June 2024 Quarterly Report | 31 July 2024
Variscan Mines Limited (ASX:VAR)
New licences awarded
Preparatory work occurs ahead of next round of drilling
Post quarter, current underground infill and extensional drilling delivers
strong assay results
Interim funding secured
Key Highlights
Novales-Udias Project land area materially increased on award of new licences
•
•
•
•
•
•
The Novales-Udias Project’s land package expands by 70% after five new licences are awarded
These new licences, which cover an area of 36.66 km2, are immediately adjacent to Variscan
Mines’ existing San Jose and Buenahora tenements
The new areas extend the Novales Trend to the northeast to approximately 12 km in strike
length
The new licences deliver increased scale to the Novales-Udias Project and provide de-risked
exploration opportunity over very prospective areas
Historical drill results include some significant zinc mineralisation intercepts
Variscan’s future workplan includes drilling with applications already submitted.
Subsequent to quarter’s end, further drilling identifies thick zinc mineralisation outside of the San
Jose Mine’s current mineral resource
•
•
•
•
•
More strong assay results have recently been received from Variscan Mines’ current
underground infill and extensional drilling campaign at the San Jose Mine
Significant drilling results include (refer ASX announcement dated 11 July 2024):
o NDDT033: 14.10m @ 5.31% Zn, 0.44% Pb
o NDDT032: 11.00m @ 6.66% Zn, 0.72% Pb
o NDDT034: 4.65m @ 5.49% Zn, 0.14% Pb
o NDDT035: 4.00m @ 5.92% Zn, 0.26% Pb
These results indicate significant mineralization intersected outside the existing Mineral
Resource Estimate model delivering growth potential
Upscaled underground drilling will continue targeting previously untested southwest
extensions of San Jose Mine and into the Udias Mine complex
All new drilling results are to be incorporated into a Mineral Resource Estimate update
planned later in CY2024.
Also subsequent to quarter’s end, interim funding was completed
• Completion of interim funding initiative, raising $294,000 through the issue of 49,000,000 new
ordinary shares at $0.006 per share
• The placement was supported by Variscan Mines’ largest shareholder, Zinc GroupCo, and also
attracted new sophisticated investors
• Directors provided an additional $100,000 of unsecured working capital loans, convertible into
new shares, on the same terms of the Interim Placement, subject to shareholder approval
• The new funds will further progress the Novales-Udias Project.
Variscan Mines Limited (ASX:VAR) (“Variscan” or “the Company”) is pleased to announce its Appendix 5B
for the quarter ended 30 June 2024 (“Q4 FY24”) and an accompanying operational update for this period.
Variscan’s Managing Director & CEO, Stewart Dickson said,
”We were thrilled to significantly increase the size of our Novales-Udias project during the June 2024 quarter,
with the Company gaining five new licence areas that infill and expand our project tenement area by some
70%. They give us the potential to increase the scale and tonnage in this proven, high grade zinc district. I
personally want to thank the regional government for its goodwill over the negotiation period for these
additional licences. The sign off on these additional tenements clearly demonstrates the strength of our
relationships with both the regional government, and the communities where they are located.
Just after the end of the June 2024 quarter, we issued another round of positive results from ongoing drilling
at the San Jose Mine, which showed excellent intercepts and grades outside the existing Mineral Resource
Estimate model. We fully anticipate that these results, together with future results flowing from the now
upscaled drill program at our Novales-Udias project have us firmly on track to update the Mineral Resource
Estimate by end calendar 2024.
In another important post June 2024 quarter development, we netted almost $0.3 million in interim funding
that will allow us to further progress the Novales-Udias Project, including the current exciting drill program.
The Board wants to thank existing shareholders for their ongoing support in the raise, and also warmly
welcomes new Variscan shareholders joining the register by virtue of this funding initiative.”
2
OPERATIONS REVIEW
Variscan’s exploration and development strategy for the Novales-Udias Project continued to be advanced
over the June 2024 quarter.
Spain – Novales-Udias Zinc Project
The Novales-Udias Project is located in the Basque-Cantabrian Basin, some 30 km southwest from the
regional capital, Santander. The project is centred around the former producing San Jose underground mine
with a large surrounding area of exploration opportunities over the 9km Novales Trend, which includes a
number of satellite underground and surface workings.
The project, which is highly prospective across multiple fronts and located in close proximity to both major
infrastructure requirements and zinc consumers, continued to be the major focus of Variscan’s exploration
and development activities over the three months to 30 June 2024.
