Three Fold Increase in High Grade Mineral Resource to 3.4Mt
Released
Released
Announcement PDF
ASX Announcement | 9 December 2024
Variscan Mines Limited (ASX:VAR)
THREE FOLD INCREASE IN THE HIGH GRADE MINERAL RESOURCE
ESTIMATE FOR NOVALES-UDIAS PROJECT TO 3.4Mt
Highlights
• Updated Mineral Resource Estimate (‘MRE’) published for the Novales-Udias Project in
•
•
•
•
•
•
•
Cantabria, northern Spain of: 3.4Mt @ 7.6% Zn, 0.9 %Pb
Total mineral resource growth in only 13 months from initial, maiden MRE
Defined Measured Resources over the Novales-Udias Project for the 1st time
Substantial increase in geological confidence; Measured & Indicated Resources represent
67% of the contained tonnes for San Jose Mine
Forthcoming Mine Re-Start Study to be based on 1.7Mt @ 8.6% Zn, 1.4 %Pb utilizing
Measured + Indicated mineral resources
Updated MRE maintains Novales-Udias as one of the highest grade zinc mineral deposits
currently owned by an ASX listed company
Mineralization remains open along strike, and at depth; +60% of the 12km Novales Trend yet
to be included in a MRE
Current drilling underway at the Udías Mine together with complementary exploration
activities will be included in a further MRE update in 2025
Variscan Mines Limited (ASX:VAR) (“Variscan” or “the Company”) is pleased to report an updated JORC
(2012) compliant Mineral Resource Estimate (“MRE”) for the Novales-Udias Project, located in Cantabria,
northern Spain.
Updated JORC Mineral Resource Estimate delivers substantial growth
Asturmine, an established Spanish mining services company with extensive experience with mineral
resource modelling of zinc deposits, was engaged by Variscan to report an updated MRE for the NovalesUdias Project which includes the San Jose Mine and the adjacent north-eastern part of the Udías deposit.
The updated MRE is 3.4Mt @ 7.6% Zn, 0.9 %Pb at a cut-off grade of 2% Zn+Pb.
Table 1. JORC Mineral Resource Estimate for San Jose Mine and north-eastern Udías by deposit and
classification reported above a 2% Zn+Pb cut-off
Notes:
• Mineral Resource table classified by deposit and reported in accordance with the JORC Code (2012).
• Note that no 3D underground mining model is available for the Udías NE deposit, as a result, all resources in
this area have been classified as Inferred and their actual value may be lower than reported.
Figure 1. JORC Mineral Resource Estimate for San Jose Mine and north-eastern Udías by deposit
2
Variscan’s Managing Director & CEO, Stewart Dickson said,
“This substantial increase to our updated mineral resource estimate centered around the San Jose Mine is a
significant milestone for the Company. It delivers both an increase in size of tonnage and in resource
confidence whilst maintaining high-grade.
We have grown our total mineral resources by over 3x in only 13 months from the initial maiden, MRE. We
have achieved this with exceptional capital efficiency largely due to having in-house underground drilling
capability and making judicious use of our extremely valuable database of historical information. It validates
the success of our exploration activities to date and establishes a platform upon which we can continue to
build a significant high-grade resource inventory as well as advance the Mine Re-Start Study.
It is very satisfying to report mineral resources in the higher Measured category for the first time since we
acquired the Novales-Udias project. This upgrade is significant. Measured & Indicated Resources represent
67% of the contained tonnes for the San Jose Mine where the highest grade (9.18% Zn) is also found in the
Measured category. Having these mineral resources in the higher confidence Measured and Indicated
categories is necessary for the forthcoming Mine Re-Start Study which will be based on 1.7Mt @ 8.6% Zn,
1.4% Pb to ensure a reasonable basis for future production targets and economics published. That remains
on track for delivery by H1 2025.
The upside potential to increase the size of the resource is particularly exciting. Mineralization remains open
along strike and at depth. The Competent Persons confirmed low-risk, high priority zones with the presence
of mineralization beyond the MRE model ready to convert to JORC mineral resources with further drilling.
