Variscan Mines Limited (ASX:VAR)
EXPLORATION & OPERATIONAL UPDATE
Highlights
•
•
•
•
•
Maiden underground drilling campaign at Udias Mine progressing well
Assays from drilling at Udias are due imminently
Mine Re-start Study progressing with number of workflows advanced:
o Metallurgical test work
o Geotechnical test work
o Development of Mineral Resource Model
Geophysics at Guajaraz complete
Strategy: Updated Explorer-Producer model
Variscan Mines Limited (ASX:VAR) (“Variscan” or “the Company”) is pleased to provide the following
exploration and operational update.
Assay results imminent from maiden drilling campaign in the Udias Mine complex
Varsican commenced drilling in Q4 2024, targeting on-trend extensions of ore horizons informed by
historical face sampling which returned grades in excess of 40% zinc (refer ASX announcement 10
September 2024).
In accordance with our stated plan, drilling has focused on the southern end of the Udias Mine in the
upper A Level (shown in blue in Figure 1) where 9 holes have been drilled to date (see Figure 2). Diamond
core from 5 drillholes was submitted to ALS Global laboratories for assay testing prior to Christmas with
results due for reporting imminently.
The drill has now moved to the middle B level (shown in pink in Figure 1) to drill test this underlying
mineralized horizon. There has been no previous drilling on either A or B levels as the Udias Mine was
only historically exploited for calamine, leaving zinc-rich sulphides in-situ. The areas being drilled are
all located outside of the existing Mineral Resource Estimate model and are expected to add to an
updated MRE, anticipated for later in 2025.
All of the historical data collated, together with the Company’s geological inspection of the existing
Udias Mine development, indicates excellent continuity of mineralisation extending along strike for over
2km in a south-west direction from the San Jose Mine. The style of zinc mineralisation is identical to that
found at the San Jose Mine, as it is vertically stacked horizons of high-grade zinc sulphides occurring at
the same elevation (i.e., no vertical offset) as at the San Jose Mine.
Figure 1. Plan view of southern end of the Udias Mine indicating areas of drilling, development and
mine access
2
Figure 2. Orientated view of southern end of the Udias Mine showing drillhole locations
Assay results also expected from the San Jose Mine
Concurrently with the submission of core samples from the Udias Mine, samples from 16 drillholes
from the San Jose Mine were also sent for assay testing. These drillholes were completed prior to the
commencement of the Udias drill campaign and had been designed to drill test potential feeder zones
in the Central Zone of the San Jose Mine. Results are due for reporting very shortly.
3
Mine Re-Start Study
Work is progressing across a number of critical workstreams feeding directly into the Mine Re-Start
Study.
Metallurgical test work
The aim of the metallurgical testing is to corroborate data from historic mining operations with an added
pre-concentration step built into the process. Data generated through the programme will be used to
aid capital expenditure estimations for a modular processing facility and to also support recovery and
concentrate quality assumptions applied in the study.
The metallurgical testing has therefore been split into 4 main phases:
1.
2.
3.
4.
Sample preparation prior to pre-concentration
Ore sorting with TOMRA and Heavy Liquid Separation (‘HLS’) pre-concentration methods
Comminution testing on pre-concentrated products
Confirmation flotation tests
During the period of previous operation of the San Jose Mine, a simple, conventional flowsheet was
used achieving +50% zinc grade concentrates with single stage flotation. No pre-concentration
methods were used at the time. It is anticipated that pre-concentration will provide added value by
removing excess dilution from the ore feed prior to entering the comminution and floatation circuits.
This would show an increase in zinc ore feed grade and reduce the processing plant capex due to the
reduced throughput required. Sample preparation to the required size fractions for ore sorting have
been completed for dispatch to TOMRA in Germany for ore sorting trials. Heavy Media Separation trials
are already underway in the UK.
Geotechnical test work
Preliminary laboratory testing to derive the Uniaxial Compressive Strength (‘UCS’) of the rock units
found at San Jose Mine are underway in the UK. Quantifying the rock strength properties and domaining
their locations in the mine feeds directly into the geotechnical considerations for mine planning. The
current condition of the mine shows high levels of rock competency and strength with limited need for
rock reinforcement systems. As the majority of the San Jose underground workings are still accessible,
a geotechnical work program of back analysing the historical stope voids is well advanced. The results
of this work will add confidence to the geotechnical assumptions applied in the Mine Re-Start Study.
Geological modelling
Following on from the upgraded Mineral Resource Estimate of 3.4Mt @ 7.6% Zn, 0.9 %Pb (refer ASX
announcement 9 December 2024), modelling has been developed to update waste estimation and
density calculations. The lithological model has also been updated.
4
Geophysical Survey complete at Guajaraz Project
A Deep Ground Penetrating Radar (‘DGPR’) geophysical survey totalling 8165 linear metres (5775m in
the La Union Mine area and 2390m in the Tio Cobos prospect area) has been completed over the
Guajaraz project in Castilla-La Mancha, central Spain.