New Licences Awarded, Adding Scale to Novales-Udias Project
Early in Q4 FY24, Variscan announced the award of five new exploration licences within the Novales-Udias
region (see ASX announcement dated 8 April 2024). The five new licences, together termed as the
‘Caborredondo’ licences, (see Figure 1 and Table 1 below) are for a three-year period and can be extended
for an additional three years by the Ministry of Industry subject to compliance by filing a report of results of
the exploration program.
Formal ratification of the licences will be made following the review of certain supplementary information to
be supplied by Variscan, including annual work plans, to the satisfaction of the Government of Cantabria. The
award of the licences does not carry a minimum financial spending commitment.
Figure 1. Map of enlarged licence areas including the Caborredondo licences
3
Table 1. Licence areas awarded comprising the Caborredondo Licences
Licence Area
Size (km2)
Esperanza
34.44
Estela
0.56
Elena
0.28
Candela
1.11
Valeria
0.28
Total
36.66
The large licence area (34.4km2) to the east (auspiciously named ‘Esperanza’, the English translation of which
is ‘hope’) has extended the Novales-Udias Trend of zinc mineralization to approximately 12 km in length. The
Novales-Udias Trend is characterised by the former producing, sizeable San Jose and Udias Mines, as well as
numerous historical small-scale mines and workings. The Esperanza licence hosts over a dozen historical
small-scale mines and workings and has multiple positive exploration data, whereas the small licence in the
centre of the already held San Jose mining licence (named ‘Estela’) hosts the main shaft of the Udias mine
(Pozo Madroño) and some major underground developments of the historical Udias Mine.
Geology and Mineralization
The principal geological feature is a wide synclinal structure that characterizes the western end of the BasqueCantabrian Basin, named the Santillana syncline, striking NE-SW. The Caborredondo Licences cover a
significant part of the Santillana syncline, where multiple zinc ore deposits occur. The former producing
world-class Reocín Mine is located on the southeast flank of the syncline, whereas the newly gained ground
occupies a symmetrical position on the northwest flank of the syncline, where dolomitic alteration and zinc
mineralization are well developed in the same Gargasian (Upper Aptian) carbonate beds as found at the
nearby Reocín Mine.
The Reocín deposit is one of the largest known stratabound, carbonate-hosted, zinc-lead deposits in Europe.
The total metal endowment of the deposit, including past production and remaining reserves, is c. 87 Mt of
ore grading 11 percent Zn and 1 percent Pb. (Velasco, 2003). 1
1
Velasco, F., Herrero, J.M., Yusta, I., Alonso, J.A., Seebold, I. and Leach, D., (2003) ‘Geology and Geochemistry of the
Reocin Zinc-Lead Deposit, Basque-Cantabrian Basin, Northern Spain’ Econ. Geol. v.98, pp. 1371-1396.
4
Figure 2. Map of enlarged licence areas and underlying geology
De-risked exploration opportunity to scale-up the Novales-Udias Project
The new licence areas have been explored to a limited extent by Asturiana de Zinc in the 1980s. The data
uncovered to date indicates there is an opportunity to grow the scale of the tonnage of the Novales-Udias
Project.
Historical drilling
The Variscan exploration team have identified the location of 53 drillholes over the Esperanza licence area.
Early work has confirmed historical drill intercepts over the licence areas that include (refer ASX
announcement 8 April 2024):
•
•
•
•
•
•
DDH S-21: 6.0m @ 9.62% Zn
DDH S-163: 7.3m @ 6.50% Zn
DDH S-162: 3.2m @ 9.57% Zn
DDH S-162: 3.3m @ 6.33% Zn
DDH S-162: 2.0m @ 6.73% Zn
DDH S-100: 1.0m @ 6.28% Zn
5
A large amount of regional historical archives, including drillhole data, is currently under review and will be
reported as soon as practicable.
It is very clear that the Esperanza licence area hosts the eastern part of the high-zinc-grade Novales Trend,
which is open to the north-east, and also that the favourable dolomitic strata on the western limb of the
Santillana syncline and dipping east are prime exploration ground for large-scale ‘Reocin-type’ zinc systems,
with all the tell-tale exploration vectoring signs being very encouraging for drilling this area.
Geochemistry
Limited geochemical sampling was conducted by Asturiana de Zinc in the 1980s and shows high grade zinc
results extending northeast from the area of the San Jose Mine and highlighting the extensive length and
width of the Novales Trend as it outcrops on surface (see Figure 2). The more significant zinc anomalies
typically range 4,000 – 9,000 ppm Zn (maximum 33,600 ppm Zn) and 380 – 2280 ppm Pb, making for
compelling drill targets.