More broadly, the Company has a number of paths to additional resource inventory growth including:
- our enlarged licence areas cover over 100km2 and are highly prospective offering considerable
exploration upside;
- only 40% of the 12km Novales Trend is incorporated into this updated MRE;
- we are currently drilling for the first time in the Udías Mine, which is outside of the MRE model and is
several times bigger than the San Jose Mine.
We look forward to reporting assay results from the current drill program in early 2025 and anticipate that a
further MRE update will be published in 2025 to incorporate these and other drilling results.
We are continuing to rapidly advance the Novales-Udias Project which is one of the highest-grade,
development stage zinc deposits in Europe. This MRE is an important milestone in our progress towards
achieving our objective of re-starting zinc production.”
3
Executive Summary
The Company engaged specialist Independent Consulting Group, Asturmine 1 to undertake a full review and
assist with preparation of an updated Mineral Resource Estimate.
Asturmine has prepared a Mineral Resource Estimate for the Novales-Udías Project, located in Cantabria,
Spain. This project centres on the historically mined San José Mine deposit, with additional potential in the
surrounding Udías area. The estimation was completed in accordance with the JORC Code (2012) 2,
integrating both historical and modern exploration data to provide a comprehensive evaluation of the
deposit.
The Novales-Udías Project is characterised by Mississippi Valley-Type (MVT) zinc-lead mineralisation hosted
within stratiform dolomitic units. The mineralisation, predominantly zinc with subordinate lead, is epigenetic
in origin and occurs as sub-horizontal lenses controlled by steeply dipping fault zones. These geological
features, along with the straightforward nature of the deposit's mineralogy, underscore its potential for
resource development and eventual economic extraction.
A robust database of 1,331 drill holes forms the basis of the MRE. Historical drilling accounts for 81.7% of the
data, while modern campaigns conducted between 2020 and 2024 contribute the remaining 18.3%. Modern
drilling adhered to strict QA/QC protocols, achieving over 90% core recovery, and all samples were analysed
at an accredited laboratory. This has ensured that the data used for modelling is both reliable and
representative of the deposit.
Resource estimation was conducted using Leapfrog Geo and Leapfrog Edge software, employing an octree
block model with a parent block size of 5 x 5 x 5 metres. Zinc and lead grades were interpolated using ordinary
kriging (OK) after compositing assay samples to 1-metre intervals, the most common length in the database.
The resources were classified into Measured, Indicated, and Inferred categories based on data quality and
geological continuity.
Table 1 presents the estimated Mineral Resources for the Novales-Udías Project, with resources reported
separately for each deposit. It is important to note that no depletion has been applied to the Udías deposit
due to the absence of a 3D underground mining model. Consequently, the resources for Udías have been
classified as Inferred, and their actual value may be lower than reported.
A cut-off grade of 2% Zn was applied to the Mineral Resource Estimate, reflecting industry standards for
similar MVT deposits. To illustrate how different cut-off grades affect the tonnage and average grade of the
mineral resources, a grade-tonnage curve has been generated (refer Figure 11).
Although detailed metallurgical studies are pending, historical records indicate that the ores are suitable for
straightforward processing, producing high-grade zinc and lead concentrates. The deposit's favourable
location within Cantabria, a region with established mining infrastructure, further enhances the project's
development prospects.
1
2
Further details on Asturmine available at: https://www.asturmine.com/en/index.html
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The JORC Code, 2012 Edition. Prepared by: The Joint
Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia
(JORC).
4
Figure 2. Mineral Resource Estimate categories at the San Jose Mine in 3D View
Figure 3. Mineral Resource Estimate categories at the San Jose Mine in Plan View
5
3.1x growth in tonnage & 2.6x growth in contained zinc yet maintains high grade
In just over a year from publication of the project’s maiden MRE (refer ASX Announcement 28 November
2023), Variscan’s exploration success, including highly effective underground drilling which has returned
excellent high-grade results, has directly contributed to notable increases in the size of the MRE illustrated
in Figures 4 and 5.
Figure 4. Growth in contained zinc tonnage from maiden, initial MRE in November 2023 to updated MRE in
December 2024
Figure 5. Growth in resource tonnage from maiden, initial MRE in November 2023 to updated MRE in
December 2024
6
Upside potential for future resource growth & Mineral Resource Estimate updates
Zones of mineralization adjacent to MRE deposits
In addition to the resources defined in the MRE, Asturmine identified additional tonnage which does not
currently meet the JORC classification standards but highlights the presence of mineralization with lower
confidence. These represent mineralized material located more than 50 metres from sample data in the ore
domains. These are assessed to be low-risk, high priority zones beyond the MRE model ready to convert in
JORC mineral resources with appropriate drilling and exploration.
