pueblo
EC12942
100%
Torpeza-demasía a
EC12952
100%
Torpeza-3ª demasía a
EC13079
100%
Torpeza-2ª demasía a
EC13080
100%
Flor del pueblo-demasía a
EC13154
100%
Dudosa-demasía a
EC13170
100%
Andrea-3ª demasía a
EC13175
100%
Andrea-2ª demasía a
EC13176
100%
Cargadoiro-demasía a
EC13260
100%
Ampliación a Matilde
EC13641
100%
Aumentada
EC14238
100%
Campitos
EC14554
100%
Campitos-demasía a
EC14640
100%
Carmenchu
EC14945
100%
Amelita
EC14949
100%
Eloísa
EC14947
100%
Ampliación a Matilde-demasía a
EC14948
100%
Cargadoiro 2
EC14954
100%
Amelita-demasía a
EC14979
100%
Carmenchu-demasía a
EC14980
100%
Eloísa-demasía a
EC14981
100%
Carmenchu-2ª demasía a
EC14982
100%
6º Aumento a porvenir
EC15672
100%
Ampliación a Matilde-demasía a
EC13641-10
100%
Campitos-segunda demasía a
EC14554-20
100%
Cargadoiro 2- demasía a
EC14954-10
100%
Carmenchu-tercera demasía a
EC14980-30
100%
10
Tenement
6º Aumento a porvenir-demasía a
Tenement No.
EC15672-10
Interest
100%
Joint Venture Details
Torpeza-tercera demasía a
EC2557-30
100%
IP 4.203
100%
Rosario 6 1-40
0310259624
10.4%
Note 4
Rosario 7 1-60
0310259632
10.4%
Note 4
Rosario 101
03102N2229
10.4%
Note 4
Salvadora
0310231355
10.4%
Note 4
Abandonara
0310248487
10.4%
Note 4
Note 1
Toledo
Guajaraz
CHILE
Rosario
NEW SOUTH WALES
Willyama
EL 8075
0%
Hillston
EL 6363
39.2%
Native Dog
EL 8236
0%
Note 1
Woodlawn South
ELs 7257 and 7469
0%
Royalty interest only
Junction Dam
EL 5682
0%
Marmota acquired 100% ownership.
See Note 2
Callabonna
EL 5360
49%
Red Metal 51%, can earn 70%
St Pierre
PER
100%
Beaulieu
PER
100%
Perilya can earn 80%, Eaglehawk
9.8%
SOUTH AUSTRALIA
FRANCE
EL
= Exploration License
PER
= Permis Exclusif de Recherche (France)
IP
= Investigation Permit (Spain)
EC
= Exploration Concession (Spain)
Note 1:
Under an agreement with Silver City Minerals Limited, Broken Hill Operations and Eaglehawk Geological
Consulting Pty Ltd Variscan has converted its interest in parts of these tenements to a NSR (Net Smelter
Return).
11
Note 2:
Marmota has earned 100% of the uranium rights only in EL 5682. Variscan has a 0.5% net profits royalty
on production from a uranium mine.
Note 3:
The remaining exploration licenses owned by Variscan Mines SAS (excluding the Couflens PER) have
been conditionally acquired by a new wholly owned subsidiary, Variscan Mines Europe Limited.
Pursuant to the approval for the Subsidiary Sale, the Ministry of Economy and Finance has imposed,
without prior consultation, the compulsory relinquishment of the remaining licenses. The Company has
approved the relinquishment request and has yet to receive a response. The timetable for the
completion of the relinquishment process is unknown.
Note 4:
On 1 July 2019 the Company announced it had successfully renegotiated the terms of the existing
Option Agreement to provide the Company with a participating interest of 10.4%. The Company can
earn up to 90% of the project through payment of amounts totaling approximately US$2.25 million.
12
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Variscan Mines Limited
ABN
Quarter ended (“current quarter”)
16 003 254 395
30 September 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (3
months)
$A’000
-
-
(5)
(5)
(b) development
-
-
(c) production
-
-
(d) staff costs
(50)
(50)
(e) administration and corporate costs
(142)
(142)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
4
4
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
Net VAT refunded – Spanish
Operations
270
270
1.9
Net cash from / (used in) operating
activities
77
77
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(244)
(244)
(e) investments
-
-
(f)
-
-
-
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (3
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(244)
(244)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
280
280
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
280
280
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,016
1,016
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
77
77
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(244)
(244)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
280
280
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Year to date (3
months)
$A’000
2
2
1,131
1,016
Current quarter
$A’000
Previous quarter
$A’000
1,131
1,016
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,131
1,016
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
50
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
4
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(244)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(167)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,131
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
1,131
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
6.77
-
$A’000
77
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Not applicable
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: Not applicable
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Not applicable
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
.............31 October 2023......................................................................
Authorised by: .....................The Board..............................................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Share your feedback
Discover