Figure 3. Geochemistry shows continuity from San Jose eastwards into the new Esperanza Licence.
6
Former mine workings
The new licence areas also host numerous historical near-surface and underground workings for zinc, such
as the historical small-scale mines of Margarita, Emilia, Soberbia, Pedroso, Cualquiercosa, and a number of
unnamed ones. An area of notable significance is the Estela licence, which hosts the main shaft of the Udias
Mine (Pozo Madroño) and some major underground developments in the central part of the historical Udias
Mine. The award of this licence infills a previous gap in the San Jose mining licence.
Results from current drilling campaign expands mineralisation beyond existing MRE model
Just after the end of Variscan’s Q4 FY24, the Company actioned its stated plans to upscale the duration and
meterage of its underground drilling program at the San Jose Mine (see ASX announcement dated 11 July
2024).
This now-extended drilling campaign is focused on expanding known zones of mineralization and discovering
new zones with a view to supporting an upgraded Mineral Resource Estimate. The underground drilling
program has the following objectives to support the eventual restart of production at the San Jose Mine:
•
•
•
Drill-test structures within and beyond the defined Mineral Resource Estimate (“MRE”) area which
have seen limited exploration drilling
Discover new zones of mineralization to increase overall size of current Mineral Resource Estimate
tonnage
Increase the confidence level of the orebody.
The drilling results reported have targeted Zn-Pb structures identified from geological assessment and the
structural targeting study (refer ASX announcement dated 19 February 2024), which has resulted in a
significantly improved understanding of the controls on multi-phase Zn-Pb mineralization at the San Jose
Mine.
Further, these areas were previously under-explored or under-exploited. The high-grade intercepts reported
hit the cross-cutting D2 structure linking Stope 200 and the La Caseta Trend.
This target area lies outside of the existing MRE model.
7
Figure 4. Plan view of new drill-hole data over the Central Zone, San Jose Mine
The newly identified mineralization arising from these positive drill results is outside the existing MRE and
shows the potential to increase the mineral resource. The drilling results demonstrate significant potential
for resource extensions both above and below the main gallery level.
8
PROJECT SUMMARIES
Spain – Zinc-rich Novales-Udias Project
The Novales-Udias Project is located in the Basque-Cantabrian Basin, some 30 kilometres southwest from
the regional capital, Santander. The project is centred around the former producing San Jose underground
mine with a large surrounding area of exploration opportunities for a number of satellite deposits based on
underground and surface workings, our substantial database of historic drilling and multiple areas of zinc
anomalism identified from recent and historic geochemical surveys. Variscan has defined the NE-SW Novales
Trend over 9 kilometres with a parallel mineralised trend over at least 3 kilometres of strike.
Key highlights of the Novales-Udias Project:
•
•
•
•
•
•
•
•
•
•
•
•
•
Near term zinc production opportunity
Large tenement holding of +100 km2 (including several granted mining tenements)
Regional exploration potential for another discovery analogous to Reocin (total past production and
remaining resource 62Mt @ 8.7% Zn and 1.0% Pb 2,3)
San Jose Mine is within trucking distance of the Glencore zinc smelter in the neighboring region of
Asturias
Classic MVT carbonate hosted Zn-Pb deposits
Historic production of high-grade zinc; average grade reported as around 7% Zn 4
Simple mineralogy of sphalerite – galena – calamine
Ore is strata-bound, epigenetic, lenticular and sub-horizontal
Reported historic production of super high grade ‘bolsas’ (ore bags) commonly 10-20% Zn and in
some instances +30% Zn 5
Assay results of targeted grab samples taken from within the underground Novales Mine recorded
31.83% Zn and 62.3% Pb 6
Access and infrastructure all in place
Local community and government support due to historic mining activity.
Maiden JORC compliant Mineral Resource Estimate of 1.08Mt at 10%Zn established in Q4 2023
1 Velasco, F., Herrero, J.M., Yusta, I., Alonso, J.A., Seebold, I. and Leach, D., 2003 - Geology and Geochemistry of the
Reocin Zinc-Lead Deposit, BasqueCantabrian Basin, Northern Spain: in Econ. Geol. v.98, pp. 1371-1396.