Figure 6. Plan view of potential resources stepping out from MRE deposits
7
Figure 7. Plan view of potential resources stepping out from San Jose MRE deposit
Current drilling at the Udías Mine
Variscan has commenced underground drilling in the Udías Mine (refer ASX Announcement 14 November
2024). The Udías Mine complex is several times bigger than San Jose Mine and has not been previously drilltested by the Company. The southern part of the Udías Mine, exceeding 1.4 km in length, has never been
drilled at all. The Udías Mine complex is directly linked underground to the San Jose Mine near Novales, and
both mines sit on the 12km-long Novales Trend.
The drilling is located outside of the MRE model. First assay results are expected in January 2025. It is
anticipated that a further MRE update will be published in 2025 to incorporate these and other drilling
results.
8
Figure 8. Plan view indicating the location of drilling at Udías Mine being beyond the Mineral Resource
Estimate
Wider Licence Areas
During 2024, 5 new licences, with an area of 36.66 km2, immediately adjacent to the existing San Jose
and Buenahora tenements were granted to Variscan (refer ASX Announcement 8 April 2024). The
enlarged licence areas total over 100km2. They are highly prospective and offer exploration upside; +60%
of the 12km Novales Trend has yet to be incorporated into the MRE. The enlarged licence areas have
historical drilling, workings and some exploration data on them. Variscan will test these areas in due
course.
9
Figure 9. Variscan licence areas offer significant exploration potential to increase the Mineral Resource
Estimate
Mine Re-Start Study will focus on higher confidence Mineral Resources at San Jose Mine
The Mine Re-Start Study will focus on the San Jose Mine using the upgraded Mineral Resource Estimate of
1.7Mt @ 8.6% Zinc, 1.4%Pb for that deposit. Measured & Indicated Resources represent 67% of the
contained tonnes for the San Jose Mine where the highest grade (9.18% Zn) is also found in the Measured
category. Having mineral resources in the higher confidence Measured and Indicated categories is necessary
for the Mine Re-Start Study to ensure a reasonable basis for future production targets and economics
published. Delivery of the study remains on track for delivery by H1 2025.
It is logical to focus on the San Jose Mine as the starting point for potential production as a mining licence is
already granted and infrastructure is in place. Historically San Jose Mine was operated as single, standalone
entity and is today the best geologically understood part of the project.
As the San Jose Mine is directly linked underground to the Udias Mine complex and both mines sit on the
12km-long Novales Trend subsequent, updated MRE and mine studies, may consider combining the deposits
operationally.
10
Figure 10. Simplified geological cross-section showing connectivity and continuity between San Jose Mine
and Udias Mine (refer ASX Announcement 10 September 2024)
Supplementary Information for the Mineral Resource Estimate
The following subsections are provided consistent with ASX Listing Rule 5.8.1, with further information
provided in the JORC Code (2012) – Table 1, which is attached to this announcement.
Geology and Geological Interpretation
The San José-Udías Project is situated in Cantabria, Spain, and is characterised by Mississippi Valley-Type
(MVT) mineralisation hosted within stratiform dolomitic units. The deposit is predominantly zinc-lead, with
zinc being the dominant commodity.
The mineralisation is epigenetic, resulting from hydrothermal fluids migrating along steeply dipping fault
zones and replacing the carbonate host rock. This mineralisation is stratabound and occurs as sub-horizontal
lenses, pods, and veins, often with significant lateral extensions controlled by the fault structures. The lenses
are stacked and separated by barren dolostone units, highlighting the stratiform nature of the deposit.
Dolomitisation is a key geological process in the formation of the deposit, occurring in multiple stages. The
mineralisation is primarily associated with the later phases of dolomitisation. Mineralogical composition is
relatively simple, with zinc sulphides (sphalerite) as the main ore mineral, accompanied by subordinate lead
sulphides (galena) and occasional marcasite. In the oxidised zones of the deposit, Zn is also present as
"calamine", a term locally used to refer to a rock composed of smithsonite and hemimorphite.