DGPR has been used to identify differences in geophysical properties of the underlying rocks, as well
as any fractures, faults, veins and lodes, to assist in the generation of drill targets.
In total, 17 profiles with 1.5m spacing, using the "Loza-2N" ground penetrating radar with a 6m long
receiver antenna (25 MHz) and a 20mW (21kV) transmitter have been run. Results are expected to
reported by end of current Quarter.
Figure 3. Plan view of DGPR lines over Tio Cobos prospect area
5
Figure 4. Plan view of DGPR lines over La Union Mine area
Explorer-Producer Strategy
Variscan is confident that its Explorer-Producer strategy is appropriate for the assets we hold and the
funding conditions available for companies of this size. Our primary focus remains on moving the
Novales-Udias Project towards restarting production, including testing extensions of the existing
underground and adding additional prospective tenements for incorporation into later development.
The rationale for a phased mining scale-up is for the operations to fund a cycle of increasing activity
both in production and exploration. We consider this to be an important differentiator for Variscan, as
there currently exists a mismatch between funding available for exploration companies and the metals
required for economic prosperity.
The strategy is designed to capitalise on the advantages represented by our advanced, de-risked and
high-grade former mine, while recognising the potential opportunities in and around it that remain
underexplored. In addition to the focus on the Novales-Udias Project we continue to assess exploration
opportunities both within our tenement portfolio and more broadly available through our industry
networks.
6
Next Steps & Way Forward
The Novales-Udias Project continues to progress, with the following demonstrable milestones
expected:
•
•
•
•
Assay results from underground drilling at the Udias Mine
Assay results from underground drilling at the San Jose Mine
Metallurgical and geotechnical test work results
Geophysical survey results at Guajaraz project
Variscan’s Managing Director & CEO, Stewart Dickson, said:
“We have hit the ground running in 2025 and whilst not immediately visible we are busy across a number
of important work streams for our future growth.
I am looking forward to reporting the results of Variscan drill-testing the Udias Mine complex for the first
time. This is a very exciting growth opportunity that was only unlocked last year through the acquisition
of a key licence area. We have moved quickly to drill using our own resources and have assays due
imminently. The Udias Mine complex is significantly larger than the San Jose Mine with current drilling
outside of the Mineral Resource Estimate, therefore there is genuine potential to add significant tonnage
and scale to this high quality project.
Many workstreams are in train to progress the Mine Re-Start Study. We will feed results and delivery
milestones into the market as they arise. I am particularly interested in the results from the metallurgical
test work underway. We are poised to unlock further value from one of the highest-grade, development
stage zinc deposits in Europe, which is continuing to make good progress towards re-starting
production. Our Explorer-Producer strategy reflects the quality and advantages of the Novales-Udias
Project as well as considering the local and macro environments in which we operate. I am extremely
excited about the Company’s prospects and plans”
ENDS
This ASX announcement has been approved by the Board and authorised for issue by Mr Stewart Dickson,
Managing Director and CEO, Variscan Mines Limited
For further information, please contact:
Variscan Mines Limited (ASX:VAR)
Stewart Dickson
Managing Director & CEO
E: stewart.dickson@variscan.com.au
T: +44 (0) 7799 694195
Media & Investor Enquiries
Jane Morgan Management
Chloe Hayes / Jane Morgan
E: chloe@janemorganmanagement.com.au / jm@janemorganmanagement.com.au
P: + 61 (0) 458619317/ +61 (0) 405 555 618
7
About Variscan Mines Limited (ASX:VAR)
Variscan Mines Limited (ASX:VAR) is a growth oriented, natural resources company focused on the acquisition,
exploration and development of high-quality strategic mineral projects. The Company has compiled a portfolio of
high-impact base-metal interests in Spain, Chile and Australia. Its primary focus is the development of its
advanced zinc projects in Spain. The Company’s name is derived from the Variscan orogeny, which was a geologic
mountain building event caused by Late Paleozoic continental collision between Euramerica (Laurussia) and
Gondwana to form the supercontinent of Pangea.
To learn more, please visit: www.variscan.com.au
For more information
Follow us on LinkedIn
Follow us on Twitter
Visit our investor website: www.variscan.com.au
8
Project Summary
The Novales-Udias Project is located in the Basque-Cantabrian Basin, some 30km southwest from the regional
capital, Santander. The project is centred around the former producing San Jose underground mine with a large
surrounding area of exploration opportunities which include a number of satellite underground and surface
workings and areas of zinc anomalism identified from recent and historic geochemical surveys. Variscan has
delineated a significant 9km mineralised trend and a sub-parallel 3km trend from contemporary and historical
data across both the Buenahora exploration and Novales mining permits.
The San Jose Mine is nearby (~9km) to the world class Reocin Mine which is the largest known strata-bound
carbonate-hosted Zn-Pb deposit in Spain 1 and one of the world’s richest MVT deposits 2. Further it is within
trucking distance (~80km) from the San Juan de Nieva zinc smelter operated by Asturiana de Zinc (100% owned
by Glencore). Significantly, the Novales-Udias Project includes a number of granted mining tenements 3.