3
Cautionary Statement: references in this announcement to the publicly quoted resource tonnes and grade of the
Project are historical and foreign in nature and not reported in accordance with the JORC Code 2012, or the categories
of mineralisation as defined in the JORC Code 2012. A competent person has not completed sufficient work to classify
the resource estimate as mineral resources or ore reserves in accordance with the JORC Code 2012. It is uncertain that
following evaluation and/or further exploration work that the foreign/historic resource estimates of mineralisation
will be able to be reported as mineral resources or ore reserves in accordance with the JORC Code 2012.
4
Anecdotal evidence from original Novales miners interviewed during the WAI Due Diligence supported with historical
production data from the School of Mines in Torrelavega historical archives
5
4 Anecdotal evidence from original Novales miners interviewed during the WAI Due Diligence supported with
historical production data from the School of Mines in Torrelavega historical archives.
6
Refer to ASX Announcement of 19 December 2019.
2
9
Spain – Guajaraz Zinc-rich Polymetallic Project
The Guajaraz Project is a prospective brown-field zinc-rich polymetallic opportunity with known mineral
occurrences. The project is located in the highly mineralised Central Zone of the Iberian Massif, which ranks
as one of the most mineralised geological units globally and represents the internal zone of the prolific
European Variscan Orogenic belt. Variscan believes Guajaraz represents an excellent, de-risked brownfield
polymetallic project. Reflective of this belief in the prospectivity of this Project, the Company filed an
application with the authorities in Castilla-La Mancha during the year for a 3-year extension of the current
exploration licence over the Guajaraz tenement area. This 3-year extension, covering the period 2023
through 2026 was granted to Variscan Mines’ local Spanish subsidiary, Variscan La Mancha in late October
2023.
FINANCIAL & CORPORATE
Interim funding received will finance ongoing San Jose exploration/development activities
Soon after the end of Variscan’s Q4 FY24, the Company completed interim funding through the placement
of 49,000,000 shares at $0.006 per share (“the Placement”) to sophisticated and professional investors (see
ASX announcement dated 22 July 2024).
The Placement raised $294,000 and included an attaching unlisted option to be issued, subject to shareholder
approval, on the basis of 1 option for every 2 shares taken up in the Placement. The unlisted options will be
exercisable by payment of $0.01 each on or before the date two years from the date of issue.
The Placement shares were issued pursuant to the Company’s capacity under Listing Rule 7.1 and 7.1A.
Furthermore, Working Capital Loans totalling $100,000 have been provided by the Company’s Chairman, Mr.
Tony Wehby and Managing Director, Mr. Stewart Dickson. Key terms of the working capital loans (“Director
Loans”) were agreed as follows:
•
•
•
•
•
The Director Loans are unsecured
The Company is not restricted on how the funds are used
The Director Loans have a maturity date of 31 July 2025
The Director Loans may be converted into ordinary shares, at the election of the Company and
subject to shareholder approval, on the same terms as the Placement
If the Director Loans are not converted into ordinary shares, they attract interest at the rate of 1%
per month.
CASH
Cash at bank at the end of the quarter was $250,000, with a further $210,000 received shortly after the end
of the quarter. The Group continues to enjoy the support of its key shareholders and the Board is currently
in discussions to raise additional capital that it believes will be successful.
10
SUMMARY OF EXPENDITURE ON EXPLORATION ACTIVITIES
For the quarter, the Group spent $174,000 on exploration activities, substantively all of which related to the
Group’s Spanish zinc projects. These exploration activities related to:
•
•
•
•
•
Surface and underground drilling;
Geological mapping and modelling;
Technical consulting fees;
Tenement administration, reporting and management; and
Directly-attributable corporate overheads and administration costs.
In accordance with ASX Listing Rule 5.3.2, the Company advises that no Mining Development or Production
activities were conducted during the quarter.
DEFERRED SETTLEMENT SHARES
In accordance with the acquisition of the Spanish Zinc projects, the Company must issue additional shares
upon the satisfaction of certain exploration milestones. These milestones are for the definition, in accordance
with JORC 2012, of an Inferred Mineral Resource (or greater) of:
•
•
•
Milestone 1: 4 million tonnes at 7% Zn
Milestone 2: 8 million tonnes at 7% Zn
Upon satisfaction of each of these milestones, the Company must issue 27,500,000 ordinary shares
to the vendors of Slipstream Spain Pty Ltd and Slipstream Spain 2 Pty Ltd, and 2,426,471 shares to
Hispanibal S.L. as the vendor of the “Hispanibal Option”, for a total of 59,852,941 Ordinary Shares if
both milestones are met.
There is currently no obligation to issue the milestone shares.