Geological interpretation of the deposit integrates historical and recent drilling data, supported by detailed
3D geological modelling. This work has delineated the geometry and continuity of the mineralisation,
allowing for the identification of key zones of economic interest. The deposit is spatially related to the
Novales Trend, which includes multiple prospects with similar geological characteristics, indicating potential
for further resource development along strike and at depth.
Drilling Techniques
The San José-Udías Project integrates historical (1950s–1990s) and modern (2020–2024) drilling campaigns
to support resource estimation. Historical drilling, predominantly diamond core, includes 666 underground
holes (52,148 m) at San José and 154 surface holes (31,238 m) across the project area. While valuable, the
historical data is partially limited due to incomplete documentation of techniques implemented.
11
Modern drilling by Variscan Mines employed advanced diamond drilling methods with rigs such as Hagby
Onram 100 and Atlas Copco Diamec 252, achieving over 90% core recovery. A total of 200 underground holes
(5,499 m) and 3 surface holes (322m) were drilled, focusing on mineralisation continuity. The campaigns
adhered to rigorous quality standards, addressing data gaps and ensuring reliable input for resource
modelling.
Sampling Techniques
Historical Sampling
Historical sampling methods, conducted between the 1950s and 1990s by previous operators, lack
comprehensive documentation. Core samples were predominantly split into half-core for assay, with
sampling intervals varying widely (0.5 m to 3.0 m). In some cases, larger composite samples of up to 10 m
were reported. Due to the absence of QA/QC protocols and limited records, the reliability of historical
samples cannot be fully validated, though their general trends were incorporated into the resource model.
Modern Sampling
Modern sampling, conducted by Variscan Mines from 2020 to 2024, followed strict protocols to ensure
representative and reliable data.
Variscan drill core were sampled as half core with sample lengths ranging between 0.15 m and 1.6 m,
averaging 1.0 m, and include at least 1 m of core adjacent to the start and finish of logged mineralisation.
Variscan Mines samples were selected by geologists based on the logging of mineralised intervals. Sample
recoveries are typically >90%. Detailed geological logging was carried out for all Variscan drill holes, with all
holes photographed before and after cutting of core. Samples were logged for lithology, veins and veining
intensity, alteration and mineralisation.
Representativity and Limitations
While historical sampling provides broader context, modern sampling practices ensure robust and
representative data for mineral resource estimation. The combination of these datasets allows for a
comprehensive understanding of the deposit, though historical limitations are acknowledged.
Sample Analysis Method
All Variscan half core samples were sent directly to the ALS Seville laboratory for preparation and subsequent
analysis according to industry standards with crushing, pulverizing and splitting prior to sample analysis. The
sample sizes taken for the drilling reported are considered suitable for the deposit type and style of
mineralisation at this stage of exploration. The laboratory is accredited (ALS Seville) and the techniques for
Zn and Pb are considered suitable.
No descriptions of the historical assaying and laboratory procedures used have been located by Variscan. It
is unknown whether the techniques used were partial or total.
Estimation Methodology
The resource estimation for the San José-Udías Project was conducted using Leapfrog Geo and Leapfrog Edge,
employing an octree block model. The parent block size was set at 5 x 5 x 5 metres, with a minimum cell size
of 1.25 metres applied through octree subdivision to ensure precision in areas with complex mineralisation.
Ordinary kriging (OK) was used to estimate zinc and lead grades.
12
To ensure consistency and reliability in the estimation process, assay samples were composited into regular
1-metre intervals prior to interpolation. This compositing length was selected as it represents the most
frequent sample interval in the assay database, providing a uniform basis for grade estimation.
The estimation process was designed to balance confidence in well-sampled areas with broader coverage in
less informed zones. Four passes of ordinary kriging were applied, with progressively relaxed data and search
criteria:
Passes 1 and 2 focused on well-informed areas, excluding historical samples longer than 3 metres due to
limited confidence in these data, which likely represent composited intervals. Only reliable, modern data
were utilised in these passes.
Passes 3 and 4 extended the estimation to sparsely sampled areas, incorporating all available data, including
historical samples, regardless of length, to maximise spatial coverage.