Novales-Udias Project Highlights
• Near term zinc production opportunity (subject to positive exploration and development work)
• Updated JORC compliant Mineral Resource Estimate of 3.4Mt @ 7.6% Zn, 0.9 %Pb released in December
2024
• Large tenement holding of +100 km2 (including a number of granted mining tenements)
• Regional exploration potential for further discoveries analogous to Reocin (total past production and
remaining resource 62Mt @ 8.7% Zn and 1.0% Pb 45)
• Novales-Udias Project is within trucking distance (~ 80km) from the zinc smelter in Asturias
• Classic MVT carbonate hosted Zn-Pb deposits
• Historic production of high-grade zinc; average grade reported as ~7% Zn 6
• Simple mineralogy of sphalerite – galena – calamine
• Mineralisation is strata-bound, epigenetic, lenticular and sub-horizontal
• Reported historic production of super high grade ‘bolsas’ (mineralised pods and lenses) commonly 1020% Zn and in some instances +30% Zn 7
• Access and infrastructure all in place
• Local community and government support due to historic mining activity
Velasco, F., Herrero, J.M., Yusta, I., Alonso, J.A., Seebold, I. and Leach, D., (2003) ‘Geology and Geochemistry of the Reocin
Zinc-Lead Deposit, Basque-Cantabrian Basin, Northern Spain’ Econ. Geol. v.98, pp. 1371-1396.
2
Leach, D.L., Sangster, D.F., Kelley, K.D., Large, R.R., Garven, G., Allen, C.R., Gutzner, J., Walters, S., (2005) ‘Sedimenthosted lead-zinc deposits: a global perspective’. Econ. Geol. 100th Anniversary Special Paper 561 607
3
Refer to ASX announcement of 29 July 2019
4
Velasco, F., Herrero, J.M., Yusta, I., Alonso, J.A., Seebold, I. and Leach, D., 2003 - Geology and Geochemistry of the Reocin
Zinc-Lead Deposit, Basque-Cantabrian Basin, Northern Spain: in Econ. Geol. v.98, pp. 1371-1396.
5
Cautionary Statement: references in this announcement to the publicly quoted resource tonnes and grade of the Project
are historical and foreign in nature and not reported in accordance with the JORC Code 2012, or the categories of
mineralisation as defined in the JORC Code 2012. A competent person has not completed sufficient work to classify the
resource estimate as mineral resources or ore reserves in accordance with the JORC Code 2012. It is uncertain that following
evaluation and/or further exploration work that the foreign/historic resource estimates of mineralisation will be able to be
reported as mineral resources or ore reserves in accordance with the JORC Code 2012.
6
These figures have been taken from historical production data from the School of Mines in Torrelavega historical archives.
7
Reports of the super high-grade mineralisation are supported with historical production data from the School of Mines in
Torrelavega historical archives. (Refer ASX release 29 July 2019)
1
9
Figure 5. Map of Novales-Udias Project Licence Areas with Udias Mine highlighted
Figure 6. Map of Novales-Udias Project Licence Areas and local infrastructure
10
Competent Person Statement
The information in this document that relates to technical information about the Novales-Udias project is based
on, and fairly represents information and supporting documentation compiled and reviewed by Dr. Mike
Mlynarczyk, Principal of the Redstone Exploration Services, a geological consultancy acting as an external
consultant for Variscan Mines. Dr. Mlynarczyk is a Professional Geologist (PGeo) of the Institute of Geologists of
Ireland, and European Geologist (EurGeol) of the European Federation of Geologists, as well as Fellow of the
Society of Economic Geologists (SEG). With over 10 years of full-time exploration experience in MVT-style zinclead systems in several of the world’s leading MVT provinces, Dr. Mlynarczyk has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the December 2012 edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (‘JORC Code’). Dr. Mlynarczyk
consents to the inclusion in the report of the matters based upon the information in the form and context in which
it appears.
The information in this document that relates to previous exploration results was prepared pre-2012 JORC code.
It is the opinion of Variscan that the exploration data is reliable. Although some of the data is incomplete, nothing
has come to the attention of Variscan that causes it to question the accuracy or reliability of the historic
exploration.
Forward Looking Statements
Forward-looking statements are only predictions and are not guaranteed. They are subject to known and unknown
risks, uncertainties and assumptions, some of which are outside the control of the Company. Past performance
is not necessarily a guide to future performance and no representation or warranty is made as to the likelihood of
achievement or reasonableness of any forward-looking statements or other forecast. The occurrence of events in
the future are subject to risks, uncertainties and other factors that may cause the Company’s actual results,
performance or achievements to differ from those referred to in this announcement. Given these uncertainties,
recipients are cautioned not to place reliance on forward looking statements. Any forward-looking statements in
this announcement speak only at the date of issue of this announcement. Subject to any continuing obligations
under applicable law and the ASX Listing Rules, the Company, its directors, officers, employees and agents do
not give any assurance or guarantee that the occurrence of the events referred to in this announcement will occur
as contemplated.
11
Share your feedback
Discover