OTHER
During the quarter, the Company made payments to related parties of $23,000, represented by
remuneration paid to Directors.
ENDS
This ASX announcement has been authorised by the Variscan Mines Limited
For further information, please contact:
Variscan Mines Limited (ASX:VAR)
Stewart Dickson
Managing Director & CEO
E: stewart.dickson@variscan.com.au
T: +44 (0) 7799 694195
Media & Investor Enquiries
The Capital Network
Julia Maguire
E: julia@thecapitalnetwork.com.au
P: +61 2 7257 7338
11
About Variscan Mines Limited (ASX:VAR)
Variscan Mines Limited (ASX:VAR) is a growth oriented, natural resources company focused on the acquisition,
exploration and development of high-quality strategic mineral projects. The Company has compiled a portfolio of highimpact base-metal interests in Spain, Chile and Australia. Its primary focus is the development of its advanced zinc
projects in Spain. The Company’s name is derived from the Variscan orogeny, which was a geologic mountain building
event caused by Late Paleozoic continental collision between Euramerica (Laurussia) and Gondwana to form the
supercontinent of Pangea.
To learn more, please visit: www.variscan.com.au
For more information
Follow us on LinkedIn
Follow us on X (formerly Twitter)
Visit our investor website: www.variscan.com.au
COMPETENT PERSONS STATEMENT
The information in this document that relates to the Exploration Target, exploration results and technical information
is based on, and fairly represents information and supporting documentation compiled and reviewed by Dr. Mike
Mlynarczyk, Principal of the Redstone Exploration Services, a geological consultancy acting as an external consultant for
Variscan Mines. Dr. Mlynarczyk is a Professional Geologist (PGeo) of the Institute of Geologists of Ireland, and European
Geologist (EurGeol) of the European Federation of Geologists, as well as Fellow of the Society of Economic Geologists
(SEG). With over 10 years of full-time exploration experience in MVT-style zinc-lead systems in several of the world’s
leading MVT provinces, Dr. Mlynarczyk has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined
in the December 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves” (‘JORC Code’). Dr. Mlynarczyk consents to the inclusion in the report of the matters based upon the
information in the form and context in which it appears.
Where reference is made to previous releases of exploration results and mineral resource estimates in this
announcement, the Company confirms that it is not aware of any new information or data that materially affects the
information included in those announcements and all material assumptions and technical parameters underpinning the
exploration results and mineral resource estimates included in those announcements continue to apply and have not
materially changed.
Reference is made to the following ASX announcements: 28 November 2023; 19 February 2024; 8 April 2024; 11 July
2024; 22 July 2024.
12
Table 2. JORC Mineral Resource Estimate for San Jose Mine and north-eastern Udías by deposit
and classification reported above a 2% Zn cut-off
Deposit
Classification
Indicated
Tonnes (Kt)
490
Zn %
10.0
Pb %
1.7
Zn + Pb %
11.7
Inferred
250
12.3
1.6
14.0
San Jose (NE)
Sub-total
Inferred
740
260
10.8
4.7
1.7
0.1
12.5
4.8
Udías (NE)
Inferred
90
6.5
0.4
6.8
Total
Indicated
490
10.0
1.7
11.7
Inferred
590
8.2
0.8
8.9
Total
1,080
9.0
1.2
10.2
San Jose
Notes:
•
•
•
•
Due to effects of rounding, the total may not represent the sum of all components.
Mineral Resource is reported from all blocks, classified as either Indicated or Inferred, where interpolated block
grade is ≥2.0% Zn
Block model is coded where blocks have been depleted by historical underground mining activities.
A density value of 3 t/m3 is applied to all blocks
13
LISTING OF TENEMENTS HELD AT 30 JUNE 2024
Tenement
SPAIN – Note 5
Tenement No.