This structured approach ensured that the highest-confidence zones were prioritised, while areas with
limited data were also included in the resource estimate, maintaining a balance between reliability and
comprehensiveness.
Mineral Resource Classification
The classification of Mineral Resources is based on the results of ordinary kriging (OK) passes. Classification
was applied to blocks within the mineral domain as follows:
•
•
•
Measured Resources: Blocks estimated in the first pass were classified as measured.
Indicated Resources: Blocks estimated in the second pass were classified as indicated.
Inferred Resources: Blocks estimated in the third and fourth passes were classified as inferred,
provided they were within 50 metres of sample data.
Cut-off Grades
The Mineral Resource report for the deposit was prepared applying a cut-off grade of 2% Zn+Pb. This
threshold, commonly used in Mississippi Valley-Type (MVT) deposits, reflects industry standards for Zn-Pb
mining operations. As the project is still in the exploration phase, insufficient cost and revenue data exist to
precisely calculate an economic cut-off grade. However, the selected value provides a reasonable benchmark
for the current stage of the project.
13
Figure 11. Cut-off grade sensitivity: Zn+Pb Grade Tonnage Curve
Mining and Metallurgical Methods
Mining Methods
The deposit's geometry, consisting of stratiform, sub-horizontal lenses, is well-suited for underground mining
methods, similar to those employed during historical operations. Future mining is anticipated to use modern
mechanised techniques to improve efficiency and reduce costs. Detailed mining studies will be required to
evaluate the economic viability of extraction and confirm the suitability of specific methods.
Metallurgical Methods
Preliminary metallurgical assessments indicate that the simple mineralogy of the deposit, dominated by zinc
sulphides with subordinate lead sulphides and minor iron sulphides, supports straightforward processing.
ENDS
This ASX announcement has been approved by the Board and authorised for issue by Mr Stewart Dickson, Managing
Director and CEO, Variscan Mines Limited
14
For further information, please contact:
Variscan Mines Limited (ASX:VAR)
Stewart Dickson
Managing Director & CEO
E: stewart.dickson@variscan.com.au
T: +44 (0) 7799 694195
Media & Investor Enquiries
The Capital Network
Julia Maguire
E: julia@thecapitalnetwork.com.au
P: +61 2 8999 3699
About Variscan Mines Limited (ASX:VAR)
Variscan Mines Limited (ASX:VAR) is a growth oriented, natural resources company focused on the acquisition,
exploration and development of high-quality strategic mineral projects. The Company has compiled a portfolio of highimpact base-metal interests in Spain, Chile and Australia. Its primary focus is the development of its advanced zinc
projects in Spain. The Company’s name is derived from the Variscan orogeny, which was a geologic mountain building
event caused by Late Paleozoic continental collision between Euramerica (Laurussia) and Gondwana to form the
supercontinent of Pangea.
To learn more, please visit: www.variscan.com.au
For more information
Follow us on LinkedIn
Follow us on Twitter
Visit our investor website: www.variscan.com.au
15
Competent Person Statement
The information in this report that relates to Mineral Resources is based on, and fairly represents, information compiled
by Mr Juan Antonio Fernández García and Dr Mike Mlynarczyk.
Mr Juan Antonio Fernández García is a Principal Consultant and Competent Person at Asturmine and is a Member of
the Australasian Institute of Mining and Metallurgy (MAusIMM(CP)). Mr Fernández García has sufficient experience
relevant to the style of mineralisation and type of deposit under consideration, as well as the activity being undertaken,
to qualify as a Competent Person as defined in the 2012 Edition of the JORC Code. Mr Fernández García assumes
responsibility for matters related to Section 3 of the JORC Table 1 and consents to the disclosure of the information in
this report in the form and context in which it appears.
Dr Mike Mlynarczyk is the Principal of Redstone Exploration Services, a geological consultancy acting as an external
consultant to Variscan Mines. He is a Professional Geologist (PGeo) of the Institute of Geologists of Ireland and the
Spanish Official Professional Association of Geologists, as well as a European Geologist (EurGeol) of the European
Federation of Geologists, and a Fellow of the Society of Economic Geologists (SEG). With over 13 years of full-time
exploration experience in MVT-style zinc-lead systems in several of the world's leading MVT provinces, Dr Mlynarczyk
has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the
activity being undertaken to qualify as a Competent Person as defined in the December 2012 edition of the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Dr Mlynarczyk assumes
responsibility for matters related to Sections 1 and 2 of the JORC Table 1 and consents to the disclosure of the
information in this report in the form and context in which it appears.
Forward Looking Statements
Forward-looking statements are only predictions and are not guaranteed. They are subject to known and unknown risks,
uncertainties and assumptions, some of which are outside the control of the Company. Past performance is not
necessarily a guide to future performance and no representation or warranty is made as to the likelihood of
achievement or reasonableness of any forward-looking statements or other forecast. The occurrence of events in the
future are subject to risks, uncertainties and other factors that may cause the Company’s actual results, performance
or achievements to differ from those referred to in this announcement. Given these uncertainties, recipients are
cautioned not to place reliance on forward looking statements. Any forward-looking statements in this announcement
speak only at the date of issue of this announcement. Subject to any continuing obligations under applicable law and
the ASX Listing Rules, the Company, its directors, officers, employees and agents do not give any assurance or guarantee
that the occurrence of the events referred to in this announcement will occur as contemplated.
16
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
techniques
•
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of sampling.
•
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any measurement
tools or systems used.
•
Aspects of the determination of mineralisation that are Material to
the Public Report.
•
In cases where ‘industry standard’ work has been done this would
be relatively simple (eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a 30
g charge for fire assay’). In other cases more explanation may be
required, such as where there is coarse gold that has inherent
sampling problems. Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of detailed
information.
Commentary
•
The drilling data of the San Jose mine and adjacent area that is
referenced in this report relate to historical surface and
underground drilling conducted by previous operators, as well as to
the underground and surface drilling conducted in the area by
Variscan Mines in the years 2020-2024. The complete information
on the multiple drilling campaigns of various vintages is extensive
and can be found in ASX press releases by Variscan Mines of 3rd
February 2020, 3rd March 2020, 16th March 2020, 1st April 2020,
9th March 2021, 25th May 2021, 15th June 2021, 4th August 2021,
15th March 2022, 7th July 2022, 25th August 2022, 2nd March
2023, 7th August 2023, 5th October 2023, and 11th July 2024 on the
website www.variscanmines.com.au.
•
Historical data is sourced from previous project operator
exploration activities, performed from the 1950’s to the late 1990’s.
Historical data includes both underground and surface core drilling,
of which the paper-format core logs and location maps are held at
the School of Mines and Energy Engineering at Torrelavega, a
faculty of the University of Cantabria, Spain.
•
Due to the incomplete nature of the historical drill hole data,
including procedures, a comment on the sample representativity or
calibration of measurement tools or systems used by historical
17
Criteria
JORC Code explanation
Commentary
workers cannot be made, and these cannot be considered ‘industry
standard’ by modern standards.
•
Historical drilling includes 666 holes (52,148 m) drilled underground
at San Jose; 105 holes (6,294 m) drilled underground at Udías; and
154 holes (31,238 m) drilled from surface. All underground drill
collars from San Jose have been located and re-surveyed by
Variscan and the hole azimuth and dips measured at the collar
positions. Also, a selection of drill holes from Udias and selected
surface drill holes have been located and re-surveyed in the field, as
part of vetting the historical datasets.
•
Variscan Mines underground drilling data referenced in this report
comprises 200 diamond drill holes (totalling 5,499 m). Details of
Variscan’s underground drilling campaigns were provided in
Variscan Mines ASX press releases.
•
In addition to underground drilling, limited surface diamond drilling
was conducted by Variscan Mines. Drilling consisted of 3 surface
drill holes (totalling 322 m of core), and details were provided in the
Variscan Mines ASX press release of 2nd March 2023.
•
All diamond drilling of Variscan Mines was sampled using industry
best practice methods: most diamond drilled core was cut along its
length to produce half core, which was then assayed, except for the
last 60 holes (totalling 1502m) drilled with a portable drill that were
assayed as full core owing to the comparatively small drill core
diameter of 37mm. The samples were sent to the accredited ALS
Seville laboratory for analysis. Samples are considered
18
Criteria
JORC Code explanation
Commentary
representative
Share your feedback
Discover