Interest
Joint Venture Details
Cantabria
Buenahora Fraction 1
IP 16.662-01
100%
Buenahora Fraction 2
IP 16.662-02
100%
San José
EC 94
100%
La Torra
EC 512
100%
Tres Amigos
EC 1565
100%
Torpeza
EC 2557
100%
Andrea
EC5220
100%
Andrea-demasía a
EC5374
100%
Es
EC8049
100%
Dudosa
EC8165
100%
Cargadoiro
EC11589
100%
Tres amigos-demasía a
EC11594
100%
Flor del pueblo
EC12942
100%
Torpeza-demasía a
EC12952
100%
Torpeza-3ª demasía a
EC13079
100%
Torpeza-2ª demasía a
EC13080
100%
Flor del pueblo-demasía a
EC13154
100%
Dudosa-demasía a
EC13170
100%
Andrea-3ª demasía a
EC13175
100%
Andrea-2ª demasía a
EC13176
100%
Cargadoiro-demasía a
EC13260
100%
Ampliación a Matilde
EC13641
100%
Aumentada
EC14238
100%
Campitos
EC14554
100%
Campitos-demasía a
EC14640
100%
Carmenchu
EC14945
100%
Amelita
EC14949
100%
Eloísa
EC14947
100%
Ampliación a Matilde-demasía a
EC14948
100%
Cargadoiro 2
EC14954
100%
Amelita-demasía a
EC14979
100%
Carmenchu-demasía a
EC14980
100%
Eloísa-demasía a
EC14981
100%
Carmenchu-2ª demasía a
EC14982
100%
6º Aumento a porvenir
EC15672
100%
Ampliación a Matilde-demasía a
EC13641-10
100%
Campitos-segunda demasía a
EC14554-20
100%
Cargadoiro 2- demasía a
EC14954-10
100%
Carmenchu-tercera demasía a
EC14980-30
100%
14
Tenement
6º Aumento a porvenir-demasía a
Tenement No.
EC15672-10
Torpeza-tercera demasía a
EC2557-30
100%
Esperanza
IP 16674
100%
Estela
IP 16672
100%
Elena
IP 16673
100%
Candela
IP 16676
100%
Valeria
IP 16675
100%
Toledo
IP 4.203
Guajaraz
Interest
100%
Joint Venture Details
100%
CHILE
Rosario
Rosario 6 1-40
0310259624
10.4%
Note 4
Rosario 7 1-60
0310259632
10.4%
Note 4
Rosario 101
03102N2229
10.4%
Note 4
Salvadora
0310231355
10.4%
Note 4
Abandonara
0310248487
10.4%
Note 4
Note 1
NEW SOUTH WALES
Willyama
EL 8075
0%
Hillston
EL 6363
39.2%
Native Dog
EL 8236
0%
Note 1
Woodlawn South
ELs 7257 and 7469
0%
Royalty interest only
Junction Dam
EL 5682
0%
Marmota acquired 100% ownership.
See Note 2
Callabonna
EL 5360
49%
Red Metal 51%, can earn 70%
St Pierre
PER
100%
Beaulieu
PER
100%
Perilya can earn 80%, Eaglehawk
9.8%
SOUTH AUSTRALIA
FRANCE
EL
= Exploration License
PER
= Permis Exclusif de Recherche (France)
IP
= Investigation Permit (Spain)
EC
= Exploration Concession (Spain)
15
Note 1:
Under an agreement with Silver City Minerals Limited, Broken Hill Operations and Eaglehawk Geological
Consulting Pty Ltd Variscan has converted its interest in parts of these tenements to a NSR (Net Smelter
Return).
Note 2:
Marmota has earned 100% of the uranium rights only in EL 5682. Variscan has a 0.5% net profits royalty
on production from a uranium mine.
Note 3:
The remaining exploration licenses owned by Variscan Mines SAS (excluding the Couflens PER) have
been conditionally acquired by a new wholly owned subsidiary, Variscan Mines Europe Limited.
Pursuant to the approval for the Subsidiary Sale, the Ministry of Economy and Finance has imposed,
without prior consultation, the compulsory relinquishment of the remaining licenses. The Company has
approved the relinquishment request and has yet to receive a response. The timetable for the
completion of the relinquishment process is unknown.
Note 4:
On 1 July 2019 the Company announced it had successfully renegotiated the terms of the existing
Option Agreement to provide the Company with a participating interest of 10.4%. The Company can
earn up to 90% of the project through payment of amounts totaling approximately US$2.25 million.
16
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Variscan Mines Limited
ABN
Quarter ended (“current quarter”)
16 003 254 395
30 June 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (12
months)
$A’000
-
-
(a) exploration & evaluation
-
(14)
(b) development
-
-
(c) production
-
-
(d) staff costs
(38)
(150)
(e) administration and corporate costs
(100)
(419)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
9
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
Net VAT refunded – Spanish
Operations
-
270
1.9
Net cash from / (used in) operating
activities
(138)
(304)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(1)
(1)
(174)
(1,169)
(e) investments
-
-
(f)
-
-
-
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (12
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(175)
(1,170)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
595
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(72)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
Share issue funds received in
advance
84
184
-
Receipts of Director Working
Capital loans
100
100
184
707
3.10
N
Share your feedback
